Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2018C z m O z LOT 33 BRADDOCK ST. F'0�, I BREEZY POINT L OCUS M Sca e: TS F FQ OAF 9 � CZ 0 a� LOT 34 LOT 35 N/F WOODBURY Book, Page: 13734, 299 Property ID: 34/ 223/ 1 I I REQUESTED VARIANCES: REQUESTING A VARIANCE TO HAVE A 4' SEPARATION TO GROUNDWATER _ .INSTEAD OF THE REQUIRED 5' SEPARATION. THE GROUNDWATER ADJUSTMENT HAS BEEN APPLIED. Lu U) w z_ p ro . 0 00 O O p U < to z / F - w U) 2 p � _ Of O < z 0 p (/) < :2 (7 I NOTE: \SAS I S GREATER THAN 70' FROM THE SAS. 70 (P N N' O N. WF -1 o rp 190'± /rr valrj_ for REPAIRSF:1'"I IC SVS*UF.M dueStateand Vocal septic variances. of Iltea143e review and approval is required for any future additions/ren;,aalions/alterations to sewage f .i ilohes and/or structm-es/dscelling, V.aro:o�th Ciealt1t. Ucpattntcn����`��� date � WF -2 \ �ESSP OL LI T 36 \0 STAKED SILT FENCE 3 AND SILLT SOCK TO BE \ INSTALLED PRIOR TO ANY EXCAVATION FIELD WORK ,K x3.7 \� (SEE DETAIL) �- r\ WF -3 . \ WF -4 It LOT 37 \ x3.7 N/F `ly�%OODBURY WF -5 Book, Page: 34/ \5/ge: 1266 285 w �\ . 0.9Pro7er/ / I x PLAN $K. 72 PG. 51 � a CWF -6 ' 0 13,256 S.F. 4.5x 0. LOT 38 x4.8 N -A 9,480 S.F. 4 LOT 39 "F-7 ii 196,± N/F LUCIANO LOT 40 Book, Page: 2955 286 D nv mD v SPINK m XZ m FILL TITLE 5 STANDARDS. TYPE OF BUILDING: SINGLE FAMILY DWELLING J; DESIGN 6" - 13" 0/E SANDY LOAM 59 CLAY STREET 3.7 13"-33" MIDDLEBORO, MASSACHUSETTS SANDY LOAM 10YR5/8 IQ 02346-1052 II C N 10YR6/6 o N 00 774-766-0544 OR 774-678-9066 jspinkl®gmail.com SEPTIC SYSTEM DESIGN PLAN SEPTIC TANK CAPACITY: REQUIRED: 440 GPD X 200% =880 GPD • �p1A.�Qe LOCATION: SEPTIC TANK PROVIDED = 1500 GAL. (NEW SEPTIC TANK) � • DALE NUSSBICKEL 92 BREEZY POINT RD. NO GARBAGE GRINDER ALLOWED. YARMOUTH, MA. SEPTIC TANK VOLUME: 1500 GAL 02035 LTAR=.74 gpd/sf M� DATE: SEPT. 23, 2018 SCALE: 1" = 20' DESIGNED BY: TCR LEACHING CAPACITY PROVIDED: , � DRAWING NO.: 1 OF 2 .; _ ,.,_ter.;-• CHECKED BY: JCS H-20 CAPACITY LEACHING CHAMBER BED 12 LEACHING CHAMBER UNITS WITH A .5' GAP BETWEEN THE CHAMBERS AND 2' OF STONE ALL AROUND # DATE REVISION DESCRIPTION ' TCR JCS •. u B.M. NAIL IN 101/15/18 TREE EL.