Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH oc x.s_6 SEWAGE PLAN REVIEW CHECKLIST Location: AM 76, LOT 23 7 Date of Subdivision Approval .ZG, if7Dx` f_7, . i' Street 6 ,4i S . Zone of Contribution: In Out Village P4/-• ( Q'G/� G'� I Commercial Residential Owner: /caw ie.e.fii Installer T73--/V Builder: Engineer VcW-%2/ N/A YES NO 1. Required number of copies received. /y X 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) ../ 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. / 6. Benchmark indicated and shown-NGVD if near wetlands. `/ 7. Building sewer does not exit center of house. �// 8. Septic tank a minimum of 10 feet from house and deck. c/` 9. Leaching a minimum of 20 feet from house and 10 feet from deck. // 10. Leaching a minimum of 100 feet from wetlands. / c/ 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. V / 12. System meets all other setback requirements. 13_ Uses adjustment for maximum high groundwater. i 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. ki715. System not in top or subsoil or 5 foot removal. 1C Proposed contours are suitable. 3''4zcgi-t-49 f1' --/ • 17. System meets slope requirements - mini. 1/8", 1/4" preferred. 18. System meets breakout requirements.- peastone elevation carried out 15 feet minimum. .// 19. Specified tee sizes are proper. gas baffle on outlet tee. ✓ • 20. Sewage flow under 10,000 gpd for parcel. 21. No garbage disposal. / 22. System adequately sized for its intended use. 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. // ;/ 25. Electrical permit for pump chamber. t/ 26. Pump system - 2" line. weep hole, check valve, sanitary in d-box. alarm on separate circuit. ‘/// 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. 31. H2O loading when system subject to vehicular traffic. 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. J 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior co April 7, 1989 - Phosphorus Zone 300'. L2 Plan reviewed by: