Loading...
HomeMy WebLinkAboutEngineered Plans - 2019LOCATION ffA.P Not to Scale Q S� LOCUS NANTUCKET SOUND ASSR'S. MAP 14, PARCEL 114 L.C.P. 14426G, LOT 59 TECHNICAL NOTES: 1. ALL COVERS AND INSPECTION/ACCESS PORTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED (OR SHALL BE BUILT TO GRADE AS REQUIRED BY OAKSON INC.) 2. COVERS BROUGHT TO FINAL GRADE SHALL BE SECURED TO PREVENT UNAUTHORIZED ACCESS. 3. ALL TANKS SHALL BE INSTALLED ON A LEVEL, STABLE BASE (MIN.6" STONE BASE) 4. MAINTAIN A MAXIMUM OF 36" COVER OVER ALL SYSTEM COMPONENTS. ALL COMPONENTS SHALL CONFORM TO SPECIFICATIONS CONTAINED IN 310 CMR 15.00. 5. NO GARBAGE GRINDER ALLOWED WITH THIS DESIGN. PROPOSED TOP OF FIRST FLOOR EL. = 12.2 INV EL GENERAL NOTES: 1. SYSTEM IS DESIGNED IN ACCORDANCE WITH "COMMONWEALTH OF MASS., DEPT. OF ENVIRONMENTAL PROTECTION, 310 CMR 15.00; THE STATE ENVIRONMENTAL CODE, TITLE 5: STANDARD REQUIREMENTS FOR THE SITING, CONSTRUCTION, INSPECTION, UPGRADE AND EXPANSION OF ON-SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS" AND THE TOWN OF YARMOUTH REGULATIONS. 2. NO WELLS OR WATER SUPPLIES ARE KNOWN TO EXIST WITHIN 100 FEET OF THE PROPOSED SOIL ABSORPTION SYSTEM. ALL WELLS KNOWN TO EXIST WITHIN 150 FT. OF THE SYSTEM ARE SHOWN. 3. PRIOR TO BACKFILLING COMPLETED SYSTEM, NOTIFY THE ENGINEER AND THE HEALTH DEPARTMENT FOR INSPECTION. PROVIDE 24 HOURS (MIN.) NOTICE. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATION. 5. ANY CHANGES TO THIS PLAN MUST BE APPROVED BY THE BOARD OF HEALTH. 6. AREA SERVED BY TOWN WATER. CONSTRUCTION NOTL'S: 1. LIMITS OF CONSTRUCTION AND/OR GRADING TO BE AS SHOWN ON PLAN AND SHALL BE VISIBLY MARKED, PRIOR TO, AND DURING CONSTRUCTION. 2. FABRIC SILTFENCE TO BE SECURELY STAKED IN PLACE PRIOR TO CONSTRUCTION AND SHALL REMAIN IN PLACE UNTIL DISTURBED AREAS HAVE BEEN REVEGETATED. J. DISTURBED AREAS SHALL BE STABILIZED AND REVEGETATED AS SOON AS PRAC77CABLE UPON COMPLETION OF GRADING. 4. ALL EXCESS EXCAVATED MATERIAL SHALL BE STOCKPILED OUTSIDE THE 100' BUFFER AND SHALL BE REMOVED FROM THE SITE UPON COMPLETION OF CONS7RUC770N. 5. GUTTERS AND DOWNSPOU7S CONNECTED TO DRYWELLS, OR CRUSHED STONE ® ROOF DRIPLINE, TO BE U77LIZED TO CONTAIN ROOF RUN-OFF. 6. PROPOSED DRIVEWAY SHALL BE CONSTRUCTED OF PERMEABLE MATERIAL. ANY ADD1770A14L WORK BEYOND THE SCOPE OF THAT WHICH IS SHOWN HEREON WILL REQUIRE CONSERVATION COMMISSION APPROVAL. TYPICAL ,SY,S"7 7Zff PROFILE' NOT TO SCALE M'DL4 SITU PLAN f"- 30' "M_ 19.24' Nq 11_ MOSS ROAD L=15.00' CUT & CAP , R=109.25' EXISTING, �'� A<Z 0 rn EXCAVATE FOR V AROUND ABSORPTION SYSTEM AS REQUIRED TO REMOVE ALL SOIL ABOVE THE (Cl TH2, C TH3) MEDIUM TO PROPOSED COARSE SAND LAYER. INSTALL 40 MIL POLYETHYLENE IMPERVIOUS CONTAINMENT WALL BREAKOUT BARRIER ALONG EDGE T.O. WALL EL. = 8.0 OF EXCAVATION (TOP OF BARRIER ELEV.= 7.22, BOTTOM OF BARRIER ELEV. = 3 22) 41.71 BACK FILL WITH MATERIALS MEETING �'1�ENT '0 y THE SPECIFICATIONS OF 310 CMR SOIL HORIZON } 132 3 o 15.255 (3) AND (6). NOTIFY TO WITHIN 6 IN. OE -. ENGINEER AND HEALTH `AGENT FOR 4.6-0.6 48 - 60 INSPECTION OF EXCAVATION PRIOR �,..