Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2019LEGEND -- 99- EXISTING CONTOUR X 99.1 EXIST. SPOT ELEV. -[99]- PROPOSED CONTOUR 198.41 PROPOSED SPOT EL. TH1 4 - TEST HOLE - - 2� SLOPE OF GROUND 9.7' UTILITY POLE 9.7' FIRE HYDRANT NOTE: NOT ALL SYMBOLS MAY APPEAR IN DRAWING SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED DESIGN FLOW: 4 BEDROOMS @ 110 GPD = 440 GPD USE A 440 GPD DESIGN FLOW SEPTIC TANK: 440 GPD (2) = 880 USE A 1500 GAL. H-10 SEPTIC TANK LEACHING: 440 GPD (.74) = 595 SF REQUIRED 17' X 35' = 595 SF OK 595 SF X .74 = 440 GPD OK USE A 17' X 35' PIPE AND STONE LEACHING FIELD APPROVED DATE , MA BOARD OF HEALTH TEST HOLE LOGS ENGINEER: CRAIG J. WITNESS: AMY VON DATE: 6/28/2018 FERRARI, SE HONE, RS #13871 PERC. RATE _ < 2 MIN/INCH 2. MUNICIPAL WATER IS EXISTING c CLASS I SOILS _ 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS 4 ELEV. APR i b 2019 ELEV. 4 p" 9.7' 0,. 9.7' A Pon d 7.7' A LS BE USED FOR LOT LINE STAKING OR ANY OTHER LS 1OYR 4/2 8. PIPE' FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 1OYR 4/2 9» WITHOUT INSPECTION BY BOARD OF HEALTH AND g» B B LS LS 26" 1OYR 6/8 7.5' 30" 1OYR 6/8 8.2' SYSTEM PROFILE ACCESS COVERS TO WITHIN 6" OF FIN. GRADE TOP FOUND. EL. 12.1 11.5' MINIMUM .75 OF COVER OVER PRECAST PRECAST H-10 WATERTEST D'BOX RISERS (TYP.) FORLEVELNESS 2'0 4"4SCH40 PVC PIPES LEVEL 1ST 2' - " GAL -H-10 "- - - .; 10 1500 G L 14 8,75' TEE SEPTIC TANK TEE - $ 5, ; 00000°O°O°00 o GAS BAFFLE °0°,0,°,0°0,°,0° 4' LIQ; LEVEL (ACME OR EQUAL) .; 8.1 7.93' 7.88' •J.;0E0;0O`00 0•0 0'0 0•0O0.O0,O Oa 0O0. O0.O 000OOO0°0°0000000O„0O00O000O0'0O10,00�•01 7O0 0 000,0n0o0000000l, 6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 [2]) MARK CORNERS OF LEACHING FIELD W/ REBAR SET 4" BELOW INSPECTION PORT (SEE DETAIL) GRADE 2% SLOPE FILTER FABRIC .0-9.5 TOP B.FINISHED GRADEIr ;4" LOAM & SEED f9E_ D 1 i lilla f CLEAN FILL lop 4" PERFORATED PVC 4' O.C. S=0.005 ---.- 0 O 3/4"-1-1/2" DOUBLE WASHED 0 8" STONE LEACHING FIELD LEVEL BOTTOM ' 0 35.0' 7.11' (2---5-7. SLOPE) M IN. (_L7. % SLOPE) (-1-7. SLOPE) FOUNDATION- 10' SEPTIC TANK 40' D' BOX 7' LEACHING FACILITY C C PERC G -W ADJ. DATA: MS MS WELL: MIW 29 ZONE: A ADJ: 0.4' 1OYR 7/4 1OYR 7/4 MAY 2018 120" I -.3' 132" I I -1.3' GROUNDWATER ENCOUNTERED AT 96" EL 1.7' LICE #18-166 5 0' PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING iADJUSTED GROUNDWATER EL. 2.1 DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES I 'c PRIOR TO COMMENCEMENT OF WORK. LOCUS OCUS MAP 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE SCALE 1"=2000'± REMOVED BENEATH AND 5' AROUND THE PROPOSED LEACHING FACILITY. ASSESSORS MAP 17 PARCEL 11 rI i 12. FLOOD RESISTANT CONSTRUCTION REQUIRED TO EL. LOCUS IS WITHIN FEMA FLOOD ZONE AE EL. 11 12.0. FLOODZONE COMPLIANT FOUNDATION