HomeMy WebLinkAboutEngineered Plan - 2019GENERAL NOTE5 SOIL TEST LOG5:
TEST HOLE I: EL= 19.9±
A.) NEITHER DRIVE WAYS NOR PARKING AREAS ARE ALLOWED OVER 5EPTIC 5Y5TEM
UNLE55 H-20 COMPONENTS ARE USED.
B.) THE DESIGNER WILL NOT BE RE5PON5113LE FOR THE 5Y5TEM A5 DESIGNED UN-
LE55 CON5TRUGTED A5 SHOWN. ANY CHANGE5 SHALL 13E APPROVED IN WRITING.
C.) CONTRACTOR SHALL 13E RE5PON51131 E FOR VERIFYING THE LOCATION OF ALL
UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK.
DEPTH FROM
SURFACE
(INCHES)
501L
HORIZON
501L
TEXTURE
(USDA)
501L
COLOR
(MUNSELL)
501L OTHER
MOTTLING
0-12 "
A
Fine Loamy 5and
IOYR53
NONE
12-24
1 13
Loamy Sand
IOYRG/3
NONE
24-110
CI
I Fine Sand
IOYRB G
NONE PERC 37"• <2 MIN/IN
1 10-13G
C2
Fine Sand
I OYRB/G
NONE 25% COBBLES
F LOOK PLAN
ABOVE THE FLOW LINE OF THE SEPTIC TANK AND 5HALL BE INSTALLED ON THE
SEPTIC TANK CAPACITY PROVIDED.
CENTERLINE OF THE TANK DIRECTLY UNDER THE CLEANOUT MANHOLE.
NOT TO SCALE
CO N STRU CTI U N NOTES :
FND,
5. YARMOUTH,
DATE OF TESTING: 7/24/2019
PERCOLATION RATE: LE55 THAN 2 MIN/INCH IN 'C I' * 'C2' LAYERS.
1.) ALL CONSTRUCTION SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE,
WITNESSED BY. ROBERT REEDY, EIT, J.M. O'REILLY * A55OCIATE5, INC.
TITLE 5, AND THE REQUIREMENTS OF THE LOCAL BOARD OF HEALTH.
AMY VON HONE, YARMOUTH HEALTH DEPARTMENT
OVERHEAD UTILITY SERVICE
NO WATER ENCOUNTERED
2.) SEPTIC TANK(5), GREA5E TRAP(5), DOSING CHAMBER(5) AND DISTRIBUTION
USE A LOADING RATE OF 0.74 GPD/SF FOR SIZING OF 501E ABSORPTION SYSTEM
BOX(ES) SHALL BE SET ON A LEVEL 5TA13LE BASE WHICH HA5 BEEN MECHANICALLY
LEACHING CAPACITY REQUIREDI
COMPACTED, OR ON A G INCH CRU5HED STONE BASE.
3.) SEPTIC TANK(5) SHALL MEET A5TM 5TANDARD C l 127-93 AND 5HALL HAVE
AT LEA5T THREE 20" DIAMETER MANHOLES. THE MINIMUM DEPTH FROM THE BOT-
5EPTIC TANK CAPACITY REQUIRED
TOM OF THE SEPTIC TANK TO THE FLOW LINE SHALL BE 48".
LOCUS.
4.) 5CHEDULE 40 PVC INLET AND OUTLET TEE5 SHALL EXTEND A MINIMUM OF G"
F LOOK PLAN
ABOVE THE FLOW LINE OF THE SEPTIC TANK AND 5HALL BE INSTALLED ON THE
SEPTIC TANK CAPACITY PROVIDED.
CENTERLINE OF THE TANK DIRECTLY UNDER THE CLEANOUT MANHOLE.
NOT TO SCALE
5.) RAISE COVER5 OF THE SEPTIC TANK AND D15TRIBUTION BOX WITH PRECAST
CONCRETE WATER TIGHT RISERS OVER INLET AND OUTLET TEE5 TO WITHIN G" OF
LEACHING CAPACITY PROVIDED
FINISH GRADE, OR A5 APPROVED BY THE LOCAL BOARD OF HEALTH AGENT.
t
G.) PIPING 5HALL CON515T OF 4" 5CHEDULE 40 PVC OR EQUIVALENT. PIPE 5HALL
` o 28
Vt=((42.0 X G.83) + (42.0 X 2.0)2 + (G.83 X 2.0)2] X 0.74 GPD/5F=35G.8 I GPD
a
BE LAID ON A MINIMUM CONTINUOU5 GRADE OF NOT LE55 THAN I%.