=6.53 ADD I A SYSTEM TCR JCS :: 2 12/9/18 REMOVE I/A SYSTEM TCR JCS i I /rr valrj_ for REPAIRSF:1'"I IC SVS*UF.M dueStateand Vocal septic variances. of Iltea143e review and approval is required for any future additions/ren;,aalions/alterations to sewage f .i ilohes and/or structm-es/dscelling, V.aro:o�th Ciealt1t. Ucpattntcn����`��� date � WF -2 \ �ESSP OL LI T 36 \0 STAKED SILT FENCE 3 AND SILLT SOCK TO BE \ INSTALLED PRIOR TO ANY EXCAVATION FIELD WORK ,K x3.7 \� (SEE DETAIL) �- r\ WF -3 . \ WF -4 It LOT 37 \ x3.7 N/F `ly�%OODBURY WF -5 Book, Page: 34/ \5/ge: 1266 285 w �\ . 0.9Pro7er/ / I x PLAN $K. 72 PG. 51 � a CWF -6 ' 0 13,256 S.F. 4.5x 0. LOT 38 x4.8 N -A 9,480 S.F. 4 LOT 39 "F-7 ii 196,± N/F LUCIANO LOT 40 Book, Page: 2955 286 D nv mD v SPINK m XZ m FILL TITLE 5 STANDARDS. TYPE OF BUILDING: SINGLE FAMILY DWELLING J; DESIGN 6" - 13" 0/E SANDY LOAM 59 CLAY STREET 3.7 13"-33" MIDDLEBORO, MASSACHUSETTS SANDY LOAM 10YR5/8 IQ 02346-1052 II C N 10YR6/6 o N 00 774-766-0544 OR 774-678-9066 jspinkl®gmail.com PREPARED FOR: Property ID: 34/ 226/ GREGORY "-. - BUINAVICZ NO. 50300 j2-ct-/g DALE NUSSBICKEL��'' 92 BREEZY POINT RD. 100 MASSACHUSETTS cvtvfiR YARMOUTH, 90. -IST�� IONA�� 0 m LA I' O I O.F. = 106.0± BRING ALL THREE COVERS TO FINISHED GRADE WITH METAL MANHOLE COVERS H-20 LOADING MANHOLE COVER 24" DIAMETER MIN. (TYP.) 10.5' 1500 GAL. SEPTIC TANK USE WIGGIN PRECAST TANK OR SIMILAR DRAWING IS NTS FINISHED GRADE -0 1.75 4" PVC PIPE 3" MIN (SCH. 40) SLOPE OF .03 y, I BRING BOTH COVERS ! P T n & P R 0 F IOLE TO FINISHED GRADE ..ur11 W WITH METAL MANHOLES COVERS BRING D -BOX COVER TO HIN 6" OF GRADE WITH ITA CONCRETE COVER MIN 2.3± FORCE MAIN EXTEND UNDI RETAINING W. (SEE DETAIL) t UT I ; 1.33 � +. ,• OUTLETS -3 PLUGGED 0 Id. I SANITARY TEE it DB3 D- BOX s . ��-. . �.. •�-.� . BAFFLE BOX °$poe°yQo oa�000�ooQ°gC�e;q� oe°0 6" CRUSHED STONE 310 CMR 15.232 o Ao0 00 00 00 00 00 00 0 00� 00 H-20 LOADING TE 6,� CRUSHED STONE PROPOSED 1,000 GALLON TANK ON A COMPACTED STONE BASTV WARPROOFED SEE DETAILS H-20 LOADING I, USE SHEA PRODUCTS OR SIMILAR DRAW G IS NTS ALL TANKS ARE TO BE WATERPROOF 00 5.89 FINISHED GRADE 27. MIN. SLOPE 7,3 MIN. FINISHED GRADE o FILTER FABRIC TO BE WINSTALLED OVER THE CHAMBER AND THE 2' OF STONE 6.35 5.64 H-20 LOADING 12 - CULTEC C-4 PANEL SEE PLAN FOR CHAMBER CONFIGURATION THERE WILL BE A 5' SAND OVERDIG THERE IS 2' OF STONE AROUND THE ENTIRE PERIMETER OF THE CHAMBERS THE STONE EXTENDS THE ENTIRE DEPTH OF THE CHAMBERS 8.5". 4" T O v m v GROUNDWATER ® 1.64'± i SEE WALL DETAIL AROUND THE SAS GRD.TP N EL. 4.8f S O I L TEST DAEA GW. EL, •1 + 1.54' = 1.64' DEEP HOLE SURFACE DEPTH SOIL HORIZON SOIL TEXTURE SOIL COLOR SOIL MOTTLING EL. 0" - 6" FILL TITLE 5 STANDARDS. TYPE OF BUILDING: SINGLE FAMILY DWELLING J; 4.3 6" - 13" 0/E SANDY LOAM 10YR2/2 3.7 13"-33" B SANDY LOAM 10YR5/8 2,1 33"-96" C MED. SAND 10YR6/6 -5,2 SOIL EVALUATOR: THOMAS ROUX APPROVING AUTHORITY: AMY VON HONE i DATE PERFORMED: JULY 19,_2018 , i ADJUSTED G.W. AT 1.64 i III ESTIMATED SEASONAL GROUND WATER ELEV. EL: .1' + 1.54' (1.64') ADJUSTED SOIL EVALUATION PERFORMED BY: THOMAS ROUX SOIL EVALUATOR LICENSE NUMBER: SE2703 I CERTIFY THAT I HAVE TAKEN AND PASSED THE SOIL EVALUATOR CLASS ON OCTOBER OF 2000 PT NO. A GRD. EL. 4.8f PERC DEPTH 25" 1 START 15 MIN. PRESOAK: 2:26 A.M. j END 15 MIN. PRESOAK: 2:35 A.M. TIME AT 12": TIME AT 9": TIME AT 6": WOULD NOT HOLD THE PRESOAK PERC RATE: <2 M.P.I. 1 THE FILL, A AND B LAYERS ARE TO BE STRIPPED OUT DOWN TO THE ELEVATION WHER THE C -LAYER BEGINS. TITLE 5 SAND WILL BE USED TO BUILD UP TO EL. 5.64. THE STRIP OUT WILL OCCUR FROM THE SURFACE DOWN TO EL. 2.1 (BEGINNING OF THE C -LAYER). BUILD UP FROM EL. 2.1 UP TO EL. 5.64 (3.54' OF SAND±). SW STONE WALL 99 CB CATCH BASIN TL TREE LINE 1 BM BENCHMARK OS SMH SEWER MANHOLE $" UP UTILITY POLE DO DMH DRAIN MANHOLE HYD FIRE HYDRANT ® W WELL 0 PRC PERC TEST EC EROSION CONTROL DH DEEP HOLE PROPOSED CONTOUR PROPOSED SPOT ELEV. ----90--- EXISTING CONTOUR "99.9 EXISTING SPOT ELEV. NOTES 1. ALL ELEVATIONS REFER TO NAIL SET IN TREE, SEE PLAN FOR BENCHMARK LOCATION 2. ALL CONSTRUCTION SHALL CONFORM TO 310 CMR 15.00, TITLE V AND THE REGULATION OF THE TOWN'S BOARD OF HEALTH. 3. THIS PLAN DOES NOT WARRANT OR IMPLY ANY SUBSURFACE SOIL CONDITIONS OTHER THAN THOSE OBSERVED AT THE IMMEDIATE TEST PIT LOCATIONS. IF UNSUITABLE MATERIAL IS ENCOUNTERED. ALL CONSTRUCTION SHALL CEASE, AND THE DESIGN ENGINEER SHALL BE CONTACTED IMMEDIATELY. 4. ALL TANKS, D -BOXES, AND CHAMBERS SHALL BE SET LEVEL AND TRUE TO GRADED -ON A MECHANICALLY COMPACTED STABLE BASE. 5. AREAS DISTURBED DURING CONSTRUCTION SHALL BE STABILIZED TO MINIMIZE EROSION. THE AREA OVER THE SYSTEM SHALL BE GRADED TO A MINIMUM OF 2% SLOPE TO PROVIDE POSITION SURFACE DRAINAGE. 6. THE ORIGINAL TOPOGRAPHIC SURVEY AND PLAN WERE DONE BY BORDERLAND ENGINEERING. 