Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 3 Lot -2 c 3 Zone of Contribution: In Out Acreage Commercial: Residential: Street: aj t-E •Village: 0��w/ Floor Plan: C.' #Bedrooms: 7 2 . Owner: �irl Installer: L Address: G�-ePhone: Phone: i Builder: Engineer: ( ( 4_40,215. Address: Phone:;- Phone: / , I / geb ) WA/iC Y N r ,r - l61'hit !//�y� N/A YES O ,% 1.Required#of copies received i/ �32.Date of soils exam and percolation test not older than 2 years L.--------- 3.4-5 .4-5 ft of naturally occurring pervious material,above water table ✓/ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: V 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands L/ 7. Septic tank minimum 10 ft from foundation, deck Var.: -�/' 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t/ 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: t.-7/ 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: I 14. Leaching set 4-5 ft above adj.water or botto est holVar.: 1. 15. System not in top or subsoil(A,B horizons)o 5'removal ' (_.----- 16.Proposed contours are suitable t/ 17. System meets slope requirements-min. 1/8", ' "preferred (��, L , 18. System meets breakout requirements PVC liner: G,ap^f".all: 19. Specified tee sizes are proper,gas baffle on outlet tee �/ 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal t.------- 22. 22.System adequately sized for its intended use k__/' 23.Minimum 6"stone or compacted below tank and dbox ✓� 24.Manhole covers within 6"of grade,pump chamber cover to grade , " 25.Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes ✓,. 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size L� 28. Septic tank/pump chamber to be factory waterproofed t 29.Vent provided if leaching below 3 feet,under driveway/parking u' 30. Buoyancy calculations for tank/pump chamber L.-/-"-- ..- 31. ./-31.Engineer to inspect and certify soils: wall: commercial: ti/ 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater ✓� 34.Title V Application and permit fee, installer signature L--/ 35.Foundation footing min.2 feet above adjusted ground water for new house �1 36. Deed Restriction required max. #bedrooms: max. flow: gpd ` - ✓ 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: ` 6/03/03