HomeMy WebLinkAboutReview Checklist 6 -)1-7 TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
- Location: A.M. 7 U Lot Z Zone of Contribution: In Out_ Acreage
rfA/acz , ( Commercial: Re retial:treset: jl --.�
Village: /4i• Flo Plan: • Bedrooms% �?
Owner: ` Installer: l C
Address: Phone: 0� 9- 7d
Phone:
Builder: Engineer: Aree_tcP,Car.iNAddress: Phone:
Phone:
N/A YES NO
1.Required#of copies received
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material, above water table L1
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: �--�
5.Water line 10 ft from septic components Var.: �✓
6.Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: �-'--
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.: �--�
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5'removal �..�
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", ' "preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee L��
20. Sewage is under 10,000 gpd for parcel �-
21.No garbage disposal
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade �..
25.Inspection port on plastic chambers/leach field ,�-
26.Electrical permit for pump chamber/Separate meter for duplexes ✓
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial: --_"
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee, installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: