Loading...
HomeMy WebLinkAboutReview Checklist 6 -)1-7 TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST - Location: A.M. 7 U Lot Z Zone of Contribution: In Out_ Acreage rfA/acz , ( Commercial: Re retial:treset: jl --.� Village: /4i• Flo Plan: • Bedrooms% �? Owner: ` Installer: l C Address: Phone: 0� 9- 7d Phone: Builder: Engineer: Aree_tcP,Car.iNAddress: Phone: Phone: N/A YES NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material, above water table L1 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: �--� 5.Water line 10 ft from septic components Var.: �✓ 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: �-'-- 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: �--� 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5'removal �..� 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", ' "preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee L�� 20. Sewage is under 10,000 gpd for parcel �- 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade �.. 25.Inspection port on plastic chambers/leach field ,�- 26.Electrical permit for pump chamber/Separate meter for duplexes ✓ 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: --_" 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03