7S i SEWAGE PLAN REVIEW CHECKLIST
Location: AM S 7 LOT C/7 Date of Subdivision Approval
if; 021-e
Street 5-6 ./d..2e/ // Zone of Contribution: In 'i Out
Village Z/- • `� Commercial Residential
Owner: ,erK7 t 7 Installer �-<��°
Builder: Engineer �� -A % P 1 P A. /frl/
N/A YES /NO
1. Required number of copies received. ,./
2. Date of soils exam and percolation test not older than 2 years.
3. 4 feet of naturally occurring pervious material, above water table(new construction) L/
4. Foundation 2 feet above high point of fronting road for new construction.
5. Water availability letter from Water Department for new construction.
6. Benchmark indicated and shown-NGVD if near wetlands. L�"
7. Building sewer does not exit center of house. ./
8. Septic tank a minimum of 10 feet from house and deck.
9. Leaching a minimum of 20 feet from house and 10 feet from deck. L...-----
10. Leaching a minimum of 100 feet from wetlands.
11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. ✓
12. System meets all other setback requirements. ,/
13. Uses adjustment for maximum high groundwater.
14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. (_-
15. System not in top or subsoil or 5 foot removal. t/
16. Proposed contours are suitable.
17. System meets slope requirements - min. 1/8". 1/4" preferred. t
18. System meets breakout requirements- peastone elevation carried out 15 feet minimum.
19. Specified tee sizes are proper. gas baffle on outlet tee.
�20. Sewage flow under 10.000 gpd for parcel. /
21. No garbage disposal. \'..L://7/
422. System adequately sized for its intended use.
23. Minimum 6" stone or mechanically compacted below the tank and d-box.
24. Manhole covers within 6" of grade - septic tank and pump chamber. e /
25. Electrical permit for pump chamber. �--
26. Pump system - 2" line. weep hole. check valve, sanitary in d-box. alarm on separate circuit.
27. Septic tank and pump chamber to be Factory waterproofed. t/
28. Vent provided if leaching below 3 feet or under driveway or parking= L/
29. Engineer to inspect and certify_ a. clay removal
b. wall construction schedule `/
c: commercial system •/
30. Engineer and Land Surveyor stamp and signature. t./
31. H2O loading when system subject to vehicular traffic. „/
32. Title V application and fee signed by a licensed installer.
33. Foundation footing 2 feet above adjusted water table.
34. Lot subdivided prior to July 3L 1986 - Nitrate Loading, (....-/-
35.
.�35. Subdivided prior to April 7. 1989 - Phosphorus Zone 300'. L.-/
Plan reviewed by: j,