HomeMy WebLinkAboutReview Checklist 7 l/ TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M.9/ Lot Pc
Zone of Contribution: In • •
ff Commercial: Resi 4
6øy .i - al.
Street: (� c ��
Village: 'e Floor Plan: #
Owner: 9Gi‘G,-1 r Installer: AgCQG,
Address: Phone: Q---¢7 7- d,(c-3
Phone:
Builder: Engineer: t i j/ Iii
Address: Phone: -• 7 71--p �'
Phone:
N/A YES NO
1.Required#of copies received
2.Date of soils exam and percolation test not older than 2 years t---
3.4-5 ft of naturally occurring pervious material,above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: c�
5.Water line 10 ft from septic components Var.: �..
6.Benchmark indicated and shown-NGVD if near wetlands �--
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: �r
9.Leaching minimum 100 ft from wetlands Var.: �✓
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: �-
15. System not in top or subsoil(A,B horizons)or 5'removal
16.Proposed contours are suitable •
17. System meets slope requirements-min. 1/8", I/4"preferred [
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel �.
` 21.No garbage disposal
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox
- 24.Manhole covers within 6"of grade,pump chamber cover to grade
25.Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking �'-
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee, installer signature
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max.flow: gpd
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6/03/03