Loading...
HomeMy WebLinkAboutReview Checklist 6 r(q''/9 &toe Ly/ G/7- �Q9b ~i'l) /thi�/ /h Y TOWN OF YARMOUTH ,, 5 // e�C/ SEWAGE PLAN REVIEW CHECKLIST -,* tj/ e. 1 1C(/fj s ` u"� Location: A.M. 1 G � Lot . Zone of Contribution: In 'but_ Acreage �� Z YLr `` Street: 41 1‘,/ 4(0,i/, Commercial: Residential: 4......." Village: fr(/✓, i Floor Plan: #Bedrooms: Owner: /50, l" 4% /��.�d�: Y Installer: 7 Address: Phone: - IC- Phone: IC Phone: 4r/7 7_, / , t( .� Builder: 77EngineertC Address: Phone: 9 R/(1 Phone: / Olj N/A YES NO 1.Required#of copies received t/ 2.Date of soils exam and percolation test not older than 2 years c.......-- 3.4-5 ft of naturally occurring pervious material, above water table C----- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: (...-------- 5. Water line 10 ft from septic components Var.: 4.----r 6.Benchmark indicated and shown-NGVD if near wetlands t---- 7. Septic tank minimum 10 ft from foundation, deck Var.: ✓ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: ,t___- 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,------ 11. 11.Tank/leaching minimum 10 ft from property line Var.: 1/4.------ 12. System meets all other setback requirements Var.: _ �..- 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5'removal 16.Proposed contours are suitable 1/ 17. System meets slope requirements-min. 1/8", ' "preferred t----- 18. System meets breakout requirements PVC liner: Wall: �----< 19. Specified tee sizes are proper,gas baffle on outlet tee �/ 20. Sewage is under 10,000 gpd for parcel ......----- 21. ,.s21.No garbage disposal (...------' 22. System adequately sized for its intended use (...-------- 23.Minimum 6"stone or compacted below tank and dbox (...------ 24. /24.Manhole covers within 6"of grade,pump chamber cover to grade t......----- 25. /25.Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes c...,---- 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size .._..-------- 28. Septic tank/pump chamber to be factory waterproofed V/ 29.Vent provided if leaching below 3 feet,under driveway/parking ®---' 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: -'--"" 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater ,,----- 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house ®' 36.Deed Restriction required max. #bedrooms: max.flow: gpd �"*"--- 37.Check area lots for groundwater/Label groundwater in Assessor's Ma, Plan reviewed by: 6/03/03