Loading...
HomeMy WebLinkAboutEngineered Plans - 2019Wells not shown exceed 150' from the proposed SAS i 1' 49.2 S 87' 18'01 " E VENT N I I Utility I' Pole BENCHMARK: EI. 51.44 (Assumed Datum) Top of Threshold G--s=`117MGDD MAY 3 12019 HEALTH DEPT. Yarmouth Health Department "' -- -- /'KU/'UbtU 1OW-GALLUN 1 _ SEPTIC TANK (H-/0) I SCALE: 1" - 20' I 0 20 40 60 PROPOSED LEACH/NG AREA ' 50.5'X 12.8'X 2.0' (H-/0) I ® 2019 Moran Engineering Associates, LLC En Deed: Book 10730, Page 151 LEGEND Septic Test Hole 51TE AND SEWAGE PLAN UBJECL 49 North Main Street So. Yarmouth, MA U FARED FOR: David Paradise SSESSORS'IIY. SHEET: 70/2 SHEET 1 of 2 04/19/2019 1 19-068 Moran Engineering Associates, LLC 941 Route 28 — PO Box 183 South Harwich, MA 02661 508-432-2878 Existing Building Edge of Driveway -50-- - Existing Contour JExisting Cesspools Proposed Septic 52.7 Existing Spot Elevation -- OHU -- Overhead Utility Lines - — - W - — Existing Water Line - — - G - — Existing Gas Line x Existing Fence Line Septic Test Hole 51TE AND SEWAGE PLAN UBJECL 49 North Main Street So. Yarmouth, MA U FARED FOR: David Paradise SSESSORS'IIY. SHEET: 70/2 SHEET 1 of 2 04/19/2019 1 19-068 Moran Engineering Associates, LLC 941 Route 28 — PO Box 183 South Harwich, MA 02661 508-432-2878 ELEV. 47.9 46.4 38.9 PROFILE DBETWEEN (SEPTIC HOR. TEXTURE GRADED L LD,* AND TANK 2. INSTALL CONTROL BOX COVERS SEPTIC TANK IRRIGATION Not to Scale 12' OVER uo s. CLEAN-OUT 1500 GAL TOP OF Ln Granular EL. 50.5 FOUNDATION COVERS (2) TO BE WITHIN 6- OF GRADE 4- V Dr ACCESS PORTS --r� A: EL. 48.2 s"MIN B: EL. 48.0 5- 2 2•-3• 10" MIN 14" MIN _ C: EL. 48.2 EL. 47.25 1,500 4.o' D: EL. 48.8 GALLON I� r. A: 36'±, B: 32'±, C: 21', D: 40' 1. Replace any Orangeburg sewer line(s) back to original cast iron or PVC as needed. LEVET. STABLE BASE 71 aim ' U MIIQ 9' COVER EL.49.0-50.0 MAX. 36' COVER ACCE55 PORT TO WITHIN 6" OF FINAL GRADE 77 Lj ` • 4' SCH. 40 P.V.C.,-.•.�' . EL. 47.0 EL. 46.8 EL. 46.6 EL. 46.2 1. Extend inlet tee 10" min, below flow line, extend outlet tee 14" below flow line. 2. Provide 20" manholes over center of tank, inlet and outlet with readily removable impermeable covers. 3. Install access port over inlet and outlet with precast concrete or equivalent watertight riser within 6" min. of final grade. DEEP HOLE LOGS DEEP OBSERVATION HOLE # 1 TEST BY: RICK JUDD DATE: 04/10/2019 From Surface HOR. TEXTURE COLOR (MUNSELL) REDOX. FEATURES STRUCTURE CONSISTENCY, OTHER 12' Ap Sandy Loam 7.5 YR 312 NO Granular 30" Bw Loamy Fine Sand 10 YR 4/6 NO Very Friable 12T C Fine to Medium Sand 2.5 Y 6/4 NO Loose, Single Grain BOTTOM OF PERC.: 60" in C -Layer RATE: < 2 Min / Inch WITNESS: Amy Von Hone, Yarmouth Health Department LOADING RA -11t: 0.74 OPD/SF 10 2019 Moran Engineering Associates, LLC LEVEL STAM BASE 10'± EL.44.2 I 4.0' 21'± STONE "D" BOX NOTES 1. When system is dosed or slope of inlet pipe exceeds 0.08'/f t. install inlet tee cut-off one inch above outlet invert. 2. Install outlet pipes level 2 feet minimum. 3. Provide a minimum sump of 6" below outlet invert. 