Loading...
HomeMy WebLinkAboutEngineered Plans - 201911111:��i1119190 SECOND FLOOR REQUEST RELIEF FROM YARMOUTH B.O.H. 20' SETBACK REGULATION AND 310 CMR 15.405 A) TO INSTALL S.A.S. 14.2' FROM A CELLAR FOUNDATION A 5.8' VARIANCE LOT E1 PUMP AND CESSPOOLS TITLE 535.8x XEMOVE 70, t / 0 35.5 .:: O . LOT E2 �O' 2s�,':::::::: Permit valid for REPAIR OF SEI' IC SYSTEM, ONLY, due to State and Local s ptie variances. S` Board of Health review and appro al is required` for, 35.9 any future additions/renovations/alterations to X sewage facilities anis/or structures/dwelling. 3° Yarmouth Healtli Qepartm.ent APPROVCD/ LOT D2 Name Date GRAPHIC SCALE 20 0 10 20 40 ( IN FEET ) 1 inch = 20 ft. A� 0� tis \ ss°\\ �\ ` ` V LOT D1 SSS\ AREA=10,486± S.F. \ \ c0 FFN F\ 355\\ -77 Ln .7 W .J I _ -77-7— O Gi �0 36 0 = - #161 _ TOF=37.1 = 36.0 x INV.=35.13 a = 35.8 � It C.O. B.M.=' _ 37.50 7; BO O DECK ABANDONc� &004,c - GRAPHIC <F RECEIVE® MAR 15 2019 HEALTH DEPT. SOUTH YARMOUTH MID CAPE HIGHWAY LOCUS MAP LOCUS INFORMATION PLAN REF: 104/107 TITLE REF: 31002/65 PARCEL ID: MAP 79 PAR. 117 ZONING: R FLOOD ZONE: "X" COMMUNITY PANEL: 25001CO587J DATED:07/16/14 SEPTIC SYSTEM REPAIR PLAN LOCATED AT: 161 STATION AVENUE SOUTH YARMOUTH, MA. PREPARED FOR RUTH M. FREDERICKS MARCH 13, 2019 OF MqS t� OF EDWARDq�, �2�P� DD A. / 7/ !p 'R'� :�MM"01i1 I' �IO!�.�'-12 19 I"'4�4-77" AR�aa E.A.S. SURVEY, INC. P.O. BOX 1729 SANDWICH, MA. 02563 BUS: (508)888-3619 CELL: (508)527-3600• SHEET 1 OF 2 J#2075 4" SCHEDULE 40 P.V.C. MIN. PITCH 1/4" PER FOOT TOF=37.10 CLEAN OUT SWEEP TO GRADE W/SCREWCAP RISER RISER LIQUID LEVEL loll 14„ MIN. 48" ADD GAS G BAFFLE PROPOSED 1,500 GALLON TANK GENERAL NOTES 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF YARMOUTH RULES AND REGULATIONS FOR SUBSURFACE DISPOSAL OF SEWERAGE. 2. ALL ACCESS PORTS OVER TANK TEES SHALL BE ACCESSIBLE WITHIN 6" OF FINISH GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10' OF DRIVES OR PARKING AREAS THEN THEY MUST WITHSTAND H-20 LOADING. 4. THE EXCAVATION CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO ANY EXCAVATION. 5. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE OR WITHIN 6" OF GRADE SHALL BE MORTARED IN PLACE. 6. FINISH GRADE SHALL HAVE A MINIMUM OF 2% GRADE OVER THE S.A.S. AND DISTRIBUTION BOX. 7. SEPTIC TANK SANITARY TEES SHALL BE CONSTRUCTED OF SCHEDULE 40 PVC AND SHALL EXTEND A MINIMUM OF 6" ABOVE THE FLOW LINE AND SHALL BE ON THE CENTERLINE AND LOCATED DIRECTLY UNDER THE CLEANOUT MANHOLES. 8. THE INLET PIPE INVERT ELEVATION SHALL BE NO LESS THAN 2 INCHES NOR MORE THAN 3 INCHES ABOVE THE INVERT ELEVATION OF THE OUTLET PIPE. 9. THE SEPTIC TANK SHALL HAVE A MINIMUM COVER OF 9 INCHES. 