•.;; " -, ` CEDAR { TO BACK FILLING. PROVIDE '":e'• ��: ' ----------- ; -0.4--1.4 10.5, 24-HOUR (MIN.) NOTICE FOR INSPECTION. - yah a TH 1 -4- -1.4 - -5.4 VERY :•" t' "" ! NOTE: AS PER D.E.P. CERTIFICATION BUOYANCY CALCULATIONS.• :. FOR GENERAL USE PERC-RITE DRIP :c4z=�pc VIEW 8 EASEMENT EDGE 0 �M 6BR POSED i WETLAND �, �. , /' / ?, F WELLING 1 / /'' /' ' s F E - 12.2 1 DECK - / 6' B LIMIT OF WORK/ FABRIC SILT FENCE / - - "JLot 59 23,909 S.F.--b ALTERNATIVE / 0.55 Ao.i• BENCHMARK � / TOP OF SURVEYOR'S SPIKE EL.= 4.85 (NAVD 1988) 00 62•p0 IX .N - EDGE OF WEJ•I,AND _ __ _ IL A) 19'+ 21 " DIA. COVER 21 " DIA. COVER COVER DEPTH (IN.) SOIL HORIZON B� 11 'f TO WITHIN 6 IN. TO WITHIN 6 IN. OE 12 - 17 4.6-0.6 48 - 60 OF FINISH GRADE 2'f OF FINISH GRADE 0.6--0.4 60 - 72 Bb 10' MIN. -0.4--1.4 72 - 120 C MEDIUM TO I COARSE SAND -1.4 - -5.4 VERY -2.4 - -5.7 AT ELEVATION = 7.12 BUOYANCY CALCULATIONS.• LEACH FIELD TO BE PUMPED DRY I EXISTING c AND REMOVED, ALONG :WITH ANY FND DWELLING 5.50 SEPARATION TO BE 1500 -GAL SEPTIC TANK ° •' • • 4" CAST IRON • 4" REQUIRED). PROVIDE 6" TO HYDRAULIC I BUOYANCY FORCE OF DISPLACED WATER: 10.17' x 6.08' x 0' x 62.4 LB/CF = 0 LBS. UPWARD FORCE OR SCHEp.Ep P.V.C. DIA 1 50' FROM I I UNIT (SEE SHEET 2 WEIGHT OF TANK: 11,833 LBS. DOWNWARD FORCE 4. PIPE o 2 FLOW UNE �- v SCHED. 40 Pvc. D.E.P. CERTIFICATION FOR I I I I WEIGHT OF SOIL: BENCHMARK '• MONOLITHIC TANK •. i I I UNIT AND DRIP 10.17' x 6.08' x 0.75' x 110 LB/CF = 5.101 LBS. DOWNWARD FORCE - INV.EL. '''.<.. INV. EL. H 10 1500 3/15/2007, REVISED i I • • DISPERSAL = 16,934 LBS. NET DOWNWARD FORCE 6.27 • ' 6.02 • I I DETAILS) 2000 -GAL PUMP CHAMBER GALLON CAPACITY • •• INV. EL. _GRADE ABOVE_',_ -,- BUOYANCY FORCE OF DISPLACED WATER: TUBING=7.75± SEPTIC TANK •' 12.83' x 6.83' x 0.22' x 62.4 LB/CF = 1,203 LBS. UPWARD FORCE. (WATER TIGHT RE/NF. CONC.) 5.98 • WEIGHT OF TANK: = 11,833 LBS. DOWNWARD FORCE ®PERC-RITE FIELD (PROP.) WEIGHT OF SOIL W- WATER SERVICE (PROP.) • 12.83' x 6.83' x 0.96' x 110 LB/CF = 9.254 LBS. DOWNWARD FORCE ALL TEES SHALL BE CAST SERVICE (PROP.) = 19,884 LBS. NET DOWNWARD FORCE TEST HOLE LOC477ON IRON OR SCHED.40 P.V.C. PROPOSED PUMP CHAMBER EMERGENCY STORAGE CAPACITY: PIPE. PROVIDE GAS BAFFLE 2000 -GAL H10 MONO PUMP CHAMBER AND EFFLUENT FILTER ON 2000 -GAL H10 MONOLITHIC PUMP CHAMBER 48"-16"-16"=16" OUTLET TEE. SHALL BE UTILIZED. INSTALL ON A LEVEL, 16"x41 7GAL/INCH=667 GAL TLS'T _DATA DATE OF TEST HOLES: 4/17/2019 NO WATER ENCOUNTERED INSP. BY: D. QUINN (R&W), AMY VONHONE (HEALTH DEPT) GROUND WATER ENCOUNTERED AT 50" STABLE BASE. (MIN. 6" STONE BASE) 660 GAL REQUIRED; 667 GAL PROVIDED (SEE SHT 2 FOR FLOAT DETAILS) DESIGN GROUND WATER ELEVATION PER YARMOUTH HEALTH DEPARTMENT FOR THIS PROJECT AREA IS ELEVATION 2.5 NGVD29 WHICH BY VERTCON CONVERSION EQUALS 1.62 NAVD88. No.2 DEPTH SOIL SOIL ELEVATION (IN.) HORIZON TEXTURE (FT.) No.1 FILL DEPTH (IN.) SOIL HORIZON SOIL TEXTURE ELEVATION (FT.) 0-48 FILL 12 - 17 4.6-0.6 48 - 60 Ab SANDY LOAM 0.6--0.4 60 - 72 Bb SANDY LOAM -0.4--1.4 72 - 120 C MEDIUM TO I COARSE SAND -1.4 - -5.4 GROUND WATER ENCOUNTERED AT 50" STABLE BASE. (MIN. 6" STONE BASE) 660 GAL REQUIRED; 667 GAL PROVIDED (SEE SHT 2 FOR FLOAT DETAILS) DESIGN GROUND WATER ELEVATION PER YARMOUTH HEALTH DEPARTMENT FOR THIS PROJECT AREA IS ELEVATION 2.5 NGVD29 WHICH BY VERTCON CONVERSION EQUALS 1.62 NAVD88. No.2 DEPTH SOIL SOIL ELEVATION (IN.) HORIZON TEXTURE (FT.) 0-8 FILL DEPTH (IN.) 4.3-3.6 8 - 12 E MEDIUM SAND 3.6-3.3 12 - 17 Ab LOAMY SAND 3.3-2.9 17 - 27 Bb LOAMY SAND 2.9-2.1 27 - 80 L"1 MEDIUM TO COARSE SAND 2.1--2.4 80 - 120 C2 VERY -2.4 - -5.7 GROUND WATER ENCOUNTERED AT 36" BOTTOM OF PERC AT 39" (<2MIN./IN.) GROUND WATER ENCOUNTERED AT 60" - ANDREW R GRAVER # 1351 S'�N1TAM -., I. %�( 712 51zo f •' ' ' :•-` DISPERSAL SYSTEM (3/15/2007, No. 3 5.OARAGE DEPTH (IN.) SOIL HORIZON SOIL TEXTURE ELEVATION (FT.) 0 - 12 A LOAMY SAND 6.0- 5.0 12 - 30 B LOAMY SAND 5.0-3.5 30 - 84 CMEDIUM TO 3.5--1.0 BOTTOM OF PERC AT 39" (<2MIN./IN.) GROUND WATER ENCOUNTERED AT 60" - ANDREW R GRAVER # 1351 S'�N1TAM -., I. %�( 712 51zo f •' ' ' :•-` DISPERSAL SYSTEM (3/15/2007, CONTAMINATED SOIL WITHIN 5' OF 5.OARAGE _ - THE PROPOSED SAS. REPLACE o OC704 I (SLAB � h REVISED 11/23/2016) SECTION IST, IY • ' ' ' • , ' # 19 THE SYSTEM DOES NOT OF PERC-RITE DRIP REQUIRE A FIVE FOOT OVER DIG AS •,. ` ' 'o ' INDICATED AT 310 CMR 15.255(5). '�-- EXISTING SEPTIC TANK, DBOX, & AT ELEVATION = 7.12 _ 5.8 LEACH FIELD TO BE PUMPED DRY I EXISTING J AND REMOVED, ALONG :WITH ANY 18'. LSCSF 1L ZONE AE AL (EL. 11 AL Fq ' -� CONTAMINATED SOIL WITHIN 5' OF (''-� _ - THE PROPOSED SAS. REPLACE o OC704 WITH CLEAN SAND. o INSTALL 500 LINEAR FEET SHED LB1,- --` OF PERC-RITE DRIP , DISPERSAL TUBING WITH 'o ' ' • 1.7' ON -CENTER SPACING AT ELEVATION = 7.12 _ 5.8 I EXISTING (G.W. 0 ELEV. 1.62; FND DWELLING 5.50 SEPARATION TO BE PROVIDED, 5' MIN. REMOVED REQUIRED). PROVIDE 6" _DA - - MINIMUM COVER OVER 1 50' FROM TUBING (ALLOWED BY EDGE OF D.E.P. CERTIFICATION FOR 1 WETLAND BENCHMARK GENERAL USE PERC-RITE i TOP OF DRIP DISPERSAL SYSTEM �. STONE BOUND 3/15/2007, REVISED EL.= 7.18 11/23/2016 SECTION IT, (NAVD 1988) #2) PROPOSED FINAL _GRADE ABOVE_',_ -,- TUBING=7.75± AL DRIP DISPERAL ®PERC-RITE FIELD (PROP.) W- WATER SERVICE (PROP.) rJ- UNDERGROUND UTILITY SERVICE (PROP.) TEST HOLE LOC477ON DESIGN DATA: --6-- D(ISTING CONTOUR -6- PROPOSED CONTOUR NUMBER OF BEDROOMS PROPOSED: 6 0 o O PMONO UMP CHAMBER ESTIMATED DAILY EFFLUENT 660 G.P.D. PERC-RITE HYDRUAUC UNIT TOTAL LEACHING AREA AS PROPOSED: 1500 -GAL. H10 MONO BOTTOM AREA: 902 S.F. SEP77C TANK LEACHING CAPACITY AS PROPOSED: (EFFLUENT LOADING RATE = 0.74 GPD/SF) BOTTOM: 900 x 0.74 = 667 G.P.D. Yarmouth Health Department TOTAL = 66% G.P.D. R : N' �',TD [ Nme Bate PROPOSET I XffLLING �c ON -,SITS' S'�'l1'14G.L' TRFAT.ILIL'NT ND .DISPOSAL S,ST�'111 Prepared for.- Derek JoAnson Location: 37 .dloss Road, Yarmouth, .11114 Ryder & Filcox, Inc., P..E: & P.L.S. 3 Gidd iah Bill Rd. P. O. Box 439 Scale.• 1"=30' So. Orleans, ff.4., 0,250,2 Drawn by AMG' Tel. (508) e55--831,2 Bate -- 5/3%2019 Of '� Fax. (508) ,e40-,2305 F_ z 2 r_ ' 491�0 Q GENERAL CONSTRUCTION NOTES: 1. The system shall not be installed in wet or frozen soils. 