HomeMy WebLinkAboutEngineered Plans - 2019Dc� 40
�e
A
Ok ,10 �`l;" 44 O 0
44.3 QP
439
0^
44.9
S
C oo �\ ;'- �2c
20' Oak 44.3 .o C., O
45.6 °�°C,13 ��- <
c
20' Oak 44.6 B 'O em
ti 4 .5 1ti o/0 0
--Z
moo,, i
6
— _--PROPOSED-LEACHING-AREA--=
30.0' X /0.O' X 2.0' (H-/0)
BENCHMARK.- EL. 44.9
ASSUMED DA TUM
TOP OF STAKE SET
ti�
1�
A If
44.9
3046.6 a!<.
4
Wells not shown exceed 150' from the proposed SAS
Permit valid for REPAIR OF SEPTIQnSYSTEM
ONLY, due to State and Local septic variances.
Board f Health review and approval is required for
any 'u re additions/renovations/alterations to
sewage fac ities and/or structures/dwelling.
Yar outh Health Department
A PROVED
LOT 35
13,126 SFf .. / MAG NAIL
4t3 2.4 SET
0.30 Acf
A
44.4 4 9
_ OHU - -
+ Utility
Pole
\ IP
FND
+ �5
PROPOSED /500 -GALLON
SEPTIC TANK (H-10)
PUMP & REMOVE
EX/ST/NG CESSPOOLS
& CONTAM/NA TED SOLS
W/ THIN 5' OF PROP. SAS
Srnv pc," � 6-e. o\k �S 8 ►�'�vwc
Roots S �V'r'X G
0 HEAT l�
BEDROOM BATH BA TH i I
DINING
/SOLA PED
/ ROOM ROOM AREA KITCHEN
J
ROOM
I
(HOPPER
CL GARAGE
WINDOW) PARTIALLY FIN/SHED
CL CL
BASEMENT
45.5
/SOLA TED
BEDROOM BEDROOM ROOMLIvINPORCH
ROOK
ROOM
2 3
(HOPPER
— — - w - —
WINDOW)
FIRST FLOOR PLAN
BASEMENT FLOOR PLAN
NOT TO SCALE
NOT TO SCALE
C 2019 Moran Engineering Associates, LLC
Existing Fence Line
LEGEND
Existing Building
Edge of Driveway
--115-01- -
Existing Contour
(�
Existing Septic
45.5
Existing Spot Elevation
- — - OHU - -
Overhead Utility Lines
4em
Electric Meter
— — - w - —
Existing Water Line
— — - G - —
Existing Gas Line
49m
Gas Meter
X
Existing Fence Line
Septic Test Hole
H OF IggssqCy
RICHARD GN
J.
JUD J %
S 1 1P�
SCALE; V=20'
0 20 40 60
Moran Engineering Associates, LLC
941 Route 28 N PO Box 183
South Harwich, MA 02661
508-432-2878
SITE AND SEWAGE PLAN
1 Mariners Lane
Yarmouth Port, MA
EPARBD FOR
Michael King
132-87 SHEET 1 of 2
FxOmcr:
08/23/2019 19-169
ELEV.
44.8
...41.5.-
...32.8..
PROFILEL PROVIDE 4' PVC GLEAN -OUT CAPS (C/O) TO
COLOR REDOX.
(MUNSELL) FEATURES
STRUCTURE
CONSISTENCY, OTHER
40' HTM Fill
1.
ALL SYSTEM COMPONENTS SHALL BE INSTALLED IN ACCORDANCE W/TITLE 5 OF THE SANITARY CODE 6 ANY APPLICABLE
Not to Scale `SDE GA DON LINGCONT AND SEPTIC TANK SEPTIC TANK 2. INSTALL IRRIGATION CONTROL Box COVERS
"D" BOX
Loose, Single Grain, Variegated Colors
LEACH FACILITY
2.
PRIOR TO BACK FILLING THE INSTALLATION, THE DESIGNER 5 HEALTH AGENT SHALL BE NOTIFIED FOR INSPECTION.
OVERC/015.