®
BED
[BATH
DINING
x 19.65T
7.) DISTRIBUTION LINES FOR SOIL A1350RPTION SYSTEM (A5 REQUIRED) 5HALL BE
X 20.
ON ) - 1500 GALLON 5EPTIC TANK
KITCHEN
4" DIAMETER 5CHEDU1 E 40 PVC LAID AT 0.005 FT/FT, LINE 5HALL BE CAPPED
AT END OR A5 NOTED.
�
NOT TO SCALE
i
m
8.) OUTLET PIPES FROM DISTRIBUTION BOX 511ALL REMAIN LEVEL FOR AT LEAST
BED I
LIVING
2' BEFORE PITCHING TO 501L ABSORPTION SYSTEM. WATER TE5T D15MBUTION
In
PLAN BOOK 85 PAGE 95 .
o
BOX TO A55URE EVEN DISTRIBUTION.
�„
9.) DISTRIBUTION BOX 5HALL HAVE A MINIMUM SUMP OF G" MEASURED BELOW
MAP 50 PARCEL 9
THE OUTLET INVERT,
10.) 13A5E AGGREGATE FOR THE LEACHING FACILITY SHALL CON515T OF 3/4" TO
20.5
1-1/2" DOU13LE WASHED NATIVE STONE FREE OF IRON, FINE5 AND DU5T AND 5HALL
BE IN5TALLED BELOW THE CROWN OF THE DISTRIBUTION LINE TO THE BOTTOM OF THE
501L ABSORPTION 5Y57M. BA5E AGGREGATE SHALL BE COVERED WITH A 2"
Re5erve
LAYER OF 1/8"TO' I/2" DOUBLE WASHED NATIVE STONE FREE OF IRON, FINE5 AND DUST. i
1 1.) VENT 501L A135ORPTION 5Y5TEM WHEN DISTRIBUTION LINES EXCEED 50 FEET;
WHEN LOCATED EITHER IN WHOLE OR IN PART UNDER DRIVEWAYS, PARKING AREAS,
TURNING AREAS OR OTHER IMPERVIOUS MATERIAL; OR WHEN PRE55URE D05ED.
12.) 501L ABSORPTION SYSTEM 5HALL BE COVERED WITH A MINIMUM OF 9" OF
CLEAN MEDIUM SAND (EXCLUDING TOPSOIL).
y
3
13.) FINISH GRADE 5HALL BE A MAXIMUM OF 30 OVER THE TOP OF ALL 5Y5TEM
COMPONENT5, INCLUDING THE SEPTIC TANK, DISTRIBUTION BOX, D051NG CHAMBER
BULKHEAD
UTILITY POLE
AND 501L "ABSORPTION SYSTEM. SEPTIC TANKS 5HALL HAVE A MINIMUM COVER
OF 9".
rick,
t
Paio"
1
14.) FROM THE DATE OF INSTALLATION OF THE SOIL A135ORPTION SYSTEM UNTIL
x 2o.a
;��..
Existing i
RECEIPT OF A CERTIFICATE OF COMPLIANCE, THE PERIMETER OF THE 501L A135ORP-
TION 5Y5TEM 5HALL BE STAKED AND FLAGGED TO PREVENT THE U5E OF SUCH
�
AREA FOR ALL ACTIVITIES THAT MIGHT DAMAGE THE 5Y5TEM.
W
®
Y3'
15.) ANY CONTAMINATED 501L WITHIN 5' OF THE PROP05ED 501L ABSORPTION
5Y5TEM 5HALL BE REMOVED AND REPLACED WITH CLEAN SAND. AREA TO BE
BH
1 i
ONE (1) COVER TO BE BUILT UP
TO WITHIN G" OF FINISH GRADE
FLOW PROFILE:
NOT TO SCALE
18" DIAMETER CONCRETE COVER5
TOTAL OF (4): (2) 5T, (1) DB, (1) 5A5
TOP OF FOUNDATION RA15ED TO WITHIN G" OF FINISH
GRADE (OR A5 NOTED)
EL=20.4± (5EE NOTE #5)
Proposed EL=20.3±
7
Ij
(A)19. 1 ± 17.30 1011 14"
(B)17.G±
3"
4,0"
GA5 BAFFLE -
(A)-30' I
(13)-14' f 1500 GALLON
SEPTIC TANK
SA5 DETAIL:
SCALE: I " = ICP
ASSE5SOR5'
FND,
5. YARMOUTH,
19.2 95 3 I'
MA
SYSTEM DE5IGN CALCULATIONS:
SEWAGE DE51GN FLOW,
OVERHEAD UTILITY SERVICE
2 BED OOM DWELL--1R-G@ I 10 GPD = 220 GPD
Al
LEACHING CAPACITY REQUIREDI
CB
3 BEDROOMS (MIN.) @ I 10 GPD = 330 GPD REQUIRED
-U-
5EPTIC TANK CAPACITY REQUIRED
LOCUS.
