Loading...
HomeMy WebLinkAboutReview Checklist ,;,.--vim_, %W TOWN OF,YARNIOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. '1? Lot zZ J Zone of Contribution: In Out Acreage Commercial: Residential: Street: eb 6 .4r1C ca Village: Lbif GLGLii/7i2 Floor Plan: v #Bedrooms: . 4. Owner: A����-r.( 70i1..1_1--(2 Installer: Address: Phone: -7 78- I Phone: Builder: Engineer: be",,1 . Address: 7 , Phone: fJ Phone: N/A YES / NO 1.Required#of copies received i/ 2.Date of soils exam and percolation test notolder than 2 years : , ; . - . 3. 4-5 ft of naturally occurring pervious material,.above water table 4.Foundation 2 ft above high point of road .1-1.P.:` - Fnd: Var.: jy� . . 5. RFater line 10 ftfrom septic components Var.. t 6.Benchmark indicated and shown-NGVD if near wetlands , . . 7. Septic tank minimum 10 ft from foundation,deck Var.: „,„,,,,,„.„,ir 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var 9.Leaching minimum 100 ft from wetlands Var.:; 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: L- 11. Tank/leaching minimum 1.0 ft from property line . Var.: .., )...../".", 12. System meets all other setback requirements Var.: - 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: -.: < l/"• , 15. System not in top or subsoil(A,B horizons)or 5'removal 16.Proposed contoursare suitable 17. System meets slope requirements,min. 1/8", 14"preferred t,/'�. . - 18. System meets breakout requirements PVC liner: ,Wall: �� 19. Specified tee sizes are proper,gas baffle on outlet tee 2• 0. Sewage is under,10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended usea �, 23.Minimum 6"stone or compacted below tank and dbox-., /.: t - -= 25.Inspection port on plastic chambers/leach field 24.Manhole covers within 6"of de chamber cover to grade 26.Electrical permit for pump. chamber/Separate meter for.duplexes, . m ' ::,7: 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ( . 28. Septic tank/pump chamberto be factory waterproofed , 29.Vent provided if leaching below 3 feet, under driveway/parking. (.4 30. Buoyancy calculationsfor tank/pump chamber 31. Engineer to inspect and certify soils: wall: , ..commercial; 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. 11-20 loading is subject to vehicular traffic, groundwater t/ 34. Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max, #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map „c......,/ Plan reviewed by: 6/03/03