Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH 2 SEWAGE PLAN REVIEW CHECKLIST ,, r Location: A.M. Lot /1,72.- Zone of Contribution: In_t011t.= Acreage Commercial: Residential: L-.---- Street: --Street: 07 *, /li /r .67 ' ' /(l Village: /? Floor Plan: (� #Bedrooms: / 7 Owner: $4/`P Installer: 7 Address: a ♦ if Phone: / Phone: - 7 -1 +/.' -. C't,'Z'�' `` -r 57,.; / *' ' 74'7 Builder: /4?'�� (0141 Engineer: .._..1,14. 0 /'< // Address: !� Phone: Wp-- t --�j i/ 7,- Phone: Phone: 5 di)" - 7 (.� -fre7-#1 7i COL-:??aa (), N/A _YES NO 1.Required# of copies received 2. Date of soils exam and percolation test older than 2years ( f -� Q ( � f �� ' 1G� 3. 4-5 ft of naturally occurring pervious material, above water table c_�- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: (...----- 5.Water line 10 ft from septic components Var.: t..------ 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L..- 9.Leaching minimum 100 ft from wetlands Var.: -_-�" � 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: tC__.--F' 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: --- 13.Uses adjustment for maximum high groundwater; --V�---- ,,J� 14. Leaching set 4-5 ft above adj.water or botto9a4 test hole' Yar.: (. 15. System not in top or subsoil(A,B horizons) ' remo 16.Proposed contours are suitable - 17. System meets slope requirements-min. 1/8", ' "preferred l._._/ 18. System meets breakout requirements PVC liner: Wall: �.-- 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal _---- 22. i22. System adequately sized for its intended use \. 23.Minimum 6" stone or compacted below tank and dbox c -- ' 24.Manhole covers within 6"of grade, pump chamber cover to grade l 25.Inspection port on plastic chambers/leach field - 26.Electrical permit for pump chamber/Separate meter for duplexes ..----- 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ,--- 28. Septic tank/pump chamber to be factory waterproofed �-- '. 29.Vent provided if leaching below 3 feet, under driveway/parking -''-'- 30.Buoyancy calculations for tank/pump chamber %''� 31. Engineer to inspect and certify soils: wall: commercial: '''''..-- 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater _.----,, 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house '' 36.Deed Restriction required max. #bedrooms: max. flow: gpd --'" 37. Check area lots for groundwater/Label groundwater in Assessor's Map e, Plan reviewed by: fZ i 6/03/03