Loading...
HomeMy WebLinkAboutReview Checklist _ _...6 //g TOWN OF YARMOUTHA ,SEWAGE PLAN REVIEW CHECKLIST / xG• f , / Location: A.M. 2 Lot2-1 Zone of Contribution: In - 6ut_ Acreage -2-a." (&.(r/zy----47- Commercial: Residential: ' Street: ‘5.--- � z Village: KjV Floor Plan: �. #Bedrooms: ,3 Owner: �� 7/1 Installer: T7 Address: Phone: Phone: /n Builder: Engineer: E-A-9//Ulb! (®'\Gl- Address: Phone: 9-6 / 7--5,,/3 Phone: �,�GJ�C /. S�? li��, S N/A YES NO 1.Required#of copies received L✓ 2.Date of soils exam and percolation test not older than 2 years L,.--- 3.4-5 ft of naturally occurring pervious material,above water table (--` _ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: C.....---C.....----'. 5.Water line 10 ft from septic components Var.: CLQ 6.Benchmark indicated and shown-NGVD if near wetlands (--- 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 3 c�- 9.Leaching minimum 100 ft from wetlands Var.: -� 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: c_.---- 11.Tank/leaching minimum 10 ft from property line Var.: �--* 12. System meets all other setback requirements Var.: +7i'./p eli4 ,d c.---- 13. 13.Uses adjustment for maximum high groundwater Var.: `� 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: �® 15. System not in top or subsoil(A,B horizons)or 5'removal U----- 16. _f16.Proposed contours are suitable i,i-- 17. System meets slope requirements-min. 1/8", '/4"preferred (...----- 18. .,.-r18. System meets breakout requirements PVC liner: Wall: c._.---- 19. Specified tee sizes are proper, gas baffle on outlet tee C----- 20. Sewage is under 10,000 gpd for parcel (---. 21.No garbage disposal l_...--- 22. System adequately sized for its intended use c....--" 23.Minimum 6"stone or compacted below tank and dbox L----' 24.Manhole covers within 6"of grade,pump chamber cover to grade l-' 25.Inspection port on plastic chambers/leach field C.-- 26. „r26.Electrical permit for pump chamber/Separate meter for duplexes .....--- 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ......--- 28. Septic tank/pump chamber to be factory waterproofed k.._._- 29. _29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber `---• 31.Engineer to inspect and certify soils: wall: commercial: t._.---- 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature �._-� 33.H-20 loading is subject to vehicular traffic, groundwater ...------O 34.Title V Application and permit fee, installer signature 35.Foundation footing min.2 feet above adjusted ground water for new house _ 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map ' - Plan reviewed by: 6/03/03