Loading...
HomeMy WebLinkAboutReview Checklistr TOWN OF YARMOUTH .1, SEWAGE PLAN REVIEW CHECKLIST Location: AM ii LOT_____ Date of Subdivision Approva Street 21 f - Zone of Contribution:/, ' Out Village Y Commercial esidential Owner: t' L 'L SV -/-& "" Installer ,43V�i 42-e - 5- Builder: "%le- Engineer �" - i- E_ _39'F v -) N/A YES NO 1. Required number of copies received. h% 2. Date of soils exam and percolation test not older than 2 years. * 3. 4 feet of naturally occurring pervious material, above water table(new construction) 4. Foundation 2 feet above high point of fronting road for new construction. X 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown-NGVD if near wetlands. \/.3e' 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. 9. Leaching a minimum of 20 feet from house and 10 feet from deck. X 10. Leaching a minimum of 100 feet from wetlands. 2e U41L1 4 • X 11. Leaching a minimum of 150 feet from drinking we b/25 feet from irrigation wells. Ne' 12. System meets all other setback r uirements. 4 '(/(t I.(uk,i) /7'- X 13. Uses adjustment for maximum •' groundwater. 14. Leaching 4 -5 feet above ad'u water table 9r bottom of test pit. 15. System not in top or subsoil or foot rec io 1. 16. Proposed contours are suitable. X 17..System meets slope requirements- min. 1/8". 1/4" preferred. X 18. System meets breakout requirements- peastone elevation carried out 15 feet • • um. 19 Specified tee sizes are proper, gas baffle on outlet tee. 20iSewage flow under 10.000 gpd for parcel. 21. No garbage disposal. 76 � u- 22. System adequately sized for its intended use. 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. 26. Pump system- 2" line, weep hole. check valve. sanitary in d-box. alarm on separate circuit 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule r" c. commercial system 30. Engineer and Land Surveyor stamp and signature. l- k 31. H2O loading when system subject to vehicular traffic. 32. Title V application'and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31: 1986 -Nitrate Loading. 35. Subdivided prior co April 7. 1989 - Phosphorus Zone 300'. Plan reviewed by: 02kA