Loading...
HomeMy WebLinkAboutReview Checklist (61 )/7/1 ' )/ / TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. q/ Lot 66 Zone of Contribution: In Out Acreage Commercial: Residential: ✓ : Street: 57 /..-.72,tie; .:4esi,cefilki-- Village: ,ie/ Floor Plan: ✓ #Bedrooms: Owner: 76r Installer: '4/ '0'' /4eJ Address: Phone: / - 77• C'-7/ Phone: Builder: Engineer: Lir /G Address: Phone: gerg 4:0.4' ? 7 ./ - Phone: 14:6 4� `-c ; / mo eA N/A YES NO 1.Required#of copies received tom 2.Date of soils exam and percolation test not older than 2 years c----'' 3.4-5 ft of naturally occurring pervious material, above water table t--�' 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: s----- 5.Water line 10 ft from septic components Var.: V,.----- 6.Benchmark indicated and shown-NGVD if near wetlands �---- 7. Septic tank minimum 10 ft from foundation, deck Var.: ‘..--- 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: 4._.----- 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: L./' 11.Tank/leaching minimum 10 ft from property line Var.: L� 12. System meets all other setback requirements Var.: .._.----- 13. ____�13.Uses adjustment for maximum high groundwater Var.: �..� 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: _....--- 15. System not in top or subsoil(A,B horizons)or 5'removal �-- 16.Proposed contours are suitable �_-..--" 17. System meets slope requirements-min. 1/8", 'A"preferred 1.----- 18. .`18. System meets breakout requirements PVC liner: Wall: L---- 19. Specified tee sizes are proper,gas baffle on outlet tee `_, 20. Sewage is under 10,000 gpd for parcel ....-- 21.No garbage disposal r 22. System adequately sized for its intended use L'- 23.Minimum 6"stone or compacted below tank and dbox L---- 24.Manhole covers within 6"of grade,pump chamber cover to grade 1/ 25.Inspection port on plastic chambers/leach field 1/4..--- 26.Electrical permit for pump chamber/Separate meter for duplexes -----' 27.Pump system-2"line,weep hole,check valve,tee in dbox, pump size .-----"" 28. Septic tank/pump chamber to be factory waterproofed io" 29.Vent provided if leaching below 3 feet,under driveway/parking ,..-------- 30.Buoyancy calculations for tank/pump chamber _,/ 31.Engineer to inspect and certify soils: wall: commercial: ..----- 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature ./- 33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Mai Plan reviewed by: e' 6/03ro3