Loading...
HomeMy WebLinkAboutReview Checklist SIN TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AM 23 LOT/3i-.2.-- Date of Subdivision Approval Street 4' � /i /�ez> Zone of Contribution: In Out / � Village ehoviem-771 Commercial Residential Owner: L i Zr'/ 6:-/2„cot Installer / /S1 I fed Tali '/ ►c3/ /' Ok. 790-922-,3 77/ -7 3,7 Builder: 7.11,ite Engineer / sC'"-Ov'e..0.30,,fleBo't362. N/A YES NO 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. �/ 3. 4 feet of naturally occurring pervious material above water table(new construction) 4. Foundation 2 feet above high point of fronting road for new construction. i/ 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown-NGVD if near wetlands. -t/' 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. L/' 9. Leaching a minimum of 20 feet from house and 10 feet from deck. 4./ 0. . . . . ii'i-._t L • I I , • H we l:1 • 11. Leaching a minimum of 150 feet from drinking,wells/25 feet from irrigation wells. 12. System meets all other setback requirements._ t,----"' 13. Uses adjustment for maximum hi ter. i./ 14. Leaching 4-5 feet above water table bottom of test pit. 15. System not in toper subsoi or .of remov. 16. Proposed contours are suitable. 17. System meets slope requirements-min. 1/8". 114" preferred. v_/ . vYe , t.- 4 . - . , u e•u - ..-_s - ..a: Yi1, 1- • ' . ._li,. . i - - (.t-1 Al. 19. Specified tee sizes are proper. gas baffle on outlet tee. . 20. Sewage flow under 1 O.ON gpd for parcel. t.------- 21. No garbage disposal: .. /' 22. System adequately sized fir its intended use. • 23. Minimum 6" stone or mechanically compacted below the tank and d-box. �� 24. Manhole covers within 6" of grade-septic tank and pump chamber. c/ 25. Electrical permit for pump chamber. 26. Pump system-?" line. weep hole. check valve, sanitary in d-box. alanmon separate circuit. . S- .tc • . .. • h_. . _moi. .,__.] .;4 t. .- F• t._a wat-_ i... - 4 V- . . i.e• ' " -CLQ' • _1W it . . - a . ti,ti . . •_IP .1. 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system .,/` 30. Engineer and Land Surveyor stamp and signature. f31. H2O loading when system subject to vehicular traffic. 32. Title V application and fee signed by a licensed installer. ,. 33. Foundation footing 2 feet above adjusted water table. „. 34. Lot subdivided prior to July 31. 1986 - Nitrate Loading. ..........7- 35. Subdivided prior io April 7. 1989 - Phosphorus Zone 300'. Plan reviewed by: 7