HomeMy WebLinkAboutReview Checklist •
TOWN OF YARMOUTH
Y � SEWAGE PLAN REVIEW CHECKLIST
Location: AM� L01. --;1•6 Date of Subdivision Approval
�' PP
Street /0 Cd , ica Zone of Contribution: In Out
Village C Commercial Residential f
Owner: `/4G 5 /(IV1 il Installer4aCog '
Builder: -�` Engineer 7c2ho icivie-
'''''' '-
N/A YES NO
,
L.
1. Required number of copies received.
2. Date of soils exam and percolation test not older than 2 years. c....----
3. 4 feet of naturally occurring pervious material, above water table(new construction)
4. Foundation 2 feet above high point of fronting road for new construction. i
5. Water availability letter from Water Department for new construction. ,
6. Benchmark indicated and shown-NGVD if near wetlands. c_-
7. Building sewer does not exit center of house. (.-----
8.
/8. Septic tank a minimum of 10 feet from house and deck.
9. Leaching a minimum of 20 feet from house and 10 feet from deck.
10. Leaching a minimum of 100 feet from wetlands.
11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. c,-
12, System meets all other setback requirements. ..----
13.
. -j13. Uses adjustment for maximum high groundwater.
14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. , ,-
15. System not in top or subsoil or 5 foot removal. ,
16. Proposed contours are suitable.
17. System meets slope requirements - min. 1/8". 1/4" preferred.
. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. ,./
19. Specified tee sizes are proper. gas baffle on outlet tee.
20. Sewage flow under 10.000 gpd for parcel. ,�/
X21. No garbage disposal. c_.------
22.
am'22. System adequately sized for its intended use.
23. Minimum 6" stone or mechanically compacted below the tank and d-box. c-------
24.
24. Manhole covers within 6" ofgrade - septic tank and pump chamber. ‘.....----
25. Electrical permit for pump chamber.
26. Pump system - 2" line. weep hole. check valve. sanitary in d-box. alarm on separate circuit. ,-------
27.
27. Septic tank and pump chamber to be Factory waterproofed. _..--
28. Vent provided if leaching below 3 feet or under driveway or parking.
29. Engineer to inspect and certify : A. clay removal ...,%
b. wall construction schedule _.--
c. commercial system
30. Engineer and Land Surveyor stamp and signature. �/
1. H21 1. . in T when Y- sub'-ct t. v- cul.r traffic
32. Title V application and fee signed by a licensed installer. ,__� -
33. Foundation footing 2 feet above adjusted water table.
34. Lot subdivided prior to July 31. 1986 Nitrate Loading,
35. Subdivided prior co April 7. 1989 - Phosphorus Zone 300'. �-
Plan reviewed by: C.,4