CLEAN-0UT
1500 GAL
ANY ALTERATIONS OF THIS DESIGN MUST BE APPROVED BY THE DESIGNER 6 BOARD OF HEALTH, IN WRITING.
USE (1)1500- GALLON (H-10) SEPTIC TANK
500 GAL DRY WELLS
INSTALL (2) ACCESS'PORTS OVER LEACH CHAMBERS-W/PRECAST
in
5.
EL 44.5
3. LEACH FACILITY DESIGN: 30.0' X 10.0' X 2.0' (H-10)
coNCRETE(OR EQUIV.) WATERTIGHT RISER.]hR11M3•,(MIN.)
SIDE WALL AREA: 2 (30.0 + 10.0) X 2.0 X 0.74 GPD/SF = 118.4
TOP OF
EL. 45.0 FOUNDATION
ALL UNSUITABLE MATERIAL WITHIN 5 FT. IN ALL DIRECTIONS FROM THE SOIL ABSORPTION SYSTEM SHALL BE
COVERS (2) TO BE WITHIN 6' OF GRADE MIN. 9' COVER
TO WITHIN EL 45.0
REMOVED A REPLACED W/CLEAN, COARSE SAND.
MIR 2x SLOPE
OF FINAL GRADE
ALL FILL MATERIAL UTILIZED FOR THE SOIL ABSORPTION SYSTEM SHALL BE CLEAN, COARSE SAND FREE FROM
..
4'CASTIRON
DELETERIOUS MATERIAL AND SHALL HAVE A PERCOLATION RATE OF LESS THAT 2 MIN./IN. BEFORE 6 AFTER PLACEMENT.
340 GPD PROVIDED % 330 GPD REQUIRED
8.
ACCESS PORTS
MAX.36'COVER
DURING INSTALLATION, THE CONTRACTOR I5 RESPONSIBLE TO PROVIDE A SAFE EXCAVATION AREA.
OFFIIJALGRADE
..,
GROUND COVER OVER SEPTIC SYSTEM COMPONENTS SHALL NOT EXCEED 36".
OF 3/4" TO 1-1/2" DOUBLE WASHED STONE ALONG ENDS AND
11.
ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE NOTED. THE MINIMUM SLOPE OF 4" DIA.
2.6' ALONG SIDES.
SCH 40 PVC SHALL NOT BE LESS THEN 0.01 FT/FT.
4• SCH 40 P.V.C.
12.
WHEREVER SEPTIC LINES CROSS WATER SERVICE LINES OR WHEN WATER SERVICE LINES COME WITHIN 10' OF THE
PROPOSED S.A.S.- PIPES SHALL BE CLASS 150 PRESSURE PIPE & SHOULD BE PRESSURE TESTED TO ASSURE WATER
TIGHTNESS. COORDINATE WITH LOCAL WATER DEPARTMENT.
13.
F F PLAN
PLACE MAGNETIC MARKING TAPE OVER ALL COMPONENTS. S 1TE AND SEWAGE PLAN
CONSTRUCTION NOTES
9` COVER
SUBJECT: 1 Mariners Lane
2" LAY,ROF 1/B" TO 1/2" DOUBLE WASHED
S
um
mix-�
PRIOR TO START OF PROJECT.
2. EXISTING SEWER ELEVATION I5 TO BE VERIFIED PRIOR TO THE INSTALLATION OF NEW SYSTEM COMPONENTS. PREPARED FOR.,
Michael King
3. REPLACE SEWER LINES BACK TO ORIGINAL CAST IRON OR PVC AS NEEDED. INSTALL TWO-WAY SWEEPS WITH 4" PVC
CLEAN OUTS TO GRADE BETWEEN DWELLING AND PROPOSED SEPTIC TANK AS SHOWN. PROVIDE IRRIGATION ASSESSORSID: sir.
CONTROL BOX COVERS OVER CLEAN OUTS.
132-87 1 SHEET 2 of 2
MAX 36" COYER
STONE 0A FILTER FABRIC OVER ENTIRE
• . t
EL 42.0
LEAct+A1tEEA. ...
.
A: EL 42.8
s"MIN
,•scH.,oP.Y.C.
B: EL. 42.7
-'
=
2._3.