7. THIS PLAN SHALL NOT BE USED FOR THE REPRODUCTION OF PROPERTY LINES, NOR SHALL IT BE USED AS A MORTGAGE PLOT PLAN OR TITLE SURVEY. CONFORMANCE TO LOCAL BYLAWS SHALL BE DETERMINED BY THE OWNER PRIOR TO CONSTRUCTION. 8. THE OWNER IS RESPONSIBLE FOR THE DETERMINATION OF THE LOCATIONS OF ALL BURIED UTILITIES. 9. FOR PROPER PERFORMANCE, THE SEPTIC TANK SHOULD BE INSPECTED AT LEAST ONCE A YEAR AND PUMPED WHEN THE TOTAL DEPTH OF SOLIDS EXCEEDS 1/4 THE LIQUID DEPTH OF THE TANK. 10. ANY ALTERATIONS MUST BE REPORTED TO THE DESIGN ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION. 11. THE SYSTEM MUST BE INSPECTED DURING CONSTRUCTION BY THE BOARD OF HEALTH OR ITS AGENT AND THE DESIGN ENGINEER AND BE CERTIFIED BY THE DESIGN ENGINEER. 12. THERE IS NO RESERVE AREA. 13. ALL STONE USED IS TO BE DOUBLE WASHED STONE. 14. SEE 310 CMR 15.255 FOR FILL SPECIFICATIONS. SEE 310 CMR 15.247 FOR AGGREGATE SPECIFICATION. 16. ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED. 17. THERE ARE NO WELLS WITHIN 100' OF THE SYSTEM. 18. AN EFFLUENT FILTER IS TO USED AT THE OUTLET END OF THE TANK. 19. THE EXISTING CESSPOOL SHALL BE PUMPED OUT JUST PRIOR TO CONSTRUCTION. THE NEW SEPTIC TANK WILL BE PLACED WHERE INDICATED ON THE PLAN. 20 SLOPES MUST BE STABALIZED POST CONSTRUCTION DESIGNDATA ! " 21. EXISTING 4 BEDROOM COTTAGES WERE DESIGNED FOR 4 BEDROOMS. (2 BEDROOMS/COTTAGE) 22. THE EXISTING SEPTIC SYSTEM IS TO BE ABANDONED ACCORDING TO TITLE 5 STANDARDS. TYPE OF BUILDING: SINGLE FAMILY DWELLING J; 23. THERE WILL BE A POLY BARRIER AROUND THE ENTIRE SAS. SEE PLAN FOR LOCATION. SEE DETAIL TOTAL NUMBER OF EXISTING BEDROOMS: 4 ALSO. DESIGN FLOW: 110 GAL./BEDROOM/DAY DESIGN FLOW: 4 BEDROOMS X 110 GAL./BEDROOM = 440 GAL./DAY SEPTIC SYSTEM DESIGN PLAN SEPTIC TANK CAPACITY: REQUIRED: 440 GPD X 200% =880 GPD CLIENT: LOCATION: SEPTIC TANK PROVIDED = 1500 GAL. (NEW SEPTIC TANK) DALE NUSSBICKEL 92 BREEZY POINT RD. NO GARBAGE GRINDER ALLOWED. YARMOUTH, MA. SEPTIC TANK VOLUME: 1500 GAL 02035 LTAR=.74 gpd/sf DATE: SEPT. 23, 2018 SCALE: 1" = 20' DESIGNED BY: TCR LEACHING CAPACITY PROVIDED: , DRAWING NO.: 1 OF 2 JOB NO: CHECKED BY: JCS H-20 CAPACITY LEACHING CHAMBER BED 12 LEACHING CHAMBER UNITS WITH A .5' GAP BETWEEN THE CHAMBERS AND 2' OF STONE ALL AROUND # DATE REVISION DESCRIPTION TCR JCS 12 UNITS AREA OF 36' X 17' = 612.0 S.F. 612 SQ. FT. x .74 GPD/ SQ. FT. = 452.9 GPD 101/15/18 ADD I A SYSTEM TCR JCS SINCE 452.9.4 GPD > 440 GPD O.K. 2 12/9/18 REMOVE