Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH 7S i SEWAGE PLAN REVIEW CHECKLIST Location: AM S 7 LOT C/7 Date of Subdivision Approval if; 021-e Street 5-6 ./d..2e/ // Zone of Contribution: In 'i Out Village Z/- • `� Commercial Residential Owner: ,erK7 t 7 Installer �-<��° Builder: Engineer �� -A % P 1 P A. /frl/ N/A YES /NO 1. Required number of copies received. ,./ 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) L/ 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown-NGVD if near wetlands. L�" 7. Building sewer does not exit center of house. ./ 8. Septic tank a minimum of 10 feet from house and deck. 9. Leaching a minimum of 20 feet from house and 10 feet from deck. L...----- 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. ✓ 12. System meets all other setback requirements. ,/ 13. Uses adjustment for maximum high groundwater. 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. (_- 15. System not in top or subsoil or 5 foot removal. t/ 16. Proposed contours are suitable. 17. System meets slope requirements - min. 1/8". 1/4" preferred. t 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper. gas baffle on outlet tee. �20. Sewage flow under 10.000 gpd for parcel. / 21. No garbage disposal. \'..L://7/ 422. System adequately sized for its intended use. 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. e / 25. Electrical permit for pump chamber. �-- 26. Pump system - 2" line. weep hole. check valve, sanitary in d-box. alarm on separate circuit. 27. Septic tank and pump chamber to be Factory waterproofed. t/ 28. Vent provided if leaching below 3 feet or under driveway or parking= L/ 29. Engineer to inspect and certify_ a. clay removal b. wall construction schedule `/ c: commercial system •/ 30. Engineer and Land Surveyor stamp and signature. t./ 31. H2O loading when system subject to vehicular traffic. „/ 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 3L 1986 - Nitrate Loading, (....-/- 35. .�35. Subdivided prior to April 7. 1989 - Phosphorus Zone 300'. L.-/ Plan reviewed by: j,