10" MIN �4"M
O O O !� O
"";
;'•
EL. 42.0
1,500 4.0
EL
41,8 EL. 41.6
EL 41.4 EL. 41.2
o 0 0 0 0
r' y-'.
2.0'EFFECTIVE
.,DEPTH
'.�.
GALLON INSTALL
BAFFLE
_
_ - _ - - _ _ _
-
Level sre BASE
eLE
EL. 39.2
r r
225 -26
BLE HE ONE
3/4' TO 1-U2• DOU WAS D 5T
r r
225 -28
A. 35'±, B: 10'±
......_ ...............................
LEVEL STABLE BASE
12'±TO
12'±11'±
max
STONE
STONE
. BOTTOM OF
6.4 '
25.5' LENGTH INSTALLED
D.O.H.
SEPTIC TANK NOTES
"D" BOX NOTES
30.0' OVERALL LENGTH INSTALLED
1. Replace any orangeburg sewer line(s)
1. Extend inlet tee 10" min. below flow line,
1. When system is dosed or slope of inlet pipe exceeds
back to original cast iron or PVC as needed.
extend outlet tee 14" below flow line.
0.08'/ft. install inlet tee cut-off one inch above outlet invert.
2. Provide 20" manholes over center of tank,
2. Install outlet pipes level 2 feet minimum.
inlet and outlet with readily removable
3. Provide a minimum
m sump of 6" below outlet invert.
EL. 32.8
impermeable covers.
No WATER ENCOUNTERED
3. Install access port over inlet and outlet
4• Install access port over "D" Box with precast concrete
with precast concrete or equivalent watertight
or equivalent watertight riser within 6" min. of final grade.
riser within 6" min. of final grade.
DEEP HOLE LOGS
DEEP OBSERVATION HOLE # 1 TEST BY.• RICK JUDD DATE: 08/22/2019
From HOR. TEXTURE
Surface
COLOR REDOX.
(MUNSELL) FEATURES
STRUCTURE
CONSISTENCY, OTHER
40' HTM Fill
1.
ALL SYSTEM COMPONENTS SHALL BE INSTALLED IN ACCORDANCE W/TITLE 5 OF THE SANITARY CODE 6 ANY APPLICABLE
1,W C Fine to Medium Sand
2.5 Y 613
Loose, Single Grain, Variegated Colors
BOTTOM OF PERC.: 78" in C -Layer RATE: < 2 Min / Inch
WITNESS: P. Renaud, Yarmouth Health Department
2.
C 2019 Moran Engineering Associates, LLC
DESIGN
GENERAL NOTES
1.
ALL SYSTEM COMPONENTS SHALL BE INSTALLED IN ACCORDANCE W/TITLE 5 OF THE SANITARY CODE 6 ANY APPLICABLE
1. REQUIRED FLOW: 3 BEDROOMS X 110 GPD/B.R.= 330 GPD
REGULATIONS.
2.
PRIOR TO BACK FILLING THE INSTALLATION, THE DESIGNER 5 HEALTH AGENT SHALL BE NOTIFIED FOR INSPECTION.
2. SEPTIC TANK CAPACITY: 330 GPD X 2 = 660 GPD
3.
ANY ALTERATIONS OF THIS DESIGN MUST BE APPROVED BY THE DESIGNER 6 BOARD OF HEALTH, IN WRITING.
USE (1)1500- GALLON (H-10) SEPTIC TANK
4.
SYSTEM IS NOT DESIGNED FOR A GARBAGE GRINDER.
5.
THE INSTALLER IS TO VERIFY THE LOCATION(S) OF UTILITIES, CESSPOOL(S) AND SEWER INVERTS PRIOR TO
3. LEACH FACILITY DESIGN: 30.0' X 10.0' X 2.0' (H-10)
CONSTRUCTION.
SIDE WALL AREA: 2 (30.0 + 10.0) X 2.0 X 0.74 GPD/SF = 118.4
6.
ALL UNSUITABLE MATERIAL WITHIN 5 FT. IN ALL DIRECTIONS FROM THE SOIL ABSORPTION SYSTEM SHALL BE
BOTTOM AREA: 30.0 X 10.0 X 0.74 GPD/SF = 222.0
REMOVED A REPLACED W/CLEAN, COARSE SAND.
