Loading...
HomeMy WebLinkAboutUse & Occupancy Unit 5 •Ygit TOWN OF YARMOUTH Building Department CERTIFICATE OF (508) 398-2231 ext.1261 OCCUPANCY pL. ' y PERMIT NO BLD-19-006165 ERIC STANLEY ADDRESS: 572 ROUTE 28 Unit 5,WEST YARMOUTH, MA 02673 ZONING DISTRICT Bldg.Type: Commercial SUBDIVISION MAP BLOCK LOT 031.105 BUILDING IS TO BE Const. Type REMARKS Use&Occupancy—Yarn Shop—occupancy subject • all fin;I ins•- do 7 / CERTIFICATE OF INSPEC ION / DATE: 4,27)9 BUILDING OFFICIAL: �� `►. RICHARDS SUSAN J TRS BUILDING DEPT BY P. O. BOX 90 ESSEX, MA 01929 PHONE iIS PERMIT CONVEYS NO RIGHT TO OCCUPOY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR _RMANENTLY.ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JRISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF JBLIC WORKS. CERTIFICATE OF OCCUPANCY BUILDING INSPECTIONS APPROVALS FIRE: OTHER DATE: 6 46. 4, DATE: INSPECTOR: K,Q.fw,,„ INSPECTOR: ELECTRICAL BOARD OF HEALTH DATE: 6 /04 4 , DATE: h// 5 INSPECTOR: k INSPECTOR: PLUMBING/GAS FINAL BUILDING DATE: IQ1&C /9 DATE: ‘ it INSPECTOR: Le INSPECTOR: //' COMMUNITY DEVELOPMENT: DATE NAME Cipro, Linda From: Murphy, Bruce Sent: Wednesday,June 19, 2019 10:54 AM To: Cipro, Linda Subject: RE: 572 Route 28 Health Dept is all set for OP for the Yarn shop. Bruce From:Cipro, Linda Sent:Wednesday,June 19, 2019 10:02 AM To: Elliott, Ken<KElliott@yarmouth.ma.us>; Hall, Lee<lhall@yarmouth.ma.us>; Renaud, Philip <PRenaud@yarmouth.ma.us>; Murphy, Bruce<BMurphy@yarmouth.ma.us>; Inkley, Brad <binkley@yarmouth.ma.us>; Huck, Kevin<KHuck@yarmouth.ma.us>; Sawyer,Jon<jsawyer@yarmouth.ma.us>;Simonian, Philip <PSimonian@yarmouth.ma.us>;Smith, Scott<ssmith@yarmouth.ma.us> Subject:572 Route 28 Good Morning All, The Building Department is scheduled to conduct a final for occupancy inspection at 572 Route 28—Yarn Shop—on Wednesday 6/26/19 and would like for you to attend. The contact person is Ann and she can be reached at 774-212- 1635. Please call me regarding your inspection results. Thank you, Linda 1 .01.•1(44 TOWN OF YARMOUTH Building Department BUILDING C (508)398-2231 ext.1261 4 six:-.„Ir o ,,.41, PERMIT NO BLD-19-006165 PERMIT ISSUE DATE 05/13/2019 JOB WEATHER CARD APPLICANT Ann Kaprielian PERMIT TO AT(LOCATION) 572 ROUTE 28 WEST YARMOUTH, MA 02673 ZONING DISTRICT B2 Bldg.Type: Commercial SUBDIVISION MAP BLOCK LOT 031.105 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS Use&Occupancy-Yam Shop-occupancy subject to all final inspections CONTRACTOR (774-212-1635) LICENSE • AREA(SQ FT) 1,100,543,40 EST COST($) 0.00 PERMIT FEE($) 60.00 OWNER RICHARDS SUSAN J TRS BUILDING DEPT BY ADDRESS RICHARDS PAUL K JR, P O BOX_90 R - n ESSEX MA 01929-0002 G GJJi /1 //2m- 'PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEW OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3) FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS ato- wct 614q e zc,-i9 FrR DG. PT OK 22‹. OTHER: WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPPECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARM/F