I/A SYSTEM TCR JCS i I Z 0 Z D BRADDOCK ST. LOCU BREEZY POINT RD. LOCUS MAP Scale: NTS HEAD FEET LOWEST GRADE EL AROUND THE WALL IS 4.5f U.S. GAL. 25 50 75 100 125 150 PER MIN. NOTE THAT THE FORCE MAIN WILL --j GO UNDER THE RETAINING WALL. AT INVERT EL. = 1.08 2"x 2"x 4' WOOD STAKE OR APPROVED EQUAL SILT FENCE 140N OR AP ROVED EQUAL APR WORK AREA SILT SOCK j lu AL PROTECTED i G TOP OF AREA FLOW GROUND I III A` .k. II PLACE 4" OF FABRIC III 1' (MIN.) ALONG TRENCH AWAY III FROM PROTECTED AREA, BACKFILL AND TAMP (f� V 1. FILTER CLOTH SHALL BE FASTENED SECURELY TO POSTS WITH WIRE TIES OR STAPLES AND POST& SHALL BE PLACED EVERY 10 FEET. 2. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVERLAPPED BY 6 INCHES AND FOLDED. 3. ENTRENCH SILT FENCE AT LEAST 6 INCHES. 4. INSPECTIONS SHALL BE FREQUENT AND REPAIR OR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED, OR WHEN SEDIMENT ACCUMULATES TO HALF THE HEIGHT OF FENCING. r EROSION CONTROL SILT FENCE DETAIL N.T.S. +5 1 PUMP DETAIL I 3 -GATE PUMP SYSTEM NOTES AND SPECIFICATIONS 1. PUMP DESIGN INFORMATION PUMP: BARNES SE 411 OR SIMILAR, SINGLE PHASE, 0.4 HP 4.12" IMPELLER, 2 INCH DISCHARGER. STATIC HEAD: 2.8' DYNAMIC HEAD:11.0' TOTAL DYNAMIC HEAD:13.8' PROPOSED DISCHARGE RATE:85 GPM± T.D.H. :14.8' PUMP WILL HANDLE 1 1" SOLIDS FLOW VELOCITY: 6 F.P.S. ± FLOAT CONTROL ELEVATIONS OVERRIDE SWITCH: BOTH PUMPS ON: .35 ALARM ON:.50 LEAD PUMP ON: -.65 BOTH PUMPS OFF: -2.41 1. PUMP SHALL DELIVER MINIMUM OF 75 GPM AT 13.8 FEET T.D.H. 2. PUMPS SHALL BE INSTALLED ON STAINLESS STEEL SLIDE RAIL SYSTEM WITH QUICK DISCONNECT FEATURE. 3. PUMP CONTROL SHALL BE PRESSURE ACTIVATED LINEAR CONTROL SWITCH ATTACHED DIRECTLY UNDER ACCESS HATCH. 4. PUMP SYSTEM SHALL BE INSTALLED AND TESTED WITH WATER PRIOR TO FINAL APPROVAL OR DISCHARGE OF SANITARY WASTE. 5. PUMP ALARM SYSTEM SHALL BE ON A SEPARATE CIRCUIT, ISOLATED FROM PUMP ELECTRICAL SYSTEM. 6. EACH CYCLE PUMPS ± 440 GALLONS WASTE WATER TOTAL RUN PER CYCLE = ± 6.0 MINUTES CYCLES PER DAY = 1.5± 7. ALL ELECTRICAL COMPONENTS SHALL BE HARD -WIRED TO PANELS. NO JUNCTION BOXES SHALL BE USED. 8. NUMBER OF DOSING CYCLES PER DAY = 1.0± 9. THE ALARM PANEL SHALL BE INSTALLED IN THE CLOSET. 