HomeMy WebLinkAboutReview Checklist -(4 ( / TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. ✓ 1 Lot /� Zone of Contribution: In Out A reag�_
' ` 4710,/fAi
/��//® / Commercial: Residential:
/C7Street: `z�Village: i , Floor Plan: #Bedrooms:
Owner: Ptee- Installer: ,r.. IX / G
/�
Address: Phone: 4• -77 -2 _
Phone:
Builder: Engineer: e---, ,G,`L oe) /�
Address: Phone: 0? 47 'r�t,
Phone: )74Y ice[
N/A YES /NO
1.Required#of copies received
2.Date of soils exam and percolation test not older than 2 years L.....--
3.4-5
�3.4-5 ft of naturally occurring pervious material, above water table �----
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: `•- -
5.Water line 10 ft from septic components Var.: Lam-
6.Benchmark indicated and shown-NGVD if near wetlands ‘...-------
7. Septic tank minimum 10 ft from foundation, deck Var.: (.-----
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: (.....----
9.
�9.Leaching minimum 100 ft from wetlands Var.: _
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: -----
11.Tank/leaching minimum 10 ft from property line Var.: -fes
12. System meets all other setback requirements Var.: t.._-_-..-
13.Uses adjustment for maximum high groundwater Var.: �.-
14.Leaching set 4-5 ft above adj.water or bottom est le Ll
15. System not in top or subsoil(A,B horizons) r 5'remov t
16.Proposed contours are suitable L------
17. System meets slope requirements-min. 1/8", 'A"preferred %,- ---'
18. System meets breakout requirements PVC liner: Wall: r
19. Specified tee sizes are proper, gas baffle on outlet tee �-----
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal 1/4--_
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade c.--..
25.Inspection port on plastic chambers/leach field ®,
26.Electrical permit for pump chamber/Separate meter for duplexes -
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed `s
29.Vent provided if leaching below 3 feet, under driveway/parking �®'
30.Buoyancy calculations for tank/pump chamber `-®
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater �------
34.Title V Application and permit fee, installer signature - ..-----
35.
.----'35.Foundation footing min. 2 feet above adjusted ground water for new house ...„--',
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6/03/03