2. Do not park, drive large equipment, or store materials on the dispersal area. No activity should occur on the dispersal area other than the minimum required to install the system. 3. All installation and construction techniques shall conform to the state and local codes pertaining to on-site wastewater systems and the permit for the site. 4. If site conditions are determined to require the installation of the system to deviate from the design plans, all work shall stop immediately and the designer and inspector shall be notified. Any ongoing work shall be the sole responsibility of the contractor. S. Drip tubing may be installed with a vibratory plow, a static plow, a narrow trencher (< 6" Wide), by hand trenching, or by scarifying the surface and bedding the drip tubing in clean sand meeting the requirements for fill material in the state code. For sand fill systems, cover consisting of 2" of the same sand and then topsoil meeting the approved depth requirement shall be provided. 6. All drip tubing is to be installed parallel to the contour. 7. Air release valves shall be placed below the ground surface in an insulated valve box but at an elevation above the highest drip line in that particular zone. 8. Vegetative cover must be replaced for installations where it is removed or buried during installation. 9. All cutting of rigid pvc pipe, flexible pvc, and drip tubing of size 2" or smaller shall be accomplished with pipe cutters. No sawing is allowed. 10. All rigid PVC pipe, flexible PVC pipe and drip tubing shall have the ends covered with duct tape after cutting to prevent construction debris from entering the pipe. 11. Prior to gluing, all joints shall be inspected for and cleared of any debris. All joints shall be cleaned and primed with pvc primer prior to being glued. 12. All PVC pipe and fittings shall be sch 40. 13. Whenever possible, all force mains shall be tested for leaks prior to being back- filled by pressurizing the system and observing for leakage. 14. The hydraulic unit shall be placed on top of the septic/treatment tank, pump chamber, or on a bed of 4" - 6" thick 3/4" gravel in a location within 30' of the pump. 15. If standing water is a problem in the vicinity of the hydraulic unit, a screened drain to daylight is required. 16. Electrician to provide separate circuits for the pump and controls/alarm, or as required by state and local codes. 17. All conduit entering the control panel shall be sealed at both ends to prevent condensation or gases inside the panel. COLD CLIMATE NOTES: 1. All attempts should be made to place the hydraulic unit in a location with an open southern exposure for warming purposes. 2. All pipes entering and leaving the hydraulic unit shall elbow vertically down 90 degrees to a depth below the frost line prior to extending away from the unit horizontally. 