HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
- // SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Y 0 Lot _2/3Zone of Contribution: In Out"Acreage
•
Commercial: Residential:
Street (D/� 1 �� ,''� /
Village: di/ Floor Plan: ✓ #Bedrooms:
Owner: /'U(1/ '/67� Installer: t/ 4 j
�f
Address: C�GG� Phone: 5 - 7 -- 9 ,7-y
Phone:
Builder: Engineer: 4i��G1
Address: Phone: 0 - -- ,/
Phone: --1 iy,"� 7G E j=d.
N/A YES NO _
1.Required#of copies received (/
2. Date of soils exam and percolation test not older than 2 years (...----
3.4-5 ft of naturally occurring pervious material, above water table d,�-
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: c_......-----
5. Water line 10 ft from septic components Var.: �_-----
6.Benchmark indicated and shown-NGVD if near wetlands t/=
7. Septic tank minimum 10 ft from foundation, deck Var.: L _ -----.
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t...-------
9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: ��
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.: s:.----
14.
✓14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: ,..----
15. System not in top or subsoil(A,B horizons)or 5' removal �.-----
16.Proposed contours are suitable L�
17. System meets slope requirements-min. 1/8", 1/4"preferred L.-----
18. System meets breakout requirements PVC liner: Wall: Lam•
19. Specified tee sizes are proper, gas baffle on outlet tee ‘.......--
20.
.120. Sewage is under 10,000 gpd for parcel
21.No garbage disposal L----v
22. System adequately sized for its intended use L__..
-23.Minimum 6"stone or compacted below tank and dbox L�
24.Manhole covers within 6"of grade,pump chamber cover to grade L_,�
25.Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes `-----'
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size -------#
28. Septic tank/pump chamber to be factory waterproofed -S
29.Vent provided if leaching below 3 feet,under driveway/parking --- '
30.Buoyancy calculations for tank/pump chamber �/`
31.Engineer to inspect and certify soils: wall: commercial: `..--
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature �/'
33.H-20 loading is subject to vehicular traffic, groundwater �-=---A•
34. Title V Application and permit fee, installer signature - _ �---
35.Foundation footing min. 2 feet above adjusted ground water for new house -�
36.Deed Restriction required max. #bedrooms: max.flow: gpd -�
__/-
37.Check area lots for groundwater/Label groundwater in Assessor's M. •
Plan reviewed by: A 6/03/03