Loading...
HomeMy WebLinkAboutReview ChecklistI v TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AM.5 LOT v8 Date of Subdivision Approval 1 Street / l.&/G1-11-1/ Z--",476::-. Zone of Contribution: I -01Out Village C/ -s Commercial 'esidential Owner: f{/Gi/p5 Installer f.Wra X777 >7/ 93?7 Builder: Engineer _WA/ C -A0,4*- 4 i 46• "Q.- l5-4/ N/A YES NO 1. Required number of copies received. }Q 2. Date of soils exam and percolation test not older than 2 years. '5<- 3. 4 feet of naturally occurring pervious material, above water table(new construction) X 4. Foundation 2 feet above high point of fronting road for new construction. X 5. Water availability letter from Water Department for new construction. XC 6. Benchmark indicated and shown- NGVD if near wetlands. 7. Building sewer does not.exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. 9. Leaching a minimum of 20 feet from house and 10 feet from deck. 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. A 13. Uses adjustment for maximum high groundwater. 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. 15. System not in top or subsoil or 5 foot removal. 16. Proposed contours are suitable. 17. System meets slope requirements - min. 1/8", 1/4" preferred. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. 19.Specified tee sizes are proper. gas baffle on outlet tee. 20. Sewage flow under 10,000 apd for parcel. 21.No garbage disposal. 22.=Svstem adequately sized for its intended use. 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box. alarm on separate circuit.k 27. Septic tank and pump chamber to be Factory waterproofed. 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. 31. H2O loading when system subject to vehicular traffic. X _ 32. Title V application and fee signed by a licensed installer. X 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior to April 7, 1989 - Pho( horus Zone 300'. . Plan reviewed by: / -�"U