Loading...
HomeMy WebLinkAboutReview Checklist ,' TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST %-------- Location: A.M. / 3 Lot Zone of Contribution: In Out Acreages 1 /,1.4/- 4 1----/ -• Commercial: Residential: Street: 7.--- ---- 1 Village: (/ /74- Floor Plan: L --- #Bedrooms: -- Owner: ajaie41469 7.14(/,�' Installer: 7 Address: ��" Phone: Phone: Builder: Engineer: ! , /moi , Address: Phone: . /' � 6 ) i Phone: t/� � •'/e 1 014r02Aae-,1 N/A YNO 1.Required#of copies received v 2.Date of soils exam and percolation test not older than 2 years (/ 3.4-5 ft of naturally occurring pervious material,above water table [.----^ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: L1 5. Water line 10 ft from septic components Var.: �o> 6.Benchmark indicated and shown-NGVD if near wetlands [----' 7. Septic tank minimum 10 ft from foundation, deck Var.: �„--, 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ` -, 9.Leaching minimum 100 ft from wetlands Var.: (.___-. 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: .------ 11. Tank/leaching minimum 10 ft from property line Var.: `--. 12. System meets all other setback requirements Var.: L._.-, 13. Uses adjustment for maximum high groundwater Var.: ‘....---- 14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: / (� ) c.� 15. System not in top or subsoil(A,B horizons)or 5'removal /,...---• 16.Proposed contours are suitable LSO 17. System meets slope requirements-min. 1/8", '/4"preferred �- 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee L------ 20. Sewage is under 10,000 gpd for parcel �.. 21.No garbage disposal �---• 22. System adequately sized for its intended use L_.-. 23.Minimum 6"stone or compacted below tank and dbox C----- 24.Manhole covers within 6"of grade,pump chamber cover to grade �� 25.Inspection port on plastic chambers/leach field - 26.Electrical permit for pump chamber/Separate meter for duplexes �- ii,------.27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size - 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking .----- 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature .✓ 33.H-20 loading is subject to vehicular traffic, groundwater c.------- 34. Title V Application and permit fee, installer signature 35.Foundation footing min.2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd - 37. Check area lots for groundwater/Label groundwater in Assessor's Map j- Plan reviewed by: 6/03/03