TOTAL: 340.4
7.
ALL FILL MATERIAL UTILIZED FOR THE SOIL ABSORPTION SYSTEM SHALL BE CLEAN, COARSE SAND FREE FROM
DELETERIOUS MATERIAL AND SHALL HAVE A PERCOLATION RATE OF LESS THAT 2 MIN./IN. BEFORE 6 AFTER PLACEMENT.
340 GPD PROVIDED % 330 GPD REQUIRED
8.
EXISTING CES5POOL(5) TO BE PUMPED AND BACK FILLED PER TITLE 5 ABANDONMENT PROCEDURES.
9.
DURING INSTALLATION, THE CONTRACTOR I5 RESPONSIBLE TO PROVIDE A SAFE EXCAVATION AREA.
USE: (3) 8.5' L X 4.8' W X 2.0' D CHAMBERS (H-10) WITH 2.25'
10.
GROUND COVER OVER SEPTIC SYSTEM COMPONENTS SHALL NOT EXCEED 36".
OF 3/4" TO 1-1/2" DOUBLE WASHED STONE ALONG ENDS AND
11.
ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE NOTED. THE MINIMUM SLOPE OF 4" DIA.
2.6' ALONG SIDES.
SCH 40 PVC SHALL NOT BE LESS THEN 0.01 FT/FT.
12.
WHEREVER SEPTIC LINES CROSS WATER SERVICE LINES OR WHEN WATER SERVICE LINES COME WITHIN 10' OF THE
PROPOSED S.A.S.- PIPES SHALL BE CLASS 150 PRESSURE PIPE & SHOULD BE PRESSURE TESTED TO ASSURE WATER
TIGHTNESS. COORDINATE WITH LOCAL WATER DEPARTMENT.
13.
F F PLAN
PLACE MAGNETIC MARKING TAPE OVER ALL COMPONENTS. S 1TE AND SEWAGE PLAN
CONSTRUCTION NOTES
SUBJECT: 1 Mariners Lane
Yarmouth Port, MA
1. CONTACT OFFICE (508-432-2878) A MINIMUM OF 48 HOURS
PRIOR TO START OF PROJECT.
2. EXISTING SEWER ELEVATION I5 TO BE VERIFIED PRIOR TO THE INSTALLATION OF NEW SYSTEM COMPONENTS. PREPARED FOR.,
Michael King
3. REPLACE SEWER LINES BACK TO ORIGINAL CAST IRON OR PVC AS NEEDED. INSTALL TWO-WAY SWEEPS WITH 4" PVC
CLEAN OUTS TO GRADE BETWEEN DWELLING AND PROPOSED SEPTIC TANK AS SHOWN. PROVIDE IRRIGATION ASSESSORSID: sir.
CONTROL BOX COVERS OVER CLEAN OUTS.
132-87 1 SHEET 2 of 2
4. EXISTING CESSPOOLS ARE TO BE PUMPED A REMOVED ALONG WITH ALL CONTAMINATED SOILS WITHIN 5' OF
PROPOSED SAS.
5. DESIGN ENGINEER IS TO VERIFY SOILS OF ALL SAS EXCAVATIONS PRIOR TO SYSTEM INSTALLATION.
6. DESIGN ENGINEER IS TO VERIFY SYSTEM INSTALLATION (LOCATIONS AND ELEVATIONS) PRIOR TO BACKFILLING.
7. COMPONENTS ARE TO BE WITHIN 3' OF FINISHED GRADE AND ARE TO HAVE A MINIMUM OF i' OF SOIL COVER.
ACCESS MANHOLES ARE TO BE WITHIN 3"-6" OF FINISHED GRADE.
B. ALL POST CONSTRUCTION LANDSCAPING DETAILS ARE TO BE BETWEEN INSTALLER AND PROPERTY OWNER OR AGENT.
08/26/2019
19-169
Moran Engineering Associates, LLC
941 Route 28 N PO Box 183
South Harwich, MA 02661
508-432-2878