No preview available
HomeMy WebLinkAboutReview Checklist - -) c /( I TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. a� Lot ! Zone of Contribution: In Out creage / d>„, /��.% Commercial: Residential: Street: R %G ' Village: 7.'.'7 Floor Plan: t/ ft Bedrooms: 7 Owner: �/e?..dfi // Installer: ezad. 4.(--,.., Address: Phone: c---ii.'-- ) -c* 7 Phone: Builder: Engineer: 4 ®!.-fr7 Se-e- --err Address: Phone: -96 i.--E Phone: /WP(.."1 A N/A YES ,NO 1.Required# of copies received +�.---"'' 2. Date of soils exam and percolation test not older than 2 years t------ 3. 4-5 ------3. 4-5 ft of naturally occurring pervious material, above water table L 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: L/' 5. Water line 10 ft from septic components Var.: (.------ 6. moi6. Benchmark indicated and shown-NGVD if near wetlands L.----- 7. Septic tank minimum 10 ft from foundation, deck Var.: Vim' 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t_---- 9.Leaching minimum 100 ft from wetlands, Var.: c_.------ 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ., __.----- 11. 11. Tank/leaching minimum 10 ft from property line Var.: L_--- _ 12. System meets all other setback requirements Var.: �.----- 13. Uses adjustment for maximum high groundwater Var.: t---- 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: f 15. System not in top or subsoil(A,B horizons) or 5' removal 16.Proposed contours are suitable : / 17. System meets slope requirements-min. 1/8", '/4"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee L,---/ 20. Sewage is under 10,000 gpd for parcel C� _ - 21.No garbage disposal `../ 22. System adequately sized for its intended use L...%'' 23.Minimum 6" stone or compacted below tank and dbox 1 24.Manhole covers within 6"of grade,pump chamber cover to grade L/ 25. Inspection port on plastic chambers/leach field l...------- 26. /26. Electrical permit for pump chamber/Separate meter for duplexes L/'' 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size Lam' 28. Septic tank/pump chamber to be factory waterproofed CO 29.Vent provided if leaching below 3 feet, under driveway/parking C� 30.Buoyancy calculations for tank/pump chamber ' / O3231.Engineer to inspect and certify soils: wall: commercial: L.- 32. .Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature - `� �� 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd _ - 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03