HomeMy WebLinkAboutReview Checklist 6 r(q''/9 &toe Ly/ G/7- �Q9b ~i'l) /thi�/ /h
Y TOWN OF YARMOUTH ,,
5 // e�C/ SEWAGE PLAN REVIEW CHECKLIST -,* tj/ e. 1 1C(/fj s
` u"�
Location: A.M. 1 G �
Lot . Zone of Contribution: In 'but_ Acreage ��
Z YLr ``
Street: 41 1‘,/ 4(0,i/, Commercial: Residential: 4......."
Village: fr(/✓, i Floor Plan: #Bedrooms:
Owner: /50, l" 4% /��.�d�: Y Installer: 7
Address: Phone: - IC-
Phone:
IC
Phone: 4r/7 7_, / , t( .�
Builder: 77EngineertC
Address: Phone: 9 R/(1
Phone:
/ Olj
N/A YES NO
1.Required#of copies received t/
2.Date of soils exam and percolation test not older than 2 years c.......--
3.4-5 ft of naturally occurring pervious material, above water table C-----
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: (...--------
5. Water line 10 ft from septic components Var.: 4.----r
6.Benchmark indicated and shown-NGVD if near wetlands t----
7. Septic tank minimum 10 ft from foundation, deck Var.: ✓
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9.Leaching minimum 100 ft from wetlands Var.: ,t___-
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,------
11.
11.Tank/leaching minimum 10 ft from property line Var.: 1/4.------
12. System meets all other setback requirements Var.: _ �..-
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5'removal
16.Proposed contours are suitable 1/
17. System meets slope requirements-min. 1/8", ' "preferred t-----
18. System meets breakout requirements PVC liner: Wall: �----<
19. Specified tee sizes are proper,gas baffle on outlet tee �/
20. Sewage is under 10,000 gpd for parcel ......-----
21.
,.s21.No garbage disposal (...------'
22. System adequately sized for its intended use (...--------
23.Minimum 6"stone or compacted below tank and dbox (...------
24.
/24.Manhole covers within 6"of grade,pump chamber cover to grade t......-----
25.
/25.Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes c...,----
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size .._..--------
28. Septic tank/pump chamber to be factory waterproofed V/
29.Vent provided if leaching below 3 feet,under driveway/parking ®---'
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial: -'--""
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater ,,-----
34.Title V Application and permit fee, installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house ®'
36.Deed Restriction required max. #bedrooms: max.flow: gpd �"*"---
37.Check area lots for groundwater/Label groundwater in Assessor's Ma,
Plan reviewed by: 6/03/03