4. Install access port over "D" Box with precast concrete or equivalent watertight riser within 6" min. of final grade. DESIGN 1. REQUIRED FLOW: 6 BEDROOMS X 110 GPD/B.P. 660 GPD 2. SEPTIC TANK CAPACITY: 660 GPD X 2 = 1320 GPD USE (1)1500- GALLON (H-10) SEPTIC TANK 3. LEACH FACILITY DESIGN: 50.5' X 12.8'X 2.0' (H-10) SIDE WALL AREA: 2 (50.5 + 12.8) X 2.0 X 0.74 GPD/SF = 187.3 BOTTOM AREA: 50.5 X 12.8 X 0.74 GPD/SF = 478.3 TOTAL: 665.6 665 GPD PROVIDED > 660 GPD REQUIRED USE: (5) 8.5' L X 4.8' W X 2.0' D CHAMBERS (H-10) WITH 4.0' OF 3/4" TO 1-1/2" DOUBLE WASHED STONE ALONG ENDS AND SIDES. CONSTRUCTION NOTES INSTALL (3) ACCESS PORTS OVER LEACH FACILITYLEACH CHAMBERS W/PRECAST DROPOSED OME VENT 500 GAL DRY WELLS CONCRETE (OR EQUIV.) WATERTIGHT RISER WITHIN 3" (MIN.) OF FINAL GRADE MIN. 2% SLOPE MIN. 9" COVER 2' LAYER OF 1/8" TO 1/2' DOUBLE MAX. 36" COVERI " I WASHED STONE OR FILTER FABRIC OVER ENTIRE LEACH AREA. ti ti ��` ti t• � a, r• r• �a• ra rim ra ra ri \ri e• a• 3/4' TO 1-1/2" DOUBLE WASHED STONE STONE5 3' TO BOTTOM OF •42.5' LENGTH INSTALLED 'OVERALL LENGTH INSTALLED EL. 38.9 - NO WATER ENCOUNTERED GENERAL NOTES 1. ALL SYSTEM COMPONENTS SHALL BE INSTALLED IN ACCORDANCE W/TITLE 5 OF THE SANITARY CODE & ANY APPLICABLE REGULATIONS. 2. PRIOR TO BACK FILLING THE INSTALLATION, THE DESIGNER & HEALTH AGENT SHALL BE NOTIFIED FOR INSPECTION. 3. ANY ALTERATIONS OF THIS DESIGN MUST BE APPROVED BY THE DESIGNER & BOARD OF HEALTH, IN WRITING. 4. SYSTEM IS NOT DESIGNED FOR A GARBAGE GRINDER. 5. THE INSTALLER IS TO VERIFY THE LOCATION(S) OF UTILITIES, CESSPOOL(S) AND SEWER INVERTS PRIOR TO CONSTRUCTION. 6. ALL UNSUITABLE MATERIAL WITHIN 5 FT. IN ALL DIRECTIONS FROM THE SOIL ABSORPTION SYSTEM SHALL BE REMOVED & REPLACED W/CLEAN, COARSE SAND. 7. ALL FILL MATERIAL UTILIZED FOR THE SOIL ABSORPTION SYSTEM SHALL BE CLEAN, COARSE SAND FREE FROM DELETERIOUS MATERIAL AND SHALL HAVE A PERCOLATION RATE OF LESS THAT 2 MIN./IN. BEFORE & AFTER PLACEMENT. 8. EXISTING CESSPOOL(S) TO BE PUMPED AND BACK FILLED PER TITLE 5 ABANDONMENT PROCEDURES. 9. DURING INSTALLATION, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A SAFE EXCAVATION AREA. 10. GROUND COVER OVER SEPTIC SYSTEM COMPONENTS SHALL NOT EXCEED 36". 11. ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE NOTED. THE MINIMUM SLOPE OF 4" DIA. SCH 40 PVC SHALL NOT BE LESS THEN 0.01 FT/FT. 12. WHEREVER SEPTIC LINES CROSS WATER SERVICE LINES OR WHEN WATER SERVICE LINES COME WITHIN 10' OF THE PROPOSED S.A.S.- PIPES SHALL BE CLASS 150 PRESSURE PIPE & SHOULD BE PRESSURE TESTED TO ASSURE WATER TIGHTNESS. COORDINATE WITH LOCAL WATER DEPARTMENT. 13. PLACE MAGNETIC MARKING TAPE OVER ALL COMPONENTS. 1. CONTACT OFFICE (508-432-2878) A MINIMUM OF 48 HOURS PRIOR TO START OF PROJECT. 2. EXISTING SEWER ELEVATIONS ARE TO BE VERIFIED PRIOR TO THE INSTALLATION OF NEW SYSTEM COMPONENTS. 3. WATER TESTING OF HOUSE FIXTURES IS REQUIRED, PRIOR TO PLACEMENT OF SEPTIC TANK, TO CONFIRM ALL DISCHARGE EXITS LINES FOUND. 4. INSTALL TWO-WAY SWEEPS WITH 4" PVC CLEAN OUTS TO GRADE BETWEEN DWELLING AND PROPOSED SEPTIC TANK AS SHOWN. PROVIDE IRRIGATION CONTROL BOX COVERS OVER CLEAN OUTS - REQUIRED. 5. EXISTING CESSPOOLS ARE TO BE PUMPED & FILLED OR REMOVED ALONG WITH ANY CONTAMINATED SOILS WITHIN 5' OF PROPOSED SAS. VERIFICATION INSPECTIONS ARE REQUIRED. 6. DESIGN COMPANY IS TO VERIFY SOILS OF ALL SAS EXCAVATIONS PRIOR TO SYSTEM INSTALLATION. 7. DESIGN COMPANY IS TO VERIFY SYSTEM INSTALLATION (LOCATIONS AND ELEVATIONS) PRIOR TO BACKFILLING. 8. COMPONENTS ARE TO BE WITHIN 3' OF FINISHED GRADE AND ARE TO HAVE A MINIMUM OF 1' OF SOIL COVER. ACCESS MANHOLES ARE TO BE WITHIN W-6" OF FINISHED GRADE. 9. ALL POST CONSTRUCTION LANDSCAPING DETAILS AR TO BE BETWEEN INSTALLER AND PROPERTY OWNER OR AGENT. 49 North Main Street South Yarmouth, MA David Paradise Assessors• m: 70/2 1 SHEET 2 of 2 4/19/2019 1 19-068 Moran Engineering Associates, LLC PO Box 183 South Harwich, MA 02661 508-432-2878