HomeMy WebLinkAbout2019 Jul 31 - Email to Engineer vonHone, Amy
From: vonHone,Amy
Sent: Wednesday,July 31, 2019 3:54 PM
To: 'Craig J. Ferrari, EIT'; 'dgonsalves@downcape.com'
Subject: 24 Center Street,Yarmouth
Hi Guys-
I reviewed this plan and think the leach needs to be dropped 0.6' in order to avoid a removal since the B horizon was not
perced. The other option would be for the engineer to confirm at time of installation and perc the B layer then. You can
leave the plans as is and I can add a note to the Title 5 permit stating engineer to confirm soils at time of installation.
Let me know what you want to do.
Thanks,Amy
Amy L.von Hone,R.S.,C.H.O.
Assistant Health Director
Yarmouth Health Department
1146 Route 28
South Yarmouth, MA 02664
(W)508.398.2231 X1240
(F) 508.760.3472
avonhone@yarmouth.ma.us