DESIGN BY j AS SHOWN ON COMMUNITY PANEL NOTES �5 1. DATUM IS NAVD '88 REVISED: MARCH 25, 2019 (WLL, DRIVEWAY) 2. MUNICIPAL WATER IS EXISTING c 3. MINIMUM PIPE PITCH TO BE .1 /8" PER FOOT. _ 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS TO BE AASHO H_10 APR i b 2019 5. PIPE JOINTS TO BE MADE WATERTIGHT. MEALTH DEPT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 6"DEPTH 310 CMR 15.000 (TITLE 5.) - MIN BELOW INV. Pon d 7.7' 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. a 8. PIPE' FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED Gee° WITHOUT INSPECTION BY BOARD OF HEALTH AND 5 0' PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING iADJUSTED GROUNDWATER EL. 2.1 DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES I 'c PRIOR TO COMMENCEMENT OF WORK. LOCUS OCUS MAP 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE SCALE 1"=2000'± REMOVED BENEATH AND 5' AROUND THE PROPOSED LEACHING FACILITY. ASSESSORS MAP 17 PARCEL 11 rI i 12. FLOOD RESISTANT CONSTRUCTION REQUIRED TO EL. LOCUS IS WITHIN FEMA FLOOD ZONE AE EL. 11 12.0. FLOODZONE COMPLIANT FOUNDATION DESIGN BY j AS SHOWN ON COMMUNITY PANEL OTHERS. #25001 CO588J DATED 7/16/2014 13. ALL ROOF RUNOFF TO BE DIRECTED TO GRAVEL DRIP. EDGES OR ROOF DRYWELLS. ZONING SUMMARY ZONING DISTRICT: R-25 RESIDENTIAL DISTRICT MIN. LOT SIZE 25,000 S.F. MIN. LOT FRONTAGE 150' MIN. FRONT SETBACK 30' MIN. SIDE SETBACK' 15' MIN. REAR SETBACK 20' MAX. BUILDING COVERAGE 25% SITE IS LOCATED WITHIN NHESP PRIORITY HABITAT 't �5 REVISED: MARCH 25, 2019 (WLL, DRIVEWAY) REVISED: APRIL 9, 2019 (WLL,. TREELINE) c RECEIVED I f APR i b 2019 Q 0 MEALTH DEPT. off 508-362-4541 Lewis _-_ _ r E Lewis Locus Bay Pon d �'odio Power Nantucket a 939 Main Street ( R to 5A) Sound Gee° OTHERS. #25001 CO588J DATED 7/16/2014 13. ALL ROOF RUNOFF TO BE DIRECTED TO GRAVEL DRIP. EDGES OR ROOF DRYWELLS. ZONING SUMMARY ZONING DISTRICT: R-25 RESIDENTIAL DISTRICT MIN. LOT SIZE 25,000 S.F. MIN. LOT FRONTAGE 150' MIN. FRONT SETBACK 30' MIN. SIDE SETBACK' 15' MIN. REAR SETBACK 20' MAX. BUILDING COVERAGE 25% SITE IS LOCATED WITHIN NHESP PRIORITY HABITAT 't I REVISED: MARCH 25, 2019 (WLL, DRIVEWAY) REVISED: APRIL 9, 2019 (WLL,. TREELINE) i I RECEIVED I f APR i b 2019 0 10 20 30 40 50 FEET MEALTH DEPT. Yarmouth Health Department VIT NLPi11e Date T�TLIE OF III - �A, in'' .�0N jI U40 F� 0 0 ��_ LA - ��i 1. ONnL ENS �� DATE DANIEL A. OJALA, P.E., P.L.S. DATE: FEBRUARY 8, 2019 REVISED: MARCH 4, 2019 (GRADING) REVISED: MARCH 25, 2019 (WLL, DRIVEWAY) REVISED: APRIL 9, 2019 (WLL,. TREELINE) RECEIVED Scale:1 "= 20' APR i b 2019 0 10 20 30 40 50 FEET MEALTH DEPT. off 508-362-4541 I fax 508-362-9880 downcope.com down cape eaprineering, inc. civil engineers land surveyors 939 Main Street ( R to 5A) YARMOU THPOR T MA 02575