Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Z Lot zZ7 Zone of Contribution: In_ Out Acreage �s �/n� / �, / Commercial: Residential: Street: � �/�/lam / Village: Floor Plan: ' #Bedrooms: .2 " a2 Ka - Owner: ("i/4/ Installer: / , / _ J./ , /„/.. i Address: Phone: /i - Z/ , Phone: Builder: Engineer: 7-11-1) ' Address: 7 Phone: -xa 5 24-25- Phone: (�,/ 4 f N/A YES NO 1.Required#of copies received // 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material,above water table _ �,..' 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: t-----"- 5. /5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands ‘.. e:,„ 7. Septic tank minimum 10 ft from foundation,deck Var.: �✓ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L., 9.Leaching minimum 100 ft from wetlands Var.: �/ ��1110.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: '1/4.../".-- 11. .Tank/leaching minimum 10 ft from property line Var.: / t7H....z., 12. System meets all other setback requirements Var.: d ` 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or botto e]� Var.: , 15. System not in top or subsoil(A,B horizons)or 5'remova 16.Proposed contours are suitable ,_/ 17. System meets slope requirements-min. 1/8", 'A"preferred /�_' �' 18. System meets breakout requirements PVC liner: q-0 wiWall: <,_% 19. Specified tee sizes are proper,gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal - 11 22. System adequately sized for its intended use 1/' 23.Minimum 6"stone or compacted below tank and dbox cI/ 24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach field _‘.< 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size �/ 28. Septic tank/pump chamber to be factory waterproofed k.7: . 29.Vent provided if leaching below 3 feet,under driveway/parking � 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater `/ 34. Title V Application and permit fee, installer signature i.� 35.Foundation footing min.2 feet above adjusted ground water for new house __.---- 36. Deed Restriction required max. #bedrooms: max. flow: gpd ,--- r 37.Check area lots for groundwater/Label groundwater in Assessor's Map ----' Plan reviewed by: 6 6/03/03