Loading...
HomeMy WebLinkAbout033.158_47 Holly LaneEngineering / Surveying Division NEW ADDITION Building Permit Review Work Sheet Address: ________47 Holly Lane_______________________________________ Assessors Map & Parcel: __________________________________________________ Assessors Plan #: _________________________________________________________ Plan Type: ______________________________________________________________ Recording Date: __________________________________________________________ Planning Board #: ________________________________________________________ Endorsement Date: _______________________________________________________ Planning Board Release Date: ______________________________________________ Subdivisions Only & Post - February 14, 1950 --------------------------------------------------------------------------------------------------------------------------------------------------------- Copy and cut along line and attach top portion to Engineering Review Sign Off Sheet ___X____ Street number within range of E911 listing ____N/A___ Easements (Public and Private) shown __X____ Stamp and signatures of Land Surveyor and Engineer or Sanitarian Reviewed By: _____________________________ Date: _______________ ____X___ Drainage (contours)- no contours shown; GIS appears flay __X_____ Established high groundwater vs. basement floor ________ Cellar Floor Elevation ________ Calculated High Ground Water Elevation. ________ ∆ No basement; footings. ___N/A____ Known drainage and/or ground water problem ___X____ Gutters to drywells required; and away from septic system; 3 proposed Reviewed By: __Amanda Ruggiero_______________ Date: _____7/16/2019_____ Comments: _____New addition; discrepancy between profile of septic tank (noted as 2000 gallon and the plan which is noted as 1500 gallon tank) ________________________________________________________ _