Loading...
HomeMy WebLinkAboutReview Checklist ' TOWN OF YARMOUTH c� t SEWAGE PLAN REVIEW CHECKLIST Location: AM 7c? LOT;27 C Date of Subdivision Approval Street / C 7 c f'1 Zone of Contribution: In '7' Out Village she . Commercial Residential ,0 Owner: ,o44ri S 4 Installer - ' ..S rp ?6 X755- Builder: Engineer0-' . 't'- 3f _ N/A YES NO 1. Required number of copies received. i 2. Date of soils exam and percolation test not older than 2 years. t� 3. 4 feet of naturally occurring pervious material, above water table(new construction) ,Z 4. Foundation 2 feet above high point_of fronting road for new construction. ,� 5. Water availability letter from Water Department for new construction. it 6. Benchmark indicated and shown-NGVD if near wetlands. / ` 7. Building sewer does not exit center of house. ` 8. Septic tank a minimum of 10 feet from house and deck. ✓ 9. Leaching a minimum of 20 feet from house and 10 feet from deck. ' v4' t--_ 1V; 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. '✓ 13. Uses adjustment for maximum high groundwater. i/ 14•. Leaching 4 -5 feet above adjusted water table or bottom of test pit. L 15. System not in top or subsoil or 5 foot removal. 16. Proposed contours are suitable. ,.. - 17. System meets slope requirements- min. 1/8". 1/4" preferred. t/ 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. • 19. Specified tee sizes are proper. gas baffle on outlet tee. 1/ 20. Sewage flow under 10.000 gpd for parcel. V/ 21. No garbage disposal. V '22. System adequately sized for its intended use. t� 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. t/ 26. Pump system- 2" line. weep hole, check valve, sanitary in d-box. alarm on separate circuit. 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule V c commercial system 30. Engineer and Land Surveyor stamp and signature. 31. H2O loading when system subject to vehicular traffic. L_/ 32. Title V application and fee signed by a licensed installer. t/ • 33. Foundation footing feet above adjusted water table 34. Lot subdivided prior to July 31. 1986 - Nitrate Loading, (� 35. Subdivided prior to April 7, 1989 - Phosphorus Zone 300'. ./ Plan reviewed by: