October 10, 2019
Town of Yarmouth
Conservation Commission
1146 Route 28
South Yarmouth, MA 02670
Attn: Kelly Grant, Conservation Administrator
RE: Request for a Certificate of Compliance, 40 Thacher Shore Road,
Yarmouth Port, Massachusetts; DEP File# SE83-2155
BSC Job #49672.01
Dear Ms. Grant and Members of the Conservation Commission:
Please accept this Request for a Certificate of Compliance on behalf of John Randall (the
Applicant) for the project authorized in the Order of Conditions (DEP File #SE83-2155)
for the property located at 40 Thacher Shore Road, Yarmouth Port, Massachusetts (the
Site). The proposed project at the Site involved the repair of an existing septic system, the
replacement of an existing wooden retaining wall with modular blocks, and a portion of a
wooden wall was proposed to be replaced with stone. A site inspection was conducted by
a BSC Wetland Scientist on September 18, 2019 to assess the condition of jurisdictional
Resource Areas on Site and to confirm that the proposed work was completed as within
substantial compliance with the approved plans. BSC was informed by the owner that in
a conversation with the Agent of Yarmouth it was decided that a line of shrubs would be
planted at the edge of the delineated limit of Bordering Vegetated Wetland in lieu of a
single-rail fence. All other areas of work were determined to be completed within
substantial compliance of the Order of Conditions (OOC) issued on May 7, 2018 under
DEP File#83-2155. As such, we are requesting a Certificate of Compliance for this
project.
Enclosed please find the following information:
1. WPA Form 8A - Request for Certificate of Compliance Form
2. Copy of the Order of Conditions
3. Site Photographs
4. As-Built Plan
Please review this Request for a Certificate of Compliance documenting compliance with
the Order of Conditions and inform us if you have any questions or require additional
information at (508) 778 - 8919.
Regards,
BSC GROUP, INC.
Hannah Raddatz
Wetland Scientist
cc: John Randall, 40 Thacher Shore Road, Yarmouth Port, MA 02675
Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231
Administrative Checklist
Certificate of Compliance
General Information:
All filings must be made on Town of Yarmouth forms.
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule
Failure to follow the Administrative Checklist guidelines shall result in an Administrative
Incomplete Application and will not be advertised for a Public Hearing.
Contact the office if you need assistance. We will be happy to help guide you through the process.
Submitting an Application:
______ 1 original application with original signatures
______ 1 pdf of application, plan/sketch, and other supporting information emailed
to kgrant@yarmouth.ma.us
______ Statement from Engineer or stamped As-Built plan, refer to 310 CMR 10.05(9)(d)
______ Local filing fee – Refer to fee schedule, Check payable to “Town of Yarmouth”
DEPARTMENT
OF
CONSERVATION
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
DEP File Number:
83-2155
Provided by DEP
A. Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
1. This request is being made by:
John Randall
Name
40 Tacher Shore Road
Mailing Address
Yarmouth Port
City/Town
MA
State
02675
Zip Code
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
John Randall
Applicant
5/7/2018
Dated
83-2155
DEP File Number
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
3. The project site is located at:
40 Thacher Shore Road
Street Address
Yarmouth Port
City/Town
121
Assessors Map/Plat Number
65
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
John Randall
Property Owner (if different)
Barnstable
County
18849
Book
302
Page
Certificate (if registered land)
5. This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
DEP File Number:
83-2155
Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).
Photo 1: View of area where septic system was replaced. Looking east.
Photo 2:View of modular block retaining wall. Looking south.
Site Photographs
September 18, 2019
40 Thacher Shore Road
Yarmouth Port, MA
Page 1
Photo 3:View of modular block retaining wall. Looking north.
Site Photographs
September 18, 2019
40 Thacher Shore Road
Yarmouth Port, MA
Page 2