HomeMy WebLinkAboutEngineered Plans - Rev. 2019GRANITE CURB UTILITY POLE SOUTH YARMOUTH moo• �cb
PROPOSED CONTOUR BERM O
® PROPOSED SPOT GRADE n
!j pZ pJ
--98-- EXISTING CONTOUR G i 0
+ 96.52 EXISTING SPOT GRADE \
W— EXISTING WATER SERVICE O`er,TELE MH \\ J'>, MAIN ST.
® TEST PIT Permit -!416r -for REPAIR OI PPIG, SYSTEM• 2$ WILLOW ST.
SCALE: 1"=20' ,`pc \ �9� ONI ioi ,to State and LocalI septic'_ variances. pv�E.p
Boat ll �It;e review and appro al is required for R 2� LOCUS
X\ anN tune additions/rem,vatii 3/alterations' .to
sr 1 laci0ates and/or sfructures/t welling. �0�
F
0 g5 � � ;v�aror�outh Health Uenartmcnt �0
LOCUS MAP
P' ) EXIST LEACH PIT 03 �pG�' // ylt ®ate LOCUS INFORMATION
�j PROP. 1,500G \ / '� PLAN REF: 192/105
102 0_ 03 2—COMPARTMEN / t" PARCEL D: MAP4041 OLOT 28.1
SEPTIC TANK(H � 0) / I— O T 1 09 03
�
22,486f S.F. FLOOD ZONE: "X"
(0.52f AC.) �� COMMUNITY PANEL: 25001CO589J DATED:07/16/14
��- U 5o F SEPTIC SYSTEM
'd REPAIR g ---� REPAIR PLAN
C'q�'
U T �� LOCATED AT:
50 909 ROUTE 28
SOUTH YARMOUTH, MA
PREPARED FOR
UN 2
LONE TREE LLC/
oNw`� UNI 1 6 OS ROSS JOLY
6 OS AUGUST 26, 2019 REV: OCT. 14, 2019
02 /• \\ F\.��� � p� ��cHQFM.assq ����� OF Mgssq� 1
BENCHMARK TOP OF
JOHN °ya o D RREN 9G
CONCRETE BOUND \ �� — — 00 / U� DEMAREST, JR. mNuIEYER``' y
EL=102.6' (ASSUMED) \ ��F- �� / 1$� o Na, 114U
No. 36854
11 •Q P
vSl
i �► GF' �� / / / Gro 1,�, �O,�4 Rv y u �u S NCI ARS
00 1 X
� 1 to
v
�� I \ G
0 __— oo X MEYER 8c SONS, INC.
v z STORAGE
do X P.O. BOX 981
cw `
y Z_?' c'o G 00 � UNIT 5 `�
EAST SANDWICH, MA. 02537
GE CONCRETE 600SF ��� PH: (508)360-3311
X N FAX: (774)413-9468
PO1
�FE STEPS FLOOR PLAN meyerandsonstitle5@gmail.com
Q X c'\0c BASEMENT
UNIT 5 = NO BATHROOM SHEET 1 OF 2 J 2059
G
II
ELEV. TOP
FOUNDATION
(Existing)
= 104.10-
®INV. 101.
® INV. 102.02
INSTALL H2O METAL RINGS/RISERS TO FINISH GRADE ON SEPTIC TANK
NOTE: PLACE MAGNETIC MARKING TAPE OVER ALL COVERS
BRING ALL COVERS TO WITHIN 3" OF FINISH GRADE
.G.EL: 103.0 , 11 102.95 F.G. EL: 102.7
F.G.EL: 101.30
"
�10"I I U -
14" 14" 14"
INV. 100.25 TEE'S ARE TO BE
4" SCH 40 PVC kA7H
1,000G r INV. 100.00
COMP. GAS J
:�
BAFFLE n A CCI C
PROPOSED 1,000/500 GALLON
2 --COMPARTMENT H2O SEPTIC TANK
NOTES:
1) CONTRACTOR SHALL VERIFY ALL EXISTING
PIPE INVERTS PRIOR TO CONSTRUCTION
2) D -BOX SHALL BE SET LEVEL AND TRUE TO
GRADE ON A MECHANICALLY COMPACTED SIX
INCH CRUSHED STONE BASE, AS SPECIFIED IN
310 CMR 15.221(2)
3) REPLACE EXISTING 1,000 GALLON SEPTIC TANK
WITH 1500 GALLON H-20, 2 -COMP SEPTIC TANK
IF FAILED, DAMAGED OR UNDERSIZED.