3. The supply and return lines shall be installed below the frost line. When this is not possible, rigid foam insulation (min 1" thick) shall be placed over those pipes that are above the frost line. 4. The vertical sections of pipe that travel through the frost zone and Connect the supply and return lines to the manifolds shall be insulated sch 40 pvc pipe. Insulation shall consist of foam pipe wrap insulation and 1" rigid foam insulation strips made into a box. (see insulation detail) S. Foil wrap insulation shall be placed over the supply/return manifolds and loop connectors so that at least 1' of insulation extends each direction beyond the fittings. (see insulation detail) 6. Air release valve enclosures shall be insulated with bagged Styrofoam peanuts, foil wrap insulation, and rigid foam insulation inside the lid. (see insulation detail) 7. All loops connecting drip runs shall be slightly elevated (minimum 1" - 2") so that they drain into the drip tubing after the pump shuts off. It is the contractor's responsibility to ensure that these loops stay elevated during and after the loops are backfilled. 8. Dense vegetative cover is to be established over the supply trench, return trench, manifolds, and drip tubing prior to the first exposure to freezing temperatures. If vegetation cannot be established then the entire drip dispersal field is to be covered with a thick layer (minimum 6") of mulch, straw/hay, or frost blanket until such turf cover is established. 9. Vegetation height over the drip dispersal area should be a minimum of 4" - 6" throughout the winter months. NOTE: THE DRIP TUBING SHALL BE THE LOWEST POINT TO ALLOW FOR DRAINAGE FROM BOTH THE VERTICAL NSULA NOTES: 1. ALL RIGID AND FLEXIBLE PVC ARE TO BE LOCATED ABOVE THE DRIP LINE TO ALLOW THE PIPES TO DRAIN. 2. THE AIR RELEASE VALVES SHALL BE PLACED AT THE HIGHEST POINT ON THE SUPPLY AND RETURN LINE FOR EACH ZONE. 3. EACH ZONE TO HAVE TWO AIR RELEASE VALVES. 4. RETURN LINES TO BE CONNECTED TO A COMMON RETURN LINE. VALVE BOX WITH 1/2" MIN RIGID FOAM INSULATION INSERTED UNDER COVER AIR RELEASE ( CHECK VALVE VALVES NEEDED FOR MULTIPLE ZONE SYSTEM ONLY RETURN MANIFOLD SUPPLY MANIFOLD ^�\\ �- RETURN 1" RETURN 1" SUPPLY \ �D JRN (Tn') 1/2" SUPPLY TYPICAL MANIFOLD CONNECTION (NOT TO SCALE) SUPPLY VALVE BACKFLUSH VALVE FLOW FLOW Cool Guide Patent No. 6,262,689 PERC-RITE HYDRAULIC UNIT (15 GPM) (NOT TO SCALE) 11/2" SUPPLY FROM PUMP CHAMBER FLOWMETER ,r- DISC FILTERS NOTE: ALL DRIP LOOPS ARE TO BE LOCATED 2" ABOVE THE DRIP LINE TO ALLOW FOR THE LOOPS TO DRAIN. 1" MIN. Emt RADIUS RAM INSERT 12 ADAPTER (TYP) PVC FIP 1/2" FLEX PVC ADAPTER TUBING 4' LENGTH DRIP OW) DRIP TUBING LOOP TYPICAL DRIP LOOP CONNECTION (NOT TO SCALE) PVC PRIMED TREADED CONNECTION WITH AND GLUED TEFLON TAPE . FLEX PIPE DRIP TUBING ADAPTER FITTING BARBED RAM PVC FIP INSERT FITTING CONNECTIONING DRIP TUBING TO FLEXIBLE PVC PIPE FIELD FLUSH VALVE 11/2" GRAVITY RETURN TO SEPTIC TANK (0.5%n MIN. SLOPE) '- 1" COMMON RETURN 1" ZONE SUPPLIES PERC-RITE HYDRAULIC UNIT (15 GPM) (NOT TO SCALE) D=THE DAILY DESIGN FLOW FOR THE SITE SCH 80 UNION NO WEEP HOLE /-GATE VALVE TO BE DRILLED COOLING COLLAR NOTE 1 I ( L 1-1/2" SCH 40 EXTENSION I i II COUPLING COLLAR (BY I10 ALARI OTHERS) I 1 D/2 I PVC COUPLING I PEAK INLETS INSERT (BY OTHERS) I D/2 0. DRIP I 00 0coo* oSEE INSERT 20� -TOFF �U's11�U=11 _ll a nzz•\ktz\r! 0 0 1 SCH 40 PVC i6' 11.11%11=11%11%Y' i�11.11.1\.11.YY" COOL GUIDE AND '11114 11=11�\1�11= °" OPTIONAL PUMP FLAT