10. THE OUTLET SANITARY TEE SHALL BE EQUIPPED WITH A GAS BAFFLE, 4 INCHES IN DIAMETER AND CONTRUCTED OF 4" PVC. 11. ALL PIPES SHALL BE SCHEDULE 40 PVC SEWER PIPE AND FIRST TWO FEET OUT OF THE DISTRIBUTION BOX SHALL BE LEVEL. 12. CHANGES OR REVISIONS TO SEPTIC DESIGN REQUIRE NOTIFICATION TO EAS SURVEY INC. FOR B.O.H. AND DESIGN ENGINEERS REVIEW AND APPROVAL. 12. NOT IN ZONE II CONSTRUCTION NOTES: 1. CONTRACTORS / INSTALLERS SHALL VERIFY GRADES AND ELEVATIONS AND SITE CONDITIONS PRIOR TO COMMENCING WORK ON THE SITE. 2. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 3. ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS. 29.65 35.9 MIN. SCHED 1/84 PERV OOT RISER ....... ........ .......... ....... ...... LE PITCH 9.5' 0 S=.13 LEVELI ^T^ FOR 2' 10' 0 S=.01 6.8 SUMP 32.72 6 BASE OF 32.55 32.45 MECHANICALLY COMPACTED STONE PROP. (H-10)DB3 DISTRIBUTION BOX W/"T" PROFILE OF SEWAGE DISPOSAL SYSTEM (NOT TO SCALE) SEPTIC SYSTEM DETAIL PAGE #161 STATION AVE. SOUTH YARMOUTH, MA. MARCH 14, 2019 TEST PIT RESULTS: SOIL TEST DATE: FEBRUARY 21, 2019 B.O.H. AGENT: PHIL RENAULD SOIL EVALUATOR: DAVID FLAHERTY, R.S. BACKHOE: ELLIS BROS. DTH#1 EL.= 35.4 (BOTTOM PERC @ 46" <2 MPI) ELEV. DEPTH (IN.) HORIZON TEXTURE COLOR IMOTTLING OTHER 34.4 0"-12" A LOAMY SAND 10YR3/2 N/A 33.2 12"-28" B LOAMY SAND 10YR5/6 N/A 24.4 28"-132" C MEDIUM SAND 2.5Y6/6 N/A NO MOTTLES, NO GROUNDWATER 2" LAYER OF 1/8" - 1/2" DOUBLE WASHED STONE CLEAN SAND FILL PER 310 CMR 15.255 OR FILTER FABRIC 35.7 35.7 RISER lop RISER ISI 1�1 ISI O 1�1 ISI ISI ISI ISI ISI ISI I=1 ISI I-1 I�1 ISI ISI ISI ISI ISI I�1 \ 3/4" TO 1&1/2" notIRI F WASHED STONE ISI ISI ISI O ISI ISI ISI '�� ISI ISI ISI ISI ISI ISI ISI I 1�1 ISI ISI ISI 1�1 1�1 ISI ISI ISI 1�1 ISI I�1 I�1 ISI 25' 2-500 GAL. CHAMBERS (H-20) r, (5'W X 8'-6"L X 3'-0"H) SOIL ABSORBTION (TRENCH FORMATION) o SYSTEM (S.A.S.) 13' X 25' 'co BOTTOM OF TESTPIT ELEV.= 24.4 DESIGN DATA: NUMBER OF BEDROOMS ......... __ 3 GARBAGE DISPOSAL ................. NO TOTAL ESTIMATED FLOW (110 GAL./BR./DAY X 3 BR.) --330 330GPD X 200% = 660 GAL USE EXIST. 1000 GAL. TANK INSTALL: 2(H-20) 500GAL CHAMBERS (W/4' CRUSHED STONE ON THE SIDES AND ENDS) AND BACKFILL WITH CLEAN SAND FILL PER 310 CMR 15.255 SOIL CLASSIFICATION ................ __ 1 ---- DESIGN PERCOLATION RATE..... <2 MIN. -/IN. EFFLUENT LOADING RATE ......... __74___ REQUIRED LEACHING CAP ACI AY LEACHING CAPACITY PROVIDED ..... 352_ GAL/DAY SIDEWALL: (13' + 25')x2x(2 SIDES)(.74)= 112 GAL/DAY BOTTOM: (13' x 25')(.74)= 240 GAL/DAY TOTAL= 352 GAL/DAY 352 GPD PROVIDED - 330 GPD REQUIRED = 22 GPD RESERVE E. A. S. SURVEY, INC. P.O. BOX 1729 SANDWICH, MA. 02563 0 BUS: (508)888-3619 CELL: (508)527-3600 SHEET 2 OF 2 J#2075