10. THE DESIGN POINT IS 70 GPM± FOR A TOTAL DYNAMIC HEAD OF 13.8'. SPINK 00 D mD D tr, t x Z m DESIGN 59 CLAY STREET MIDDLEBORO, MASSACHUSETTS Z 02346-1052 c(n c- o N 774-766-0544 jspinkl®gmail.com EXISTING FtNISNEO GRADE OF CQO BLQCK BE BELOW GRADE LOWEST GRADE EL. AROUND THE WALL IS 4.5f nbs" END VIEW OF A C-4 CULTEC PANEL i I l tOJECTS, f i SEPTIC SYSTEM DESIGN PLAN i i PREPARED FOR: /- -1 /2" HANDLE 18" FILTER / CARTRIDGE FILTER i GASKET 6.50 I 5' OF SAND OVERDIG 12" PILE CAP THE POLY BARRIER WILL BE WRAPPED AROUND THE ENTIRE PERIMETER OF THE SAS WHERE THE 5' SAND OVERDIG MEETS THE WALL I I i 9'-0" I SEE PLAN VIEW) 24" DIA ACCESS COVERS._ - WITHIN 6" OF a 6.35 FINISHED GRADE a 0 O 0 5,_4" 0 0 0 0 I I TOE 5.6 4 ° f i I i 146' LONG 40 MIL. "RUFCO 40008" LINEAR LOW DENSITY POLYETHYLENE BARRIER FIRST COURSE OF BLOCK IS TO BE SET BELOW GRADE POLY BARRIER AND BLOCK DETAIL N.T.S. 4" SANITARY TEE 4" SEWER -PIPE -GAS BAFFLE ZABEL A1800 RESIDENTIAL SEPTIC TANK EFFLUENT FILTER FOR SINGLE FAMILY HOMES. (800) 221-5742 INSTALLATION: FITS ANY 4" SANITARY TEE AND SEWAGE PIPE USED AS A SEPTIC TANK OUTLET BAFFLE. EXTEND SEWAGE PIPE AT LEAST ONE INCH BELOW BOTTOM OF FILTER CARTRIDGE GASKET. (1 i 8' LONG PLAN VIEW OF A C-4 CULTEC PANEL v�01 v m0 11 G DALE NUSSBICKEL 92 BREEZY POINT RD. YARMOUTH, MASSACHUSETTS 02035 SIDE VIEW OF A C-4 CULTEC PANEL JOHN G��a CULLER° N N SPINK � - o0000000000�000000000000 2" UNI❑N A ' � BALL VALVE . � A. d ��.11811811811811811111811 J ■■■■■■■■■■■■■■■■■■■■■■\ 2" CLEAN-OUT 5'-7" EL.= .50 (6") I . °, ° EL.= .35 4.2" oil � (❑PTIONALEL.= -.65___(- .8" ALARM LAG PUMP NINNINNIN1111 A.Q. PUMP PUMP OFF 1/4" DIAMETER WEEP HOLE a:. .........■ EL.= -2.91 a• ° I .......■11,11,11IL11 I I I I I I I TAPER BARNES SE411 OR EQUAL 1000 GALLON WATERPR ,OF PUMP CHAMBER DUPLEX PUMP' PACKAGE NOTES: f 1. CONCRETE: 5,000 PSI MINIMUM AFTER 28 DAYS. 2. CONSTRUCTION OF PUMP CHAMBER CONFORMS WITH DEP TITLE 5 REGS, 310 CMR, SECTION 5.226. PLAN VIEW OF A C-4 CULTEC PANEL v�01 v m0 11 G DALE NUSSBICKEL 92 BREEZY POINT RD. YARMOUTH, MASSACHUSETTS 02035 SIDE VIEW OF A C-4 CULTEC PANEL JOHN G��a CULLER° N N SPINK N0.30091.0 tQ �� 4' WIDE 6/- /__ '- - RISER TO GRADE WITH METAL MANHOLE COVER SUPPLIED WITH TOP VIEW NEMA4X JUNCTION BOX JUNCTION BOX WILL BE OUTSIDE OF THE PUMP CHAMBER. THE JUNCTION BOX WILL BE IN A SEPARATE IRRIGATION BOX. • ' e. •' ' e ' • d, 4 ° i • • •a a •.d A PRESSURE TRANSDUCER IS NEEDED FOR DUPLEX PUMPS AS WELL AS A DUPLEX PANEL. a a' 4 J WIGG111w� 4d 2" PVC STUB 7. SUPPLIED WITH PUMP CONTROL PANEL W/ALARM. 1 8. LAG & ALARM FLOATS CAN BE SWAPPED' OR COMBINED INTO ONE FLOAT. I i BUOYANCY CALCULATIONS: WEIGHT OF PUMP CHAMBER AND SOIL ABOVE IT: 38,287 Ib± WEIGHT OF WATER DISPLACED BY THE PUMP CHAMBER: 18,7201b.± SINCE 38,2871b. > 18,7201b. IT IS O.K. WEIGHT OF THE SEPTIC TANK NEGLECTING THE SOIL ABOVE IT: 20,1001b.± WEIGHT OF WATER DISPLACED BY THE SEPTIC TANK: 18,6701b.± SINCE 20,1001b. . 18,6701b. IT IS O.K. SEPTIC SYSTEM DESIGN PLAN CLIENT: LOCATION: 92 BREEZY POINT RD. DALE NUSSBICKEL YARMOUTH, MA. 02035 DATE: SEPT. 23, 2018 SCALE: 1" = 20' DESIGNED BY: TCR DRAWING NO.: 2 OF 2 JOB NO: CHECKED BY: JCS # DATE REVISION DESCRIPTION TCR JCS 1 10/15/18 ADD I/A SYSTEM TCR JCS 2 12/9/18 REMOVE I/A SYSTEM TCR JCS PRECAST 2" UNI❑N A ' � BALL VALVE . A. d 2" CLEAN-OUT 5'-7" EL.= .50 (6") I . °, ° EL.= .35 4.2" e (❑PTIONALEL.= -.65___(- .8" ALARM LAG PUMP A.Q. PUMP PUMP OFF 1/4" DIAMETER WEEP HOLE a:. EL.= -2.91 a• ° d A 'a F '°• Q V 2" SECTION �IEW 2" BALL CHECK VALVE TAPER BARNES SE411 OR EQUAL 1000 GALLON WATERPR ,OF PUMP CHAMBER DUPLEX PUMP' PACKAGE NOTES: f 1. CONCRETE: 5,000 PSI MINIMUM AFTER 28 DAYS. 2. CONSTRUCTION OF PUMP CHAMBER CONFORMS WITH DEP TITLE 5 REGS, 310 CMR, SECTION 5.226. TOWN OF YARMOUTH REQUIREMENTS: 3. ALL REINFORCEMENT PER ASTM C1227. I 4. JOINT SEALED WITH BUTYL RESIN. 1.) SURVEYOR TO STAKEOUT LOCATION OF WALL. 5. DESIGNED FOR H-20 LOADING. 2.) ENGINEER TO INSPECT OVERDIG. 6. PUMPS, FLOATS AND PIPE INSTALLED SIN CHAMBER. 3.) ENGINEER TO INSPECT WALL FOOTING. FLOAT ELEVATIONS SET UPON REQUEST 4.) ENGINEER TO INSPECT S.A.S. & PUMPS. 7. SUPPLIED WITH PUMP CONTROL PANEL W/ALARM. 1 8. LAG & ALARM FLOATS CAN BE SWAPPED' OR COMBINED INTO ONE FLOAT. I i BUOYANCY CALCULATIONS: WEIGHT OF PUMP CHAMBER AND SOIL ABOVE IT: 38,287 Ib± WEIGHT OF WATER DISPLACED BY THE PUMP CHAMBER: 18,7201b.± SINCE 38,2871b. > 18,7201b. IT IS O.K. WEIGHT OF THE SEPTIC TANK NEGLECTING THE SOIL ABOVE IT: 20,1001b.± WEIGHT OF WATER DISPLACED BY THE SEPTIC TANK: 18,6701b.± SINCE 20,1001b. . 18,6701b. IT IS O.K. SEPTIC SYSTEM DESIGN PLAN CLIENT: LOCATION: 92 BREEZY POINT RD. DALE NUSSBICKEL YARMOUTH, MA. 02035 DATE: SEPT. 23, 2018 SCALE: 1" = 20' DESIGNED BY: TCR DRAWING NO.: 2 OF 2 JOB NO: CHECKED BY: JCS # DATE REVISION DESCRIPTION TCR JCS 1 10/15/18 ADD I/A SYSTEM TCR JCS 2 12/9/18 REMOVE I/A SYSTEM TCR JCS