Loading...
Dock violation email Grant, Kelly From:Sarah Ojala - Down Cape Engineering, Inc. <sojala@downcape.com> Sent:Tuesday, August 20, 2019 12:31 PM To:Grant, Kelly Cc:Dan DCE Subject:RE: Gatto, 28 Aunt Edith's, SY Hi, If we have to file with Waterways Committee and obtain a shellfish survey, then I would expect we would be at least 3 months out….we have run into cancelled Waterways Committee meetings quite often in the past…so I am a little nervous giving a timeline… So I am thinking we can aim for filing in November? And… thank you! Looking forward to getting away…. Sarah From: Grant, Kelly <KGrant@yarmouth.ma.us> Sent: Tuesday, August 20, 2019 12:05 PM To: 'Sarah Ojala - Down Cape Engineering, Inc.' <sojala@downcape.com> Subject: RE: Gatto, 28 Aunt Edith's, SY Hi Sarah That’s fine, just provide me with a reasonable timeline you are working to and I will update the notes this end. Thanks Kelly Grant Conservation Administrator Town of Yarmouth 508-398-2231 Ext 1288 kgrant@yarmouth.ma.us From: Sarah Ojala - Down Cape Engineering, Inc. \[mailto:sojala@downcape.com\] Sent: Tuesday, August 20, 2019 11:22 AM To: Grant, Kelly <KGrant@yarmouth.ma.us> Subject: Gatto, 28 Aunt Edith's, SY Attention! This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. 1 Hi Kelly, We are in the process of providing Steve Gatto a quote to do a pier re-design and licensing. thth There was a comment (not sure by whom at this point) about filing by the 5 for the hearing on the 19….which I don’t see how that can work since I will be on vacation for 2 weeks…. Also, wouldn’t we need an approval from Waterways first before going before the Commission? Wouldn’t we need to do a shellfish survey as well? Thank you for your help on this! Sarah B. Ojala Down Cape Engineering, Inc. 939 Rte 6A, Ste C Yarmouth Port MA 02675 508-362-4541 X110 sojala@downcape.com 2