CAP ANCHOR BOLT r' 30' MAXIMUM DISTANCE THROUGH END CAP ION BOX SUPPLY LINE BELOW FROST OR FLUSH RETURN TO SEPTIC TANK. TYPICAL PUMP TANK & HYDRAULIC UNIT DETAIL (NOT TO SCALE) I TED SUPPLY AND RETURN PIPES FOIL WRAP INSULATION SHALL RETURN MANIFOLD SUPPLY MANIFOLD BE INSTALLED OVER TUBING 1/2' PIPING TO BE FERC -RITE E DRIP TUBING 1/2' PIPING TO BELOCATED (PER COLD CLIMATE NOTES) ABOVE DRIP = 1.62 NAVD 1988 LOCATED ABOVE DRIP TUBING TO ALLOW THE (CUSTOM CONFIGURATION) TUBING TO ALLOW THE+ ' PRESSURIZED r+ + MANIFOLD TO DRAIN + 4 MANIFOLD TO DRAIN u+++ + � + DRIP TUBING . + ++ + RIGID FOAM VERTICAL INSULATED +"+ +++ AIR RELEASE CONSIST OF 2" MIN CLEAN INSULATION RETURN PIPE (PER COLD CLIMATE + + ` ++ ++ + VALVES 14 RETURN LINES BE LOAM & SEED NOTES) r + FINISH GRADE + +++ + FINISH GRADE (ELEV. =7.75±) COLD CLIMATE NOTES) 3 MMIN COVER 1/2" PVC RIGID .r==' _' COMMON RETURN PIPE 1 D •: WALL OR BELOW FROST LINE GREEN VALVE BOX COVER 1" PVC ZONE SUPPLY PIPE EXISTING GRADE - • .. .. "` ' =` _SIF SPECIFIED) 1/2" PVC RIGID S' MIN . BELOW FROST LINE MAIN SUPPLY & .. SOIL HORIZONS A & B TO BE REMOVED AND REPLACED• COMMON RETURN TUBING 1/2" PVC FL FLEX LINES LOCATED -► BALL VALVE INSTALLATION DEPTH 6" MIN CHECK VALVE FOR MULTIPLE BELOW FROST LINE AS PER DESIGN ZONE SYSTEMS ONLY (PER COLD CLIMATE NOTES) FORCE MAIN INSTALLATION RETURN LOCATED INSULATION LAID FLBENEATH AP DEPTH TO BE BELOW THE FROST LINE BALL VALVE STANDARD DRIP SYSTEM (SIDE FEED MANIFOLD) TO ALLOW DRAINAGE (NOT TO SCALE) PERC-RITE FIELD INSTALLATION INSTRUCTIONS: DRIP TUBING: 500'Ile 1. Measure the distance from the bottom of the tank to 6" down from the top of the Note: All Pero -Rite components shalt be obtained _ riser. Cut the extension pipe (by others) to the length necessary to reach this ►� r i ; (j (; TUBING SPACING: 1:70 i height. Cut half of the pipe down 12" to 18" away from the top of the pipe for a Detail A pump discharge pipe and attach to riser. (see detail A) ALL LATERALS SLOPE 2. Glue the extension coupling (by others) to the extension pipe and to the Cool guide. 3. For reuse of existing concrete pump chambers: glue on the cool guide flat cap and 12"-18" pj place the cool guide firmly in the bottom of the tank. Attach the extension to the riser with the anchors as shown. 4. For use in new concrete pump chambers: anchor the flat cap to the bottom of the tank in the proper location to hold the cool guide and extension. The cap may or FLOAT TREE may not be glued to the device. Attach the extension with the anchors as shown. S. Place the pipe dope on the cool guide adapter threads and thread them into the pump discharge. 6. Attach cooling collar to adapter With set screw provided. CHECK VALVE 7. Glue pipe into flow collar and with pump attached, lower Into the guide tube. ADAPTER 8. Attach to discharge pipe, valves, and connect electrical and specified. ATTACH AS PER FLOW FLOW Cool Guide Patent No. 6,262,689 PERC-RITE HYDRAULIC UNIT (15 GPM) (NOT TO SCALE) 11/2" SUPPLY FROM PUMP CHAMBER FLOWMETER ,r- DISC FILTERS NOTE: ALL DRIP LOOPS ARE TO BE LOCATED 2" ABOVE THE DRIP LINE TO ALLOW FOR THE LOOPS TO DRAIN. 