Loading...
HomeMy WebLinkAboutReview Checklist . i G.,(7--( TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Zf i Lot g!' c- Zone of Contribution: In Out eage Commercial: Residential:-- - Street: ( esidential:- Street: /�,L Village: / �ef.. ..0, i..1,1. Floor Plan: (-----"- #Bedrooms: Cp �'% G�1 Owner: cZL WI Installer: 7 Address: Phone: ikG Z(def , Phone: / 1/-e-?/745114' <�/ Builder: Engineer: r/ f _ Address: Phone: _w ��� f, ' Phone: / care/' - 4 ..4, 4,0e-c : ,). 3. � N/ANO 1.Required#of copies received i 2.Date of soils exam and percolation test not older than 2 years t---- 3.4-5 _____3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ...----- 5.Water line 10 ft from septic components Var.: 5kla„L f yjfS 6.Benchmark indicated and shown-NGVD if near wetlands ( 7. Septic tank minimum 10 ft from foundation, deck Var.: 1/4.----- 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: /p' L_-_. 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: / 12. System meets all other setback requirements Var.: f,,,r ‘t /.��., 26,60 (----)13.Uses adjustment for maximum high groundwater Var.: / 14.Leaching set 4-5 ft above adj.water or bottom of hole .1.: �� ( . 15. System not in top or subsoil(A,B horizons)o remov 1 i_____:_ 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '/a"preferred (---- 18. System meets breakout requirements PVC liner: 4Oall: fi7grk.--• L----"' 19. Specified tee sizes are proper,gas baffle on outlet tee c.----• 20. Sewage is under 10,000 gpd for parcel L1 ' 21.No garbage disposal 22. System adequately sized for its intended use AdC(.0fGIEi 23.Minimum 6"stone or compacted below tank and dbox ! 24.Manhole covers within 6"of grade,pump chamber cover to grade l ----. 25.Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size Lam. 28. Septic tank/pump chamber to be factory waterproofed L.-, 29.Vent provided if leaching below 3 feet, under driveway/parking _ 30.Buoyancy calculations for tank/pump chamber L---. _ 31.Engineer to inspect and certify soils: wall: commercial: 4.-- 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature C.� 33.H-20 loading is subject to vehicular traffic, groundwater � 34.Title V Application and permit fee,installer signature _ 35.Foundation footing min. 2 feet above adjusted ground water for new house ------ 36.Deed Restriction required max. #bedrooms: max.flow: gpd �--�' 37.Check area lots for groundwater/Label groundwater in Assessor's Map ........ .....11 I �� 14 Plan reviewed by: 6/03/03