HomeMy WebLinkAboutrevised site plan 8.15.1912"
2' MIN.
3" WASHERS
W/ NUTS
16'±
SEE PLAN 2"x4" W/ 2"x12" CAP ASSEMBLY
FOR CAP EL.
GRADE -
2"x6" —�
1
INNER WALE = 14'
1" DIAM. ROD
THREADED ®ENDS
3"x10" CONTINUOUS
OVER 3 PILES BOLTED
12" DIAM. PILING
10 FT. LONG
SHEET PILE
WALL DETAIL
(NO SCALE)
CL 9900 SHEET PILE
14 FT. LONG±
10"0 PILING
ANCH
PILIN
10 FT. L.
C_
i EACH
WALE
TS
5/8" BOLTS
FOR WALERS
SHEET WALL PLAN VIEW
NO SCALE
3" DOCK
WASHERS
10 5 0
► ten► v
10
1 inch = 10 ft.
30
EMBEDMENT VARIES
P,\_\NOS \\
z
5/8" BOLI
UC -30
SHEET TO
OR
VINYL
i
0
SG 9900
SHEETS
18" WALER
SCARF JOII
i
5 ANCHOR SHAFT
1.0" DIA.
30
x
w
Q
C
z
N
a
16'±
5.5"
i EACH
WALE
TS
5/8" BOLTS
FOR WALERS
SHEET WALL PLAN VIEW
NO SCALE
3" DOCK
WASHERS
10 5 0
► ten► v
10
1 inch = 10 ft.
30
EMBEDMENT VARIES
P,\_\NOS \\
REPLACE BLOCK
WALL w/ VERTICAL
#5 RE -BAR w/
GROUT @ 16" O.C.
GRADE VARIES @
APPROX. WATER
TABLE EL.
ICAL PILINGS @ 4 FT. O.C.
BUILDING PLAN)
DETAIL OF BLOCK WALL SUPPORT
NO SCALE
z
i
i
i
0
i
i
REPLACE BLOCK
WALL w/ VERTICAL
#5 RE -BAR w/
GROUT @ 16" O.C.
GRADE VARIES @
APPROX. WATER
TABLE EL.
ICAL PILINGS @ 4 FT. O.C.
BUILDING PLAN)
DETAIL OF BLOCK WALL SUPPORT
NO SCALE
NOTES
1. TOPOGRAPHIC / HYDROGRAPHIC CONDITIONS ARE REPRESENTATIVE OF A FIELD
SURVEY PERFORMED DURING THE FALL OF 2018.
2. EXISTING STAIRS / PILE- SUPPORTED PIER REQUIRE ADJUSTMENT TO ACCOMMODATE
THE BULKHEAD INSTALLATION. REPLACE ANY REMOVED COMPONENTS IN THE
EXISTING LOCATION
3. ELEVATIONS REFER TO NAVD88. TRANSFER ACCURATE ELEVATION BENCHMARK TO A
STABLE POINT PRIOR TO BEGINNING WORK OR DEMOLITION. CONTACT CAPE COD
ENGINEERING, INC. FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED.
4. CONSTRUCTION ACCESS SHALL BE VIA THE ACCESS ROUTE SHOWN ON THE SITE PLAN
OR BY BARGE.
5. ALL TIMBER USED FOR THE BULKHEAD SHALL BE GREENHEART CONSTRUCTION GRADE
OR OTHER NATURAL WOOD OR COMPOSITE MATERIAL. CCA TREATED LUMBER IS NOT
PERMITTED BY YARMOUTH REGULATIONS
6. SHEATHING AS SPECIFIED ON THE RESPECTIVE PROFILES AND SHALL BE VIBRATED INTO
PLACE. JETTING ACTION ONLY TO CLEAR SUBTERRANEAN OBSTRUCTIONS
7. END JOINTS, DRILLED HOLES AND CORNERS SHALL BE LINED WITH A GEOTEXTILE
WOVEN FILTER FABRIC WHERE ANY CUTS OR SPECIAL FITTING IS REQUIRED, OR WHERE
BUTTED AGAINST ADJACENT SHEETS.
8. ANY DRAIN HOLES, CRACKS OR IMPERFECTIONS IN THE SHEETS SHALL BE BACKED WITH
FIXED FILTER CLOTH PRIOR TO BACK FILL. DRAIN HOLES ARE NOT ESSENTIAL.
9. HARDWARE SUCH AS NUTS, BOLTS, WASHERS, ANCHOR TIE RODS, NAILS AND SPIKES
SHALL BE HOT -DIP GALVANIZED STEEL.
10. ALL FILL MATERIAL SHALL BE OF CLEAN COMPOSITION, FREE OF ANY DEBRIS,
ORGANICS OR FINE SOIL MATERIAL SUCH AS SILT OR CLAY.
