HomeMy WebLinkAboutBuilding Permit for Shed df• A TOWN OF YARMOUTH Building Department
(508)398-2231 ext.1261 BUILDING
re.._, ... y PERMIT NO BLD-19-005003 PERMIT
v 0 ISSUE DATE 03/05/2019 JOB WEATHER CARD
APPLICANT Daniel&Sally Heiman PERMIT TO
I AT(LOCATION) 20 NICK-EM WY,YARMOUTH MA 02675
ZONING DISTRICT _
! Bldg.Type Residential
SUBDIVISION MAP BLOCK LOT 109.223 BUILDING IS TO BE: CONST TYPE
_.__ __. USE GROUP
REMARKS Shed: Not-A-Comer-Lot-Construct 16 x 12 x 13 Shed-Subject to zoning bylaw CONTRACTOR
setbacks(413-627-4515)
LICENSE
AREA(SQ FT) 2,011,339,44 EST COST($) PERMIT FEE($) 67.00
OWNER MILBERG SIMON TR
BUILDING DEPT BY
ADDRESS GREAT WESTERN FARM NOMINEE TR, 77 N
SOUTH YARMOUTH MA 02664
!!�t S►PAY'S
_-.. _.e.__ _.. _..__
6 PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT9OES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS
MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL
3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
,4'l •SeG
&4 ink
•
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF
UNTIL THE INSPECTOR HAS INPSECTIONS INDICATED ON THIS CARD
CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION ARr1VF