HomeMy WebLinkAboutReview Checklist 6.- -t-(1 TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
• Location: A.M. Lot Zone of Contribution: In Out age
Commercial: Residential:
Street: % �." AA / ' if /
Village: / Floor Plan: #Bedrooms:7��
Owner: C r.,< Installer: Z"`'-7% c r
Address: Phone: �'-- '' _ - 6. 4 7
Phone:
Builder: Engineer: .„
Address: Phone: _.4 P `j`Z27 tore,
Phone:
N/A YES NO
1.Required#of copies received LO
2.Date of soils exam and percolation test not older than 2 years ('
3.4-5 ft of naturally occurring pervious material, above water table C-----
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: c.....---
5.Water line 10 ft from septic components Var.: ----*'
6.Benchmark indicated and shown-NGVD if near wetlands 1-----
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
L------
9.
/.9.Leaching minimum 100 ft from wetlands Var.: • -
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ...-----
11.Tank/leaching minimum 10 ft from property line Var.: k-_-,
12. System meets all other setback requirements Var.: (----- _
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: (----•
15. System not in top or subsoil(A,B horizons)or 5'removal V®
16.Proposed contours are suitable
C----,
17. System meets slope requirements-min. 1/8", 1/4"preferred (..._---
1
18. System meets breakout requirements PVC liner: Wall: L----
49.
e49. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel (-----
21.No garbage disposal L.....--
'22. System adequately sized for its intended use (....-----
23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade L_--.-.
25.Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ___.---
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking -..-----
30.Buoyancy calculations for tank/pump chamber ..-'
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.11-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee, installer signature - _
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd ,-
37.Check area lots for groundwater/Label groundwater in Assessor's Map /---
Plan reviewed by: �j 6/03/03