1" MIN. Emt RADIUS RAM INSERT 12 ADAPTER (TYP) PVC FIP 1/2" FLEX PVC ADAPTER TUBING 4' LENGTH DRIP OW) DRIP TUBING LOOP TYPICAL DRIP LOOP CONNECTION (NOT TO SCALE) PVC PRIMED TREADED CONNECTION WITH AND GLUED TEFLON TAPE . FLEX PIPE DRIP TUBING ADAPTER FITTING BARBED RAM PVC FIP INSERT FITTING CONNECTIONING DRIP TUBING TO FLEXIBLE PVC PIPE FIELD FLUSH VALVE 11/2" GRAVITY RETURN TO SEPTIC TANK (0.5%n MIN. SLOPE) '- 1" COMMON RETURN 1" ZONE SUPPLIES PERC-RITE HYDRAULIC UNIT (15 GPM) (NOT TO SCALE) D=THE DAILY DESIGN FLOW FOR THE SITE SCH 80 UNION NO WEEP HOLE /-GATE VALVE TO BE DRILLED COOLING COLLAR NOTE 1 I ( L 1-1/2" SCH 40 EXTENSION I i II COUPLING COLLAR (BY I10 ALARI OTHERS) I 1 D/2 I PVC COUPLING I PEAK INLETS INSERT (BY OTHERS) I D/2 0. DRIP I 00 0coo* oSEE INSERT 20� -TOFF �U's11�U=11 _ll a nzz•\ktz\r! 0 0 1 SCH 40 PVC i6' 11.11%11=11%11%Y' i�11.11.1\.11.YY" COOL GUIDE AND '11114 11=11�\1�11= °" OPTIONAL PUMP FLAT CAP ANCHOR BOLT r' 30' MAXIMUM DISTANCE THROUGH END CAP ION BOX SUPPLY LINE BELOW FROST OR FLUSH RETURN TO SEPTIC TANK. TYPICAL PUMP TANK & HYDRAULIC UNIT DETAIL (NOT TO SCALE) HOUSE HYDRAULIC UNIT FLUSH RETURN FROM HU BOTTOM OF TUBING ZONE SUPPLY ZONE 1 ELM = 7.12 SEPTIC TANK / 5.50' SEPARATION TREATMENT TANK PUMP COMMON RETURN (5' MIN. REQUIRED) CHAMBER **GROUND WATER ELEV 1/2" SUPPLY & RETURN MANIFOLD LOCATED ABOVE DRIP TUBING TO FERC -RITE E DRIP TUBING SUPPLY TO ALLOW MANIFOLDS TO DRAIN = 1.62 NAVD 1988 AIR RELEASE VALVES WITH (CUSTOM CONFIGURATION) COVERS TO GRADE HYDRAULIC UNIT DRIP TUBING COVER SHALL RIGID FOAM **DESIGN GROUND WATER ELEVATION PER CONSIST OF 2" MIN CLEAN INSULATION fERTICAL SUPPLY & SAND AND REMAINDER TO RETURN LINES BE LOAM & SEED PROJECT AREA IS ELEVATION 2.5 NGVD29 INSULATED (PER FINISH GRADE (ELEV. =7.75±) COLD CLIMATE NOTES) 3 MMIN COVER _ BOULDER _' RETAINING 1 D •: WALL OR GREEN VALVE BOX COVER EQUAL EXISTING GRADE - • .. .. "` ' =` _SIF SPECIFIED) AT FINISHED GRADE S' MIN . MAIN SUPPLY & .. SOIL HORIZONS A & B TO BE REMOVED AND REPLACED• COMMON RETURN WITH CLEAN SAND MEETING THE REQUIREMENTS FOR . SCALE 1"=20 LINES LOCATED -► FILL MATERIAL IN THE STATE CODE MANIFOLDS AND LATERALS 2'X 2! BELOW FROST LINE 1/2" PVC FLEX (PER COLD CLIMATE NOTES) -. ESHWT RETURN LOCATED INSULATION LAID FLBENEATH AP ABOVE DRIP TUBING TO ALLOW DRAINAGE PERC-RITE FIELD DRIP TUBING: 500'Ile (NOT TO SCALE) Note: All Pero -Rite components shalt be obtained _ from Oakson, Inc, Gloucester, MA., 978-282-1322 PERC-RITE DRIP TUSING HOUSE HYDRAULIC UNIT FLUSH RETURN FROM HU BOTTOM OF TUBING ZONE SUPPLY ZONE 1 ELM = 7.12 SEPTIC TANK / 5.50' SEPARATION TREATMENT TANK PUMP COMMON RETURN (5' MIN. REQUIRED) CHAMBER **GROUND WATER ELEV !It;?Ii TUBING DEPTH: 0.5' TOP VIEW i.