11. ALL DEBRIS FROM CONSTRUCTIO / DEMOLITION SHALL BE REMOVED FROM THE SITE
VIA THE ACCESS ROUTES INDICATED. UNSUITABLE RUBBLE OR DEBRIS ENCOUNTERED
SHALL BE TAKEN OFF THE SITE AND DISPOSED OF IN ACCORDANCE WITH SOLID WASTE
HANDLING REGULATIONS..
12. DISTURBED AREAS LANDWARD OF THE BULKHEAD SHALL BE RESTORED TO A STABLE
CONDITION AS EXISTING. REGRADING OF THE PLATEAU IS ADVISED TO FACILITATE
SURFACE DRAINING OF OVER -TOPPED TIDE WATER.
13. ALTERATIONS, CHANGES, VARIATIONS FROM THE PLAN SHALL BE BROUGHT TO THE
ATTENTION OF THE DESIGN ENGINEER PRIOR TO DEVIATION FROM THE PLAN
SPECIFICATIONS.
14. THIS PLAN HAS BEEN PREPARED FOR ENVIRONMENTAL REVIEW FOR THE BULKHEAD
RENOVATIUON ON THREE CONTIGUOUS PROPERTIES. ADDITIONAL CONSTRUCTION
TECHNIQUES, HARDWARE AND EQUIPMENT SPECIFICATION IS AVAILABLE THROUGH
CAPE COD ENGINEERING, INC. PLEASE REFER TO THE SPECIFIC ORDER OF CONDITIONS
FOR THE RESPECTIVE ADDRESS SITES.
15. ADDITIONAL FOUNDATION RE -SUPPORT TASKS ARE REQUIRED AT 15 NORTH COVE
LANDING DUE TO THE COINCIDENCE WITH THE PUBLIC NORTH COVE LANDING
PROPERTY BOUNDARY.
16. FIBERGLASS MATS SHALL BE PLACED ON THE SALT MARSH AS PROTECTION DURING
WORK ACTIVITY PERIODS.
17. THE 32 FT. FOUNDATION SEGMENT TO BE FORTIFIED REPRESENTS 22 % OF THE 146
FT. FOUNDATION PERIMETER. SEE HELICAL PILE AND FOUNDATION REINFORCEMENT
DETAILS ON BUILDING PERMIT PLAN.
ANNINO.DWG
z
0
30
o
w
z
a
20
25
15
FLOOD ZONE VE
15
FLOOD ZONE VE
w
o
o
EL.=13L'i
y EL.=13
c=n
15
w
FLOOD ZONE VE
v
z
20
FLOOD ZONE AE
EL.=12
=
REMOVE EXISTING
v EL.=13
10
a
a
BUILDING #15
REGRADE
WALL &FOOTING
o w BASS RIVER
10
BUILDING
#15
10
T.O.F. EL.=6.4±
TO DRAIN
o
w
o Y
REGRADE TO o
o
_
15
FLOOD FLOOD ZONE VE
4' TO 5'
BASS RIVER
5
DRAIN OUT m
5
z
¢
BASS
ZONE 2 E v EL.=13
16'
PROP. T.O.W.
_ _
_ _ _ _ _ _ _ _ CAP. EL.=4
CAP. EL.=4
RIVER
-
5
- - -
----
EL.=5.5
_ _
v MHW=1.3
WALL & POST
ANCHOR ROD 1
ANCHOR ROD
10
TOWN OF YARMOUTF
SUPPORTS I
0
0
1'±
TOWN LANDING
J
MHW=
1
EL.I-I7115±I
16'± TI
1St. FLOOR
0
` ill
_ „,,,,,_,,,,,_ _
REMOVE EXIST.
I
5
REMOVE
SEE PROFILE
'��I
-••.„ II,11
-5
CONCRETE WALL
REPLACE i� 2 MORTAR/STONE
DEADMAN'
ANCHOR
_
-5
REMOVE
CONCRETE
BLOCK FNDN FOOTING
5
(SEE DETAIL)
PILE &
WALL BOTTOM OF
0
WALL _
(SEE DETAIL) I .� DEPTH NOT KNOWN
PILE &
-10
SHEET
BOTTOM
-10
PILE & SHEET
EL.= -10
I
SHEET TOE
EL.= -10
PUSH PILE NOT SHOWN
-10
EL.= -11
-5
-15
-15
0 10
20 30
40
50 60
0 10 20 30
0
10 20 30
0 10 20
30
PROFILE A -A
PROFILE
B -B
PROFILE C -C
PROFILE D -D
1"=10'
1"=10'
1"=10'
1"=10'
NOTES
1. TOPOGRAPHIC / HYDROGRAPHIC CONDITIONS ARE REPRESENTATIVE OF A FIELD
SURVEY PERFORMED DURING THE FALL OF 2018.
2. EXISTING STAIRS / PILE- SUPPORTED PIER REQUIRE ADJUSTMENT TO ACCOMMODATE
THE BULKHEAD INSTALLATION. REPLACE ANY REMOVED COMPONENTS IN THE
EXISTING LOCATION
3. ELEVATIONS REFER TO NAVD88. TRANSFER ACCURATE ELEVATION BENCHMARK TO A
STABLE POINT PRIOR TO BEGINNING WORK OR DEMOLITION. CONTACT CAPE COD
ENGINEERING, INC. FOR ADDITIONAL ELEVATION INFORMATION AS NEEDED.
4. CONSTRUCTION ACCESS SHALL BE VIA THE ACCESS ROUTE SHOWN ON THE SITE PLAN
OR BY BARGE.
5. ALL TIMBER USED FOR THE BULKHEAD SHALL BE GREENHEART CONSTRUCTION GRADE
OR OTHER NATURAL WOOD OR COMPOSITE MATERIAL. CCA TREATED LUMBER IS NOT
PERMITTED BY YARMOUTH REGULATIONS
6. SHEATHING AS SPECIFIED ON THE RESPECTIVE PROFILES AND SHALL BE VIBRATED INTO
PLACE. JETTING ACTION ONLY TO CLEAR SUBTERRANEAN OBSTRUCTIONS
7. END JOINTS, DRILLED HOLES AND CORNERS SHALL BE LINED WITH A GEOTEXTILE
WOVEN FILTER FABRIC WHERE ANY CUTS OR SPECIAL FITTING IS REQUIRED, OR WHERE
BUTTED AGAINST ADJACENT SHEETS.
8. ANY DRAIN HOLES, CRACKS OR IMPERFECTIONS IN THE SHEETS SHALL BE BACKED WITH
FIXED FILTER CLOTH PRIOR TO BACK FILL. DRAIN HOLES ARE NOT ESSENTIAL.
9. HARDWARE SUCH AS NUTS, BOLTS, WASHERS, ANCHOR TIE RODS, NAILS AND SPIKES
SHALL BE HOT -DIP GALVANIZED STEEL.
10. ALL FILL MATERIAL SHALL BE OF CLEAN COMPOSITION, FREE OF ANY DEBRIS,
ORGANICS OR FINE SOIL MATERIAL SUCH AS SILT OR CLAY.
11. ALL DEBRIS FROM CONSTRUCTIO / DEMOLITION SHALL BE REMOVED FROM THE SITE
VIA THE ACCESS ROUTES INDICATED. UNSUITABLE RUBBLE OR DEBRIS ENCOUNTERED
SHALL BE TAKEN OFF THE SITE AND DISPOSED OF IN ACCORDANCE WITH SOLID WASTE
HANDLING REGULATIONS..
12. DISTURBED AREAS LANDWARD OF THE BULKHEAD SHALL BE RESTORED TO A STABLE
CONDITION AS EXISTING. REGRADING OF THE PLATEAU IS ADVISED TO FACILITATE
SURFACE DRAINING OF OVER -TOPPED TIDE WATER.
13. ALTERATIONS, CHANGES, VARIATIONS FROM THE PLAN SHALL BE BROUGHT TO THE
ATTENTION OF THE DESIGN ENGINEER PRIOR TO DEVIATION FROM THE PLAN
SPECIFICATIONS.
14. THIS PLAN HAS BEEN PREPARED FOR ENVIRONMENTAL REVIEW FOR THE BULKHEAD
RENOVATIUON ON THREE CONTIGUOUS PROPERTIES. ADDITIONAL CONSTRUCTION
TECHNIQUES, HARDWARE AND EQUIPMENT SPECIFICATION IS AVAILABLE THROUGH
CAPE COD ENGINEERING, INC. PLEASE REFER TO THE SPECIFIC ORDER OF CONDITIONS
FOR THE RESPECTIVE ADDRESS SITES.
15. ADDITIONAL FOUNDATION RE -SUPPORT TASKS ARE REQUIRED AT 15 NORTH COVE
LANDING DUE TO THE COINCIDENCE WITH THE PUBLIC NORTH COVE LANDING
PROPERTY BOUNDARY.
16. FIBERGLASS MATS SHALL BE PLACED ON THE SALT MARSH AS PROTECTION DURING
WORK ACTIVITY PERIODS.
17. THE 32 FT. FOUNDATION SEGMENT TO BE FORTIFIED REPRESENTS 22 % OF THE 146
FT. FOUNDATION PERIMETER. SEE HELICAL PILE AND FOUNDATION REINFORCEMENT
DETAILS ON BUILDING PERMIT PLAN.
ANNINO.DWG