4) INSTALL INLET & OUTLET TEES W/
GAS BAFFLE AS REQUIRED
GENERAL NOTES:
1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL
BOARD OF HEALTH AND THE DESIGN ENGINEER.
2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS
OF THE STATE ENVIRONMENTAL CODE, TITLE V. AND ANY APPLICABLE
LOCAL RULES AND REGULATIONS.
3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR
TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE
DESIGN ENGINEER.
4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING
FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN
ENGINEER BEFORE CONSTRUCTION CONTINUES.
5. ALL ELEVATIONS BASED ON ASSUMED DATUM.
6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF
THE CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF
HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION.
7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE.
8. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED
TO A CONDITION AGREED UPON BETWEEN OWNER AND CONTRACTOR.
9. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
THE LOCATION OF ALL UNDERGROUND UTILITIES. PRIOR TO BEGINNING
CONSTRUCTION.
10. EXISTING TANK AND LEACHING TO BE PUMPED. CRUSHED AND REMOVED PER TITLE 5.
REPLACE WITH CLEAN MEDIUM SAND PER TITLE 5.
11. 48 HOUR NOTICE FOR ENGINEER CERTIFICATION
12. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY
AND IS NOT TO BE CONSIDERED A PROPERTY LINE SURVEY
13. NO PRIVATE WELLS WITHIN 150' OF PROPOSED LEACHING.
14. NO WETLANDS WITHIN 100' OF PROPOSED LEACHING.
15. ALL PIPING TO BE 4" SCH 40 0 1/8"/FT (UNLESS SPECIFIED)
C
FINISHED GRADE (102.6)
MAINTAIN 2% MIN SLOPE OVER LEACHING AREA
2" OF 3/8" DOUBLE WASHED
STONE OR FILTER FABRIC
4" SCH 40 PVC
0aaff. O Room
®®®®®®®®®®®
INV. 99.50 I I ®S= 1% (MIN.)
2' EFF. DEPTH
INV. 99.30
PROPOSED DB -3
DISTRIBUTION BOX
(H20) INV. ELEV.= 98.80
OfEN Mgss9
M. yam. TOP CONC. ELEV.= 99.80
/1 INV. ELEV.= 98.80 -
3' / I 2 X 8.5'
1 40
SEPTIC SYSTEM PROFILE
BOTTOM EL.= 96
SEPARATION 5.72 FT.
BOTTOM OF TESTHOLE EL: 91.08
SOIL
LOGS
DATE: JULY 17, 2019
SOIL EVALUATOR: DARREN MEYER, R.S., CSE #1614
WITNESS: AMY VON HONE, YARMOUTH AGENT
Elev. TP -1 Depth
102.50 A 0"
LOAMY SAND
10YR 3/2
100.50 24"
B
LOAMY SAND
10YR 5/8
98.83 44."
C
PERC TEST MS�ANIUD
m Ei.. 51.30
PERC RATE <2 MIN/IN. ('Cl* HORIZON)
NO GROUNDWATER OBSERVED
• I, Darren M. Meyer, R.S., CSE, hereby certify that I am currently approved by MADEP pursuant to 310 CMR 15.017
to conduct soil evaluations and that the above analysis has been performed by me consistent with the
requirements of 310 CMR 15.017. 1 further certify that I have passed the Soil Eval. Exam in October, 1999.