DAILYFLOW = 330 GPD @ 20097b = GGO GAL. REQUIRED
SEPTIC TANK CAPACITY PROVIDED.
1500 GALLON 5EPTIC TANK (MIN. ALLOWED)
GAS SERVICE LINE
LEACHING CAPACITY PROVIDED
t
ONE () 42.0'X G.83' 2.0' 1 FA-CHING CHAMBER CAN LEACH:
` o 28
Vt=((42.0 X G.83) + (42.0 X 2.0)2 + (G.83 X 2.0)2] X 0.74 GPD/5F=35G.8 I GPD
a
35G GPD>330 GPD REQUIRED
®
rQ'
NOTE: A GARBAGE D15P05AL 15 NOT PERMITTED WITH THI5 DESIGN.
x 19.65T
IN5TAW
X 20.
ON ) - 1500 GALLON 5EPTIC TANK
LD
ONE (1) - G OUTLET D15TRI13UTION BOX (H-20 RATED)
FOUR (4) - 500 GALLON LEACH CHAMBERS, 5EE 5A5 DETAIL FOR STONE CONFIGURATION
�
NOT TO SCALE
i
m
!L
B
DISTRIBUTION OX
,P, ...�-
In
PLAN BOOK 85 PAGE 95 .
o
DEED BOOK 29765 PAGE 222
�„
SAS
MAP 50 PARCEL 9
rD
c6
BENCHMARK: LEGEND
.Top of Concrete Bound 32 EXISTING CONTOUR
EL= 19.4± (NAVD88 Datum) -32 PROPOSED CONTOUR
X 12.34 EXISTING SPOT GRADE
24x5 PROPOSED SPOT GRADE
CB las - w- WATER SERVICE LINE
;2' 1
lo 11 5 5 5 5 +I
a = m
� � i��D$r.Z4q'�}�'r' "'k, $j � ��9 f,��,,x k✓J �* i �. � �c3��'`�.� � r .
c0 ...
Stone, _
."�;; D -Box •
11
17.02 / I G.8
2" DRO
2'
DB -G
D=BOX
H -2o
EL=20.2±
osed EL=20.1 ±
i
3G" Proposed
(9" Min - 3G" Max)
9.9
20 20.
IFN o
ll
PLAN
SCALE 1 "=20'
THIS AREA 15 5E IK47e,�it valid for REPAIR OF SEPTIC SYSTEM
BY TOWN WAT RNILv, due to State and Local septic variances.
Board of Health review and approval is required for
any future additions/renovations/alterations to
sewage facilities and/or structures/dwelling. .
Yarnnouth Illealth Department
APPROVED
' 2" LAYER OF 1 /8" - 1/2" NATIVE STONE
l 6.35 f h 3/4" - 1-1 /2" NATIVE STONE
t
N /
- �/' / / INSPECTION NOTE:
F-rj_
P
14.35 PRIOR TO FINAL IN5PECTION BY THE ENGINEER, 5Y5TEM
U5E FOUR (4) SHOREY PRECAST NEED5 TO BE COMPLETE INCLUDING BUILDUP FOR COVERS.
500 GALLON LEACH CHAMBERS 5.7'±
Longest Run 5EE SAS DETAIL FOR
24' STONE CONFIGURATION
(END VIEW) EL=B.G± BOTTOM OF TEST PIT # I O 20 40 GO
LEACHING CHAMBER
'42.0'x &83'x 2.0" SCALE I "=20'
GAMoI75Wortheast ConstWG7 -Ross - 63 Lonel Pond Dr. 5. Yarmouth\dw \87G7.5D5 PLAN.dwel
19.4
Courtney V. Joyce A. R055
C/O NORTHEAST CONST., P.O. BOX 2350, BREWSTER MA 02631
SITE 4� SEWAGE DISPOSAL SYSTEM DESIGN
53 LONG POND DRIVE, S. YARMOUTH, MA.
4a J.M. OTEILLY & ASSOCIATES, INC.
