July 2, 2019
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Re: Request for Certificate of Compliance
SE83-2011 (29 Lewis Bay Blvd., West Yarmouth)
Dear Commission Members:
tel. (508) 362-4541
fax (508) 362-9880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala, P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E
Craig J. Ferrari, E.I.T., S.E.
On 1/29/15, the Commission issued an Order of Conditions for the
above -referenced site, for the construction of a 2 car garage.
Photographs and an as -built site plan are enclosed for review.
Instead of gutters and downspouts, the garage roof run-off is
handled and contained within the shell base which surrounds the
structure and is part of the completed shell driveway.
To the best of my knowledge and belief, this is to certify that
the site is in substantial compliance with the approved plans
and Order of Conditions. We hereby request the issuance of a
Certificate of Compliance at this time.
Thank you for your consideration.
Very truly yours,
Com/
Daniel A. Ojala, PE, 4LS
Down Cape Engineering, Inc.
cc: M. Proshan
encl.
Upon completion 3
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of 4
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
The project site is located at:
29 Lewis Bay Blvd., Unit 7
Street Address
16
West Yarmouth
City/Town
48-C7
Assessors Map/Plat Number Parcel/Lot Number
The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
County Book Page
C355-7 LCP 12424-C Doc. 1,264,132
Certificate (if registered land)
5. This request is for certification that (check one):
® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaformBa.doc -- rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
ILI
Bureau of Resource Protection - Wetlands
DEP File Number:
WPA Form 8A — Request for Certificate of Compliance
SE83-2011
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information
Important:
When filling out
1. This request is being made by:
forms on the
Mark Proshan
computer, use
Name
only the tab
key to move
128 North Blandford Road
your cursor -
Mailing Address
do not use the
Blandford MA
01008
return key.
City/Town State
Zip Code
r�
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
18"x'
Mark Proshan
Applicant
1/29/15 SE83-2011
Dated DEP File Number
Upon completion 3
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of 4
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
The project site is located at:
29 Lewis Bay Blvd., Unit 7
Street Address
16
West Yarmouth
City/Town
48-C7
Assessors Map/Plat Number Parcel/Lot Number
The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
County Book Page
C355-7 LCP 12424-C Doc. 1,264,132
Certificate (if registered land)
5. This request is for certification that (check one):
® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaformBa.doc -- rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance SE83-2011
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massder)/about/contacts/find-the-massdep-regional-office-
for-you r -city -or -town. html).
wpaform8a.doc -- rev. 5/29/14 Page 2 of 2
Scale:1 "= 20'
0 10 20 30 40 50 FEET
ASBUILT STONE PATIO
APPROX 12.5' X 14.5'
(IRREGULAR SHAPE)
X01
�-\�
ASBUILT
PLAN OF LAND
IN
off 508-362-4541 WEST YARMOUTH, MA
fox 508 362-9880 29 LEWIS BAY BLVD. UNIT 7 -
down
doWn corp e engineering, inc. PREPARED FOR
ciVL ENGINEERS MARK PROSHAN
LAND SURVEYORS —
939 Main Street - YARMOUTHPORT, MASS.
DCE #12-191 12-191 PROSHAN-TALLON.DWG
DATE: SEPTEMBER 18, 2018
r FiF f F
M