HomeMy WebLinkAboutBld-20-000933 (2) t
ewrAA-0-6/ 4 4/
61*Y4 TOWN OF YARMOUTH Building Department BUILDING
(508) 398-2231 ext.1261
or, " c. PERMIT NO BLD 20 000933 PERMIT
c' ;t Ems '' JOB WEATHER CARD
`"0.01'" rd
ISSUE DATE 08/20/2019
APPLICANT HENRY CASSIDY PERMIT TO New
AT(LOCATION) 11 DANCING BROOK RD,SOUTH YARMOUTH M ! ZONING DISTRICT R 40 x Bldg.Type: Residential
SUBDIVISION MAP BLOCK LOT §058 177 i BUILDING IS TO BE: ICONST TYPE €'V B s USE GROUP iR 3
r , I CONTRACTOR
REMARKS Repair: Install Insulation(508-775-1214) q I �.. !
LICENSE i153567
;Home Improvement
' „CAPE COD INSULATION, INC
HENRY CASSIDY
1 18 REARDON CIRCLE
AREA(SQ FT) 455 376 240.i EST COST($) 3000 00 i PERMIT FEE($) 35 00 i SO.YARMOUTH, MA 02664
OWNER IABRUNZO GAIL ANN ���
BUILDING DEPT BY
ADDRESS 1 DANCING BROOK RD ieV
SOUTH YARMOUTH 1MA 102664 I_. NE 1
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWAL AOR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
MEMBERS(READY FOR LATH OR FINISH WHERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPIED UNTIL FINAL INSPECTION HAS
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE.
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER: I
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.