£ SUPPLY AIR RELEASE RIGID FOAM INSULATION /.: it VALVES VALVE BOX INSERTED MANIFOLDS BENAND LATERALS 19.4' THROUGH 7" HOLE IN EATH FOIL WRAP FOIL WRAP INSULATION INSULATION AIR RELEASE RETURN VALVE (TYPICAL) �� �+ alp ' FINISHED GRADE LINES RIGID FOAM INSULATION 6" GRAVEL PUMP DISCHARGE TO HU HYDRAULIC UNIT HU CONTROL UNIT PANEL MOUNTED IN AN EXTERNALLY ACESSIBLE LOCATION BY FOIL WRAP INSULATION SHALL BE -. INSTALLED AROUND VALVE BOX & ABOVE MANIFOLDS AND LATERALS (PER COLD CLIMATE NOTES) CLEAN 1/4" - 1/2" CRUSHED STONE - FLEXIBLE FOAM OR RUBBER PIPE WRAP INSULATION AROUND VERTICAL PIPES RIGID INSULATION BOX AROUND VERTICAL PIPES STYROFOAM PEANUTS � ( IN BAG SUPPLY AND RETURN LINES BELOW FROST ZONE (TYP 4'). INSULATE LINES WITH RIGID FOAM BOARD WHEN PROPER FROST DEPTH CANNOT BE ACHIEVED. CROSS SECTION INSULATION DETAIL (NOT TO SCALE) 1A ERTICAL PIPE TO BE L::INSULATED 8'OF STATIC LIFT TO HU (MAX) PROPOS'E'D .D# LLING & OAT -SITZ �- FLUSH RETURN.S'L'lY�1G�' TR'FAT IE'NT �4ND DI,SPO,SAL SY,STL�"til -y-- ZONE 1 SUPPLY -+► ZONE 2 SUPPLY Prepared for.- .Derek Johnson DRIP ENABLE FLOAT ELEVATION �SNOFgf,4 location: 37 floss Road, Yarmouth, A4 C ANDREW� Ryder & #ilcox, Inc., P. F do P. L. S. P N 3 G'iddiah Hill Rd. GROVER P.O. Box 439 Date - 5/30/2013 # 1351 So. Orleans, ...1., 02662 qN TAa Pio Tel. (508) 255-8312 Sjit. .2 of ,2 Fax. (508 240-2306 In Job No. 1,2183 SUPPLY TO = 1.62 NAVD 1988 HYDRAULIC UNIT **DESIGN GROUND WATER ELEVATION PER YARMOUTH HEALTH DEPARTMENT FOR THIS TYPICAL SYSTEM HYDRAULIC PROFILE PROJECT AREA IS ELEVATION 2.5 NGVD29 WHICH BY VERTCON CONVERSION EQUALS (NOT TO SCALE) 1.62 NAVD88. GREEN VALVE BOX COVER VALVE BOX INSERTED ZONE DETAIL AT FINISHED GRADE THROUGH 7" HOLE IN FOIL WRAP INSULATION (�i ; t •M , , , SCALE 1"=20 FOIL WRAP INSULATION SHALL BE -INSTALLED OVER TUBING- MANIFOLDS AND LATERALS 2'X 2! (PER COLD CLIMATE NOTES) INSULATION LAID FLBENEATH AP TOTAL LINEAR FEET OF DRIP TUBING: 500'Ile _ ►� r i ; (j (; TUBING SPACING: 1:70 i RIGID INSULATION BOX AROUND VERTICAL PIPES ALL LATERALS SLOPE I I N N O.C. DOWNILL TO DRIP TUBING FOR SELF DRAINAGE pj !It;?Ii TUBING DEPTH: 0.5' TOP VIEW i.£ SUPPLY AIR RELEASE RIGID FOAM INSULATION /.: it VALVES VALVE BOX INSERTED MANIFOLDS BENAND LATERALS 19.4' THROUGH 7" HOLE IN EATH FOIL WRAP FOIL WRAP INSULATION INSULATION AIR RELEASE RETURN VALVE (TYPICAL) �� �+ alp ' FINISHED GRADE LINES RIGID FOAM INSULATION 6" GRAVEL PUMP DISCHARGE TO HU HYDRAULIC UNIT HU CONTROL UNIT PANEL MOUNTED IN AN EXTERNALLY ACESSIBLE LOCATION BY FOIL WRAP INSULATION SHALL BE -. INSTALLED AROUND VALVE BOX & ABOVE MANIFOLDS AND LATERALS (PER COLD CLIMATE NOTES) CLEAN 1/4" - 1/2" CRUSHED STONE - FLEXIBLE FOAM OR RUBBER PIPE WRAP INSULATION AROUND VERTICAL PIPES RIGID INSULATION BOX AROUND VERTICAL PIPES STYROFOAM PEANUTS � ( IN BAG SUPPLY AND RETURN LINES BELOW FROST ZONE (TYP 4'). INSULATE LINES WITH RIGID FOAM BOARD WHEN PROPER FROST DEPTH CANNOT BE ACHIEVED. CROSS SECTION INSULATION DETAIL (NOT TO SCALE) 1A ERTICAL PIPE TO BE L::INSULATED 8'OF STATIC LIFT TO HU (MAX) PROPOS'E'D .D# LLING & OAT -SITZ �- FLUSH RETURN.S'L'lY�1G�' TR'FAT IE'NT �4ND DI,SPO,SAL SY,STL�"til -y-- ZONE 1 SUPPLY -+► ZONE 2 SUPPLY Prepared for.- .Derek Johnson DRIP ENABLE FLOAT ELEVATION �SNOFgf,4 location: 37 floss Road, Yarmouth, A4 C ANDREW� Ryder & #ilcox, Inc., P. F do P. L. S. P N 3 G'iddiah Hill Rd. GROVER P.O. Box 439 Date - 5/30/2013 # 1351 So. Orleans, ...1., 02662 qN TAa Pio Tel. (508) 255-8312 Sjit. .2 of ,2 Fax. (508 240-2306 In Job No. 1,2183