Professional Engineering & Land Surveying Services
1573 Main Street - Route 6A
P.O. Bos 1773
(508)896-8801 Office Brewster, MA 02631 :. (508)898-6602 Fax
TE: SCALE: 13Y: CHECK: 1. JOB NUMBER:
8/ 15/2019 A5 Noted RFR JMO JMO-8707
FND,
19.2 95 3 I'
-o-
OVERHEAD UTILITY SERVICE
19.2
CB
-U-
UNDERGROUND UTILITY SERVICE
GAS SERVICE LINE
®
TEST BOLE / BORING LOCATION
x 19.65T
X 20.
'
SEPTIC TANK
�
LOT 4
i
DD
B
DISTRIBUTION OX
,P, ...�-
.,`�
Area=
10,000 SF±
e o
�„
SAS
-901L ABSORPTION SYSTEM
20.5
Re5erve
RESERVED FOR FUTURE
flo"
��)
°" i
y
3
BH
�
BULKHEAD
UTILITY POLE
rick,
t
Paio"
1
5
x 2o.a
;��..
Existing i
o"
�
.�
E
W
®
Y3'
CATCH BASIN
FIRE HYDRANT
i
BH
1 i
>
*'
LIGHTPOST
x 20.4
20_.3
2 Bedroom
�) Dwelling
x 2016
0
7
.
00' 5AS
Top of Fndn. j
®
DRAINAGE MANHOLE
_ _:
p _:.,_
o
�" ,•,. -
12.4'±
% : EL=20.4 S Q»
nck-
m
CONCIRFTE,BOUND: FOUND_-- - -
r
�.
TOP OF BANK
Approx. Location of
STc
y ;�
1
Q
-x-x-
LIMIT OF WORK
Existing 5eptic .iystemo.6
TO BE REMOVED;
DB
i.
i/ /.��/l:!I
_.I.
19.g
Z
'L FENCE
POSTS RAI
SEE NOTE 15
20.4\
��
O
-.--e-a--�--
STOCKADE FENCE
Oak Tree
TO BE REMOVED
c
_
e\ W w
w. y
w
`.
��
EDGE OF CLEARING
;2' 1
lo 11 5 5 5 5 +I
a = m
� � i��D$r.Z4q'�}�'r' "'k, $j � ��9 f,��,,x k✓J �* i �. � �c3��'`�.� � r .
c0 ...
Stone, _
."�;; D -Box •
11
17.02 / I G.8
2" DRO
2'
DB -G
D=BOX
H -2o
EL=20.2±
osed EL=20.1 ±
i
3G" Proposed
(9" Min - 3G" Max)
9.9
20 20.
IFN o
ll
PLAN
SCALE 1 "=20'
THIS AREA 15 5E IK47e,�it valid for REPAIR OF SEPTIC SYSTEM
BY TOWN WAT RNILv, due to State and Local septic variances.
Board of Health review and approval is required for
any future additions/renovations/alterations to
sewage facilities and/or structures/dwelling. .
Yarnnouth Illealth Department
APPROVED
' 2" LAYER OF 1 /8" - 1/2" NATIVE STONE
l 6.35 f h 3/4" - 1-1 /2" NATIVE STONE
t
N /
- �/' / / INSPECTION NOTE:
F-rj_
P
14.35 PRIOR TO FINAL IN5PECTION BY THE ENGINEER, 5Y5TEM
U5E FOUR (4) SHOREY PRECAST NEED5 TO BE COMPLETE INCLUDING BUILDUP FOR COVERS.
500 GALLON LEACH CHAMBERS 5.7'±
Longest Run 5EE SAS DETAIL FOR
24' STONE CONFIGURATION
(END VIEW) EL=B.G± BOTTOM OF TEST PIT # I O 20 40 GO
LEACHING CHAMBER
'42.0'x &83'x 2.0" SCALE I "=20'
GAMoI75Wortheast ConstWG7 -Ross - 63 Lonel Pond Dr. 5. Yarmouth\dw \87G7.5D5 PLAN.dwel
19.4
Courtney V. Joyce A. R055
C/O NORTHEAST CONST., P.O. BOX 2350, BREWSTER MA 02631
SITE 4� SEWAGE DISPOSAL SYSTEM DESIGN
53 LONG POND DRIVE, S. YARMOUTH, MA.
4a J.M. OTEILLY & ASSOCIATES, INC.
Professional Engineering & Land Surveying Services
1573 Main Street - Route 6A
P.O. Bos 1773
(508)896-8801 Office Brewster, MA 02631 :. (508)898-6602 Fax
TE: SCALE: 13Y: CHECK: 1. JOB NUMBER:
8/ 15/2019 A5 Noted RFR JMO JMO-8707