Loading...
HomeMy WebLinkAboutReview Checklist 7-4- j TOWN OF YARMOUTH • SEWAGE PLAN REVIEW CHECKLIST Location: A.M. /'3 Lot /2--- Zone of Contribution: In Out 4creage Street: PS-- 4'' '�� �� � Commercial: Residential: Village: Floor Plan: L/ #Bedrooms: // Owner: 9 / U -7 Installer: i'� Address: Phone: /� � - 3 Phone: '/ � Q1(7e--e:/r .. Builder: Engineer: r Address: Phone: 0' �O - �. Phone: 'a , 1 G2'' 0``7441 N/A YES NO 1.Required#of copies received t/ 2. Date of soils exam and percolation test not older than 2 years �: 1....----"" 3.4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: c.._---- 5. `5. Water line 10 ft from septic components Var.: ✓itif-to7' 6.Benchmark indicated and shown-NGVD if near wetlands .--(.13 1 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:Kfkdow 01,14404,-f Ct 9.Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ----- 11. 11.Tank/leaching minimum 10 ft from property line Var.: C.--"" 12. System meets all other setback requirements Var.: V 13. Uses adjustment for maximum high groundwater Var.: 'L_.--'' 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: L_---. 15. System not in top or subsoil(A,B horizons)or 5'removal �_.---' 16.Proposed contours are suitable L_', 17. System meets slope requirements-min. 1/8", 'A"preferred l � . 18. System meets breakout requirements PVC liner: Wall: L...---'. 19. Specified tee sizes are proper, gas baffle on outlet tee L.-----/ 20. Sewage is under 10,000 gpd for parcel �. 21.No garbage disposal 1 / 22. System adequately sized for its intended use C� ' 23.Minimum 6"stone or compacted below tank and dbox 1.------ 24.Manhole covers within 6"of grade,pump chamber cover to grade �..----- 25.Inspection port on plastic chambers/leach field \----' 26.Electrical permit for pump chamber/Separate meter for duplexes ` ---- 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size �-�/` 28. Septic tank/pump chamber to be factory waterproofed L/" 29.Vent provided if leaching below 3 feet,under driveway/parking k.....----• 30.Buoyancy calculations for tank/pump chamber `_, 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature L.----- 33.H-20 loading is subject to vehicular traffic, groundwater L/ 34.Title V Application and permit fee, installer signature t-,-,. 35.Foundation footing min. 2 feet above adjusted ground water for new house `.---" 36.Deed Restriction required max. #bedrooms: max. flow: gpd ---- ......---- 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: G.,,,-). 6/03/03