3/4" - 1-1/2"
DOUBLE WASHED
3'
DESIGN CRITERIA
DESIGN CRITERIA: (5 UNITS) 2.900 SF OF OFFICE x 75GPD/1,000SF = 217.5 GPD
SOIL TEXTURAL CLASS: CLASS 1 (0.74 GPD/SF)
DESIGN PERCOLATION RATE: <2 MIN/IN
GARBAGE GRINDER: NO (not designed for garbage grinder)
SEPTIC TANK: 218 gpd x 200% = 436 gpd
USE PROPOSED 1,50OG H-20 2 -COMPARTMENT (1,000G/500G) SEPTIC TANK
LEACHING AREA REQUIRED: (218)/0.74 = 294.59 S.F.
USE TWO (2) 500 GALLON PRECAST LEACH CHAMBERS W/
3' STONE ON ALL SIDES: 23' L x 11' W x 2'D
BOTTOM AREA: 23 x 11 = 253 SF
SIDE AREA: (23 + 11) X 2 X 2 = 136 SF
TOTAL SQUARE FEET PROVIDED = 389 vs. 294.59 REQ'D
DESIGN FLOW PROVIDED: 0.74(389 S.F.) = 287.8 G.P.D. vs. 218 G.P.D. req'd
PROPOSED SEPTIC SYSTEM UPGRADE PLAN
909 ROUTE 28, SOUTH YARMOUTH, MA
Prepared for: LONE TREE LLC Ross Jol
Design and Site Plan by: SCALE DRAWN DATE
MEYER& SONS, INC. N.T.S. DMM 08/26/19
PO BOX981 REV DATE
EASTSANDW/CH, MA 02537 CHECKED SHEET NO.
508.362-2922 10/14/19 DMM 2 of 2
2.5Y 7/4
91.08
137"
PERC RATE <2 MIN/IN. ('Cl* HORIZON)
NO GROUNDWATER OBSERVED
• I, Darren M. Meyer, R.S., CSE, hereby certify that I am currently approved by MADEP pursuant to 310 CMR 15.017
to conduct soil evaluations and that the above analysis has been performed by me consistent with the
requirements of 310 CMR 15.017. 1 further certify that I have passed the Soil Eval. Exam in October, 1999.
3/4" - 1-1/2"
DOUBLE WASHED
3'
DESIGN CRITERIA
DESIGN CRITERIA: (5 UNITS) 2.900 SF OF OFFICE x 75GPD/1,000SF = 217.5 GPD
SOIL TEXTURAL CLASS: CLASS 1 (0.74 GPD/SF)
DESIGN PERCOLATION RATE: <2 MIN/IN
GARBAGE GRINDER: NO (not designed for garbage grinder)
SEPTIC TANK: 218 gpd x 200% = 436 gpd
USE PROPOSED 1,50OG H-20 2 -COMPARTMENT (1,000G/500G) SEPTIC TANK
LEACHING AREA REQUIRED: (218)/0.74 = 294.59 S.F.
USE TWO (2) 500 GALLON PRECAST LEACH CHAMBERS W/
3' STONE ON ALL SIDES: 23' L x 11' W x 2'D
BOTTOM AREA: 23 x 11 = 253 SF
SIDE AREA: (23 + 11) X 2 X 2 = 136 SF
TOTAL SQUARE FEET PROVIDED = 389 vs. 294.59 REQ'D
DESIGN FLOW PROVIDED: 0.74(389 S.F.) = 287.8 G.P.D. vs. 218 G.P.D. req'd
PROPOSED SEPTIC SYSTEM UPGRADE PLAN
909 ROUTE 28, SOUTH YARMOUTH, MA
Prepared for: LONE TREE LLC Ross Jol
Design and Site Plan by: SCALE DRAWN DATE
MEYER& SONS, INC. N.T.S. DMM 08/26/19
PO BOX981 REV DATE
EASTSANDW/CH, MA 02537 CHECKED SHEET NO.
508.362-2922 10/14/19 DMM 2 of 2