Loading...
HomeMy WebLinkAboutReview Checklist .., 4_ i-/ TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. / 7 Lot 1/ Zone of Contribution: In Out ` Acreage ��� � 2���w Commercial: Residential: (------1Street: / / / Village: a4 l!/! Floor Plan: ✓ #Bedrooms: 1 Owner:/4/..i[ .Atid,/GNU Installer: ja*Al. ii4Wj .a Address: Phone: Phone: Builder: Engineer: 4-24,,,,z4ez07 Address: Phone: - -sa"`r„ Phone: N/A YES NO 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years I----- 3. 4-5 ✓3. 4-5 ft of naturally occurring pervious material, above water table L.----- 4. .-/4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: t...------- 5. /5. Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands t....------ 7. �7. Septic tank minimum 10 ft from foundation, deck Var.: _ t....- 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: �. 9. Leaching minimum 100 ft from wetlands Var.: ti - 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: l.---- 12. System meets all other setback requirements Var.: •.__- 13. Uses adjustment for maximum high groundwater Var.: L� 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: t.--- 15. System not in top or subsoil(A,B horizons) or 5'removal C.----- 16. _s16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred .------- 18. /18. System meets breakout requirements PVC liner: Wall: --® 19. Specified tee sizes are proper, gas baffle on outlet tee v' 20. Sewage is under 10,000 gpd for parcel L.....-- 21.No garbage disposal 22. System adequately sized for its intended use (--.--- 23.Minimum 6" stone or compacted below tank and dbox t---- ' 24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection porton plastic chambers/leach field tom• 26. Electrical permit for pump chamber/Separate meter for duplexes `--- 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size �--�' 28. Septic tank/pump chamber to be factory waterproofed ..--' 29. Vent provided if leaching below 3 feet, under driveway/parking `..--'' 30. Buoyancy calculations for tank/pump chamber (...---- 31.Engineer to inspect and certify soils: wall: commercial: 1/4--_ -4 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ...____. 33.H-20 loading is subject to vehicular traffic, groundwater `----' 34. Title V Application and permit fee, installer signature - .----' 35.Foundation footing min. 2 feet above adjusted ground water for new house \-.--- 36. Deed Restriction required max. #bedrooms: max. flow: gpd �--"' 37. Check area lots for groundwater/Label groundwater in Assessor's Map - t......--- Plan `Plan reviewed by: C-14 6/03/03