Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH l,� SEWAGE PLAN REVIEW CHECKLIST / 1i/k--a ) 6‘e/ • Location: A.M. /OP Lot 0 2.- Zone of Contribution: In ,lout_ Acreage 2 � S-----1---S-.2Y' Commercial: Residential: �. Street: SL_ 6 Village: /A. Floor Plan: #Bedrooms: 2--- Owner: ;„ Owner: .i_ Installer: 1�Yd' J�'1 d C' Address: ;„ Phone: S-e -3‘2_- a 2-3 7 Phone: Builder: Engineer: 6' 5 , ' , Address: Phone: -44V -3@Y Phone: N/A YES NO 1.Required#of copies received t -- / 2. Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table L.____, 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: L..---- 6. Benchmark indicated and shown-NGVD if near wetlands L...-/- 7. /7. Septic tank minimum 10 ft from foundation, deck Var.: ..:_.----- 8. /8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ✓" 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: L_..--- 11. 11. Tank/leaching minimum 10 ft from property line Var.: In [ ( (-� 12. System meets all other setback requirements Var.: L------ 13. Uses adjustment for maximum high groundwater Var.: c____--- 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 1% 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable \_- 17. System meets slope requirements-min. 1/8", 1/4"preferred C.--- 18. System meets breakout requirements PVC liner: Wall: 1„// 19. Specified tee sizes are proper,gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel t_.----- 21. /21.No garbage disposal 22. System adequately sized for its intended use 4t5_,,,› 23. Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field tY 26. Electrical permit for pump chamber/Separate meter for duplexes C_-/ 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ____- 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking c c------ 30. /30. Buoyancy calculations for tank/pump chamber L.,/ 31. Engineer to inspect and certify soils: wall: commercial: ‘......7.- 32. l32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature L._------ 33. H-20 loading is subject to vehicular traffic,groundwater ,------ 34. f34. Title V Application and permit fee, installer signature `---. 35. Foundation footing min.2 feet above adjusted ground water for new house .J- 36. Deed Restriction required max. #bedrooms: max. flow: gpd __.--- 37. -37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: ( 6/03/03