HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
' SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. � c/4 ""i. Lot 7-5Zone of Contribution: In Out T Acreage
tCommercial: Residential:
c- C
Street: 2G2 w /)
Village: �C� L4 Floor Plan: c/ #Bedrooms
Owner: i
---
/ a4._ Installer: 1C ;11,( _ 4 4Cl.C/
Address: Phone:
Phone:
Builder: Engineer: 6-s5 t€4,e14 C41061/
Address: Phone: 5-0X'S----3
Phone: _ /6 f7 7J /lamzr'vi/2°!/1-(1"4G
P6?-,e
N/A YEESN O
1.Required#of copies received
2. Date of soils exam and percolation test not older than 2 years
i.....-----
3. 4-5 ft of naturally occurring pervious material,above water table l.....-----
4.
f4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1/4._...---
5.
._i5. Water line 10 ft from septic components Var.: c..-----
6.
i6. Benchmark indicated and shown-NGVD if near wetlands `--
7. Septic tank minimum 10 ft from foundation, deck Var.: (._----
8.
f8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L..----
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: c.......---
12. System meets all other setback requirements Var.: L.----
13. Uses adjustment for maximum high groundwater Var.: `..---
14.Leaching set 4-5 ft above adj. water or bottom o ole Var.: C-----
15.
f15. System not in top or subsoil(A,B horizons)of 'removal L-------
16.Proposed contours are suitable ��
17. System meets slope requirements-min. 1/8", '/"preferred �-
18. System meets breakout requirements PVC liner: Wall: L________-
19.
_______19. Specified tee sizes are proper,gas baffle on outlet tee L----
20. Sewage is under 10,000 gpd for parcel
(...---
21.No garbage disposal `__-
22.System adequately sized for its intended use
\-___.----
23.Minimum 6"stone or compacted below tank and dbox _____
r. 24.Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field `.b..----
26.
f26. Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed --°---
29. Vent provided if leaching below 3 feet, under driveway/parking -''
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: -.'-----
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ..------
33. H-20 loading is subject to vehicular traffic,groundwater �-
34. Title V Application and permit fee, installer signature �/'
35.Foundation footing min.2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd -- -,
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: C 6/03/03