HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST /
Location: A.M. 17 Lot 7j Zone of Contribution: In ✓Out_ Acreage 4W-
Commercial: Residential:
Street:2 ‘ / _
Village: , IGZv�'
L / Floor Plan: ✓ #Bedrooms: .
Owner: / , ! Installer:-----1� S r
Address: Phone: 2.--
Phone:
Builder: Engineer:
Address: Phone: Q -7 S` ,,,,
Phone: - Moe
c
N/A YES NO
1.Required#of copies received t.-
2.Date of soils exam and percolation test not older than 2 years t.,------'
3.4-5 ft of naturally occurring pervious material, above water table (.-----
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: C...---'-
5.Water line 10 ft from septic components Var.: 1------'
6.Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 11(4 ---.:_ 1;;iy
9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,--
11.Tank/leaching minimum 10 ft from property line Var.: / v
12. System meets all other setback requirements Var.: L-----
13.
-i13.Uses adjustment for maximum high groundwater Var.: 1/4----
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: .....-----
15. System not in top or subsoil(A,B horizons)or 5'removal t...---*-
16.Proposed contours are suitable l_._o
17. System meets slope requirements-min. 1/8", ' "preferred �_-.
18. System meets breakout requirements PVC liner: Wall: 1/4..-------
19.
.119. Specified tee sizes are proper, gas baffle on outlet tee 1/4---
20. Sewage is under 10,000 gpd for parcel 1/4_...„
21.No garbage disposal '1/4-...
22. System adequately sized for its intended use `_---
23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade
..-----
25.Inspection port on plastic chambers/leach field 1/4.--
26.Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size .-----o-
28. Septic tank/pump chamber to be factory waterproofed -------
29.Vent provided if leaching below 3 feet, under driveway/parking /'
30.Buoyancy calculations for tank/pump chamber .-------'
31.Engineer to inspect and certify soils: wall: commercial: - -'---.--
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature � ---•
33.H-20 loading is subject to vehicular traffic, groundwater _____--
34. Title V Application and permit fee, installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd 1-
37.Check area lots for groundwater/Label groundwater in Assessor's Map , �L
Plan reviewed by:
6 6/03/03