Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutReview Checklist 7- -(9 TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. /2 Lot 5, Zone of Contribution: In Out VAcreage
S ,� - Commercial: Residential:
Street: 2( 6111)1'� 1$/�'v�� ��.
Village: #-z! Floor Plan: #Bedrooms: 3
Owner: JtVitlif z��'/ [ S(cW,1? Installer: AS
Address: Phone: COV-Se) -6.2- 7
Phone:
l1AddBuilder: Engineer: 1)4-145-
ress: Phone: ' qi)-e
1 - ,S `
Phone:
N/A YES NO
1.Required#of copies received L/
2.Date of soils exam and percolation test not older than 2 years k.-----
3.4-5
.-----3.4-5 ft of naturally occurring pervious material,above water table C1
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: c _-'
5.Water line 10 ft from septic components Vat: C1
6.Benchmark indicated and shown-NGVD if near wetlands L----'
7. Septic tank minimum 10 ft from foundation, deck Var.: c.-------
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L.----
9.
19.Leaching minimum 100 ft from wetlands Var.: �-•--
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: -
12. System meets all other setback requirements Var.: 4,--
13.Uses adjustment for maximum high groundwater Var.: ..-..----
14.
�14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
Cbz-'15.
System not in top or subsoil(A,B horizons)or 5'removal ''��++
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 1 "preferred L------
18.
118. System meets breakout requirements PVC liner: Wall: ��
19. Specified tee sizes are proper, gas baffle on outlet tee tys
20. Sewage is under 10,000 gpd for parcel C---•
21.No garbage disposal L1
22.System adequately sized for its intended use (�
• 23.Minimum 6"stone or compacted below tank and dbox (/
24.Manhole covers within 6"of grade,pump chamber cover to grade (/
25.Inspection port on plastic chambers/leach field C1
26.Electrical permit for pump chamber/Separate meter for duplexes �--.
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size k.....----
28.
.128.Septic tank/pump chamber to be factory waterproofed t-----**
29.Vent provided if leaching below 3 feet,under driveway/parking �1
30.Buoyancy calculations for tank/pump chamber L1
31.Engineer to inspect and certify soils: wall: commercial: ✓
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature _..---•"#
33.H-20 loading is subject to vehicular traffic, groundwater �...----•
34.Title V Application and permit fee, installer signature --•---"
35.Foundation footing min.2 feet above adjusted ground water for new house - -----*
36.Deed Restriction required max. #bedrooms: max. flow: gpd .--- --
37.Check area lots for groundwater/Label groundwater in Assessor's Map '"'"--
Plan reviewed by: 6/03/03