Loading...
HomeMy WebLinkAbout83-2011 - COC recorded939 main street rt 6a yarmouth port mass 02675 land court surveys structural design site planning sewage system designs inspections permits down cape engineering, inc civil engineers & land surveyors July 2, 2019 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Re: Request for Certificate of Compliance SE83-2011 (29 Lewis Bay Blvd., West Yarmouth) Dear Commission Members: tel. (508) 362-4541 fax (508) 362-9880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala, P.E., P.L.S. Daniel E. Gonsalves, P.E., S.E Craig J. Ferrari, E.I.T., S.E. On 1/29/15, the Commission issued an Order of Conditions for the above -referenced site, for the construction of a 2 car garage. Photographs and an as -built site plan are enclosed for review. Instead of gutters and downspouts, the garage roof run-off is handled and contained within the shell base which surrounds the structure and is part of the completed shell driveway. To the best of my knowledge and belief, this is to certify that the site is in substantial compliance with the approved plans and Order of Conditions. We hereby request the issuance of a Certificate of Compliance at this time. Thank you for your consideration. Very truly yours, Com/ Daniel A. Ojala, PE, 4LS Down Cape Engineering, Inc. cc: M. Proshan encl. Upon completion 3 of the work authorized in an Order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. The project site is located at: 29 Lewis Bay Blvd., Unit 7 Street Address 16 West Yarmouth City/Town 48-C7 Assessors Map/Plat Number Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner (if different) Barnstable County Book Page C355-7 LCP 12424-C Doc. 1,264,132 Certificate (if registered land) 5. This request is for certification that (check one): ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaformBa.doc -- rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection ILI Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance SE83-2011 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information Important: When filling out 1. This request is being made by: forms on the Mark Proshan computer, use Name only the tab key to move 128 North Blandford Road your cursor - Mailing Address do not use the Blandford MA 01008 return key. City/Town State Zip Code r� Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: 18"x' Mark Proshan Applicant 1/29/15 SE83-2011 Dated DEP File Number Upon completion 3 of the work authorized in an Order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. The project site is located at: 29 Lewis Bay Blvd., Unit 7 Street Address 16 West Yarmouth City/Town 48-C7 Assessors Map/Plat Number Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner (if different) Barnstable County Book Page C355-7 LCP 12424-C Doc. 1,264,132 Certificate (if registered land) 5. This request is for certification that (check one): ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaformBa.doc -- rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance SE83-2011 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massder)/about/contacts/find-the-massdep-regional-office- for-you r -city -or -town. html). wpaform8a.doc -- rev. 5/29/14 Page 2 of 2 Scale:1 "= 20' 0 10 20 30 40 50 FEET ASBUILT STONE PATIO APPROX 12.5' X 14.5' (IRREGULAR SHAPE) X01 �-\� ASBUILT PLAN OF LAND IN off 508-362-4541 WEST YARMOUTH, MA fox 508 362-9880 29 LEWIS BAY BLVD. UNIT 7 - down doWn corp e engineering, inc. PREPARED FOR ciVL ENGINEERS MARK PROSHAN LAND SURVEYORS — 939 Main Street - YARMOUTHPORT, MASS. DCE #12-191 12-191 PROSHAN-TALLON.DWG DATE: SEPTEMBER 18, 2018 r FiF f F M