Loading...
HomeMy WebLinkAboutReview Checklist %Ill TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST • Location: A.M. �C Lot 7 5 Zone of Contribution: In_ Out Acreage Commercial: Residential: Street: I Village: /l. # Floor Plan:*6-7( CD #Bedrooms: Owner: )5 46 Ui4 $' �o Installer: i"( Address: 0 2 tf i '& -, z 5 Phone: "CS-- 5-99:: Phone: I Builder: 2i'-r4-(--Q Engineer: Y ' ;'/L Address: Phone: i- 3 -2 Phone: N/A YES N®!� 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 1 3.4-5-ft-of naturally-occurring pervious material,above water table_ _ - 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: l/ 6.Benchmark indicated and shown-NGVD if near wetlands 1/ 7. Septic tank minimum 10 ft from foundation,deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ 11.Tank/leaching minimum 10 ft from property line Var.: 1/ 12. System meets all other setback requirements Var.: r/' 13.Uses adjustment for maximum high groundwater Var.: b/. 14.Leaching set 4-5 ft above adj.water or botto otest ar.: L...----;/ 15.System not in top or subsoil(A,B horizons) 5'removal ✓ 16.Proposed contours are suitable c./- 17. System meets slope requirements-min. 1/8", 'A"preferred 1/ 18. System meets breakout requirements PVC liner: Wall: L/ ,, 19. Specified tee sizes are proper,gas baffle on outlet tee ( ' ' 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 1 22. System adequately sized for its intended use 1� 23.Minimum 6"stone or compacted below tank and dbox i ' 24.Manhole covers within 6"of grade,pump chamber cover to grade k./ 25.Inspection port on plastic chambers/leach field 1/ 26.Electrical permit for pump chamber/Separate meter for duplexes L/ 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size terproofed 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: k 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature 1/. 35.Foundation footing min.2 feet above adjusted ground water for new house 1 / 36.Deed Restriction required max, #bedrooms: max.flow: gpd t- 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: \'V 6/03/03