Loading...
HomeMy WebLinkAboutReview Checklist y . TOWN OF YARMOUTH tel' 7 7 SEWAGE PLAN REVIEW CHECKLIST Location: AM -2-3 LOT ?.').Z___ Date of Subdivision Approval Street /- / ?-.Q Zone of Contribution: In Out -.=Village GG,fr/960fr vi2,,e-ACommercial Residential ' Owner: .7.4:1 c F ('h 1� 1 Installer /4 v 6-47,71s 3D2 /--- e- v _4 / ,r%ovv 594 /6(2 9#-263 - -o. _ 0 ) ' or7/7 , Builder: 6-C /G11, (Steri 1J S Engineer c--vu pi,7 Ci GuaY GG i-r 7� GG S--c/-c(_ a L) ST bufees, 4i3O2-66D N/A YES NO 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. t ....---7- 3. 4 3. 4 feet of naturally occurring p vious material. above water table(new construction) 4. Foundation 2 feet above lugh_pomt of fronting road for new construction. „_________„..- 5. Water availability letter from Water Department for new construction. t.,..----" 6. Benchmark indicated and shown-NGVD if near wetlands. , ------ 7. 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. 9. Leaching a minimum of 20 feet fromhouse and 10 feet from deck. 10. Leaching a minimum of 100 feet from wetlands. ___----- 11. --/11. Leaching a minimum of 1_50 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. 13. Uses adjustment for maximum higroundwater. 1/4----- 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. t------", 15. System not in top or subsoil or 5 foot removal. 16. Proposed contours are suitable. 17. System meets slope requ s- min. 1/8". 1/4" preferred. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper. . • ba>(Ile on outlet tee. /' 20. Sewage flow under 10.000 i•• for parcel. L, , 21. No garbage disposal. ,/ • 22. System adequately sized.for its Winded use. 23. Minimum 6" stone or mechanically compacted below the tank and d-box. k_,/- 24. Manhole covers within 6" of grade - septic tank and pump chamber. ✓ - 25. Electrical permit for pump chamber. �__--- . 26. Pump system - 2" line. weep hole, check valve. sanitar in d-box. alarm on separate circuit. 27. Septic tank and pump chamber to be Factory water 28. Vent provided if leaching below 3 feet or under driveway or parking, (___- -- 29. /'29. Engineer to inspect and certify : a. clay removal b. wall construction schedule .,/ c: commercial system 30. Engineer and Land Surveyor stamp and signature, 31. H2O loading, when system subject to vehicular traffic_ 32. Title V application and fee signed by a licensed installer. • tt>f 1 g • , • 1 1 ' •_ K • ILIV- . . l W. _ . , - L------- 34. Lot subdivided pnor to July 31. 1986 - Nitrate Loa.', 35. Subdivided prior to April 7. 1989 - Phos .torus Zone(cA 3$ I's Plan reviewed by: