Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST / Location: A.M. 17 Lot 7j Zone of Contribution: In ✓Out_ Acreage 4W- Commercial: Residential: Street:2 ‘ / _ Village: , IGZv�' L / Floor Plan: ✓ #Bedrooms: . Owner: / , ! Installer:-----1� S r Address: Phone: 2.-- Phone: Builder: Engineer: Address: Phone: Q -7 S` ,,,, Phone: - Moe c N/A YES NO 1.Required#of copies received t.- 2.Date of soils exam and percolation test not older than 2 years t.,------' 3.4-5 ft of naturally occurring pervious material, above water table (.----- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: C...---'- 5.Water line 10 ft from septic components Var.: 1------' 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 11(4 ---.:_ 1;;iy 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,-- 11.Tank/leaching minimum 10 ft from property line Var.: / v 12. System meets all other setback requirements Var.: L----- 13. -i13.Uses adjustment for maximum high groundwater Var.: 1/4---- 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: .....----- 15. System not in top or subsoil(A,B horizons)or 5'removal t...---*- 16.Proposed contours are suitable l_._o 17. System meets slope requirements-min. 1/8", ' "preferred �_-. 18. System meets breakout requirements PVC liner: Wall: 1/4..------- 19. .119. Specified tee sizes are proper, gas baffle on outlet tee 1/4--- 20. Sewage is under 10,000 gpd for parcel 1/4_...„ 21.No garbage disposal '1/4-... 22. System adequately sized for its intended use `_--- 23.Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade ..----- 25.Inspection port on plastic chambers/leach field 1/4.-- 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size .-----o- 28. Septic tank/pump chamber to be factory waterproofed ------- 29.Vent provided if leaching below 3 feet, under driveway/parking /' 30.Buoyancy calculations for tank/pump chamber .-------' 31.Engineer to inspect and certify soils: wall: commercial: - -'---.-- 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature � ---• 33.H-20 loading is subject to vehicular traffic, groundwater _____-- 34. Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 1- 37.Check area lots for groundwater/Label groundwater in Assessor's Map , �L Plan reviewed by: 6 6/03/03