HomeMy WebLinkAboutReview Checklist 7- f 4.--. q TOWN OF YARMOUTH
SEWAGE EE PLAN REVIEW CHECKLIST
Location: A.M. z3 Lot 7 J Zone of Contribution: In Out"-A reage
Commercial: Residential:
Street:
Village: �ff� Floor Plan: AO #Bedrooms:
Owner: 401 s 0- Installer: L+-"CCa 4%2r
Address: Phone: �j O. - ¢7 QG S-
Phone: 77,, ,
mem,_,..ww,-......,
Builder: Engineer: ,AG2/7o'
Address: Phone: / 7 71 -- 9,91 //��j
.ZV
Phone: (.0 yt a/' ��
�`r/ t
V /A YES NO 4 Af 4/S
./21.Required#of copies received c.,...------
2.
.Date of soils exam and percolation test not older than 2 years L___--
3.4-5
_r3.4-5 ft of naturally occurring pervious material,above water table L.---•
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.: Gv
6.Benchmark indicated and shown-NGVD if near wetlands ,t/
7. Septic tank minimum 10 ft from foundation, deck Var.: ti�
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: k._........--
9.
._..`9.Leaching minimum 100 ft from wetlands Var.: ,..----
10.
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: 5
12. System meets all other setback requirements Var.: t------
13.
----s13.Uses adjustment for maximum high groundwater Var.: t..------
14.
t14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: �--"'
15. System not in top or subsoil(A,B horizons)or 5'removal L---•
16.Proposed contours are suitable t_.1
17. System meets slope requirements-min. 1/8", '/a"preferred c-----
18. System meets breakout requirements PVC liner: W .Wall: L.-----"'
19. Specified tee sizes are proper, gas baffle on outlet tee L----'
20. Sewage is under 10,000 gpd for parcel �s
21.No garbage disposal c.....-----
22.
.122. System adequately sized for its intended use L-----#
23.Minimum 6"stone or compacted below tank and dbox 4.-�'
24.Manhole covers within 6"of grade,pump chamber cover to grade
25.Inspection port on plastic chambers/leach field L..--•
26.Electrical permit for pump chamber/Separate meter for duplexes .-.....-----
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking ----'
30. Buoyancy calculations for tank/pump chamber �----
31.Engineer to inspect and certify soils: wall: commercial: �--w
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee, installer signature _
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37.Check area lots fcir groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6/03/03