Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH ' SEWAGE PLAN REVIEW CHECKLIST Location: A.M. � c/4 ""i. Lot 7-5Zone of Contribution: In Out T Acreage tCommercial: Residential: c- C Street: 2G2 w /) Village: �C� L4 Floor Plan: c/ #Bedrooms Owner: i --- / a4._ Installer: 1C ;11,( _ 4 4Cl.C/ Address: Phone: Phone: Builder: Engineer: 6-s5 t€4,e14 C41061/ Address: Phone: 5-0X'S----3 Phone: _ /6 f7 7J /lamzr'vi/2°!/1-(1"4G P6?-,e N/A YEESN O 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years i.....----- 3. 4-5 ft of naturally occurring pervious material,above water table l.....----- 4. f4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1/4._...--- 5. ._i5. Water line 10 ft from septic components Var.: c..----- 6. i6. Benchmark indicated and shown-NGVD if near wetlands `-- 7. Septic tank minimum 10 ft from foundation, deck Var.: (._---- 8. f8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L..---- 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: c.......--- 12. System meets all other setback requirements Var.: L.---- 13. Uses adjustment for maximum high groundwater Var.: `..--- 14.Leaching set 4-5 ft above adj. water or bottom o ole Var.: C----- 15. f15. System not in top or subsoil(A,B horizons)of 'removal L------- 16.Proposed contours are suitable �� 17. System meets slope requirements-min. 1/8", '/"preferred �- 18. System meets breakout requirements PVC liner: Wall: L________- 19. _______19. Specified tee sizes are proper,gas baffle on outlet tee L---- 20. Sewage is under 10,000 gpd for parcel (...--- 21.No garbage disposal `__- 22.System adequately sized for its intended use \-___.---- 23.Minimum 6"stone or compacted below tank and dbox _____ r. 24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field `.b..---- 26. f26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed --°--- 29. Vent provided if leaching below 3 feet, under driveway/parking -'' 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: -.'----- 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ..------ 33. H-20 loading is subject to vehicular traffic,groundwater �- 34. Title V Application and permit fee, installer signature �/' 35.Foundation footing min.2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd -- -, 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: C 6/03/03