HomeMy WebLinkAboutReview Checklist rl9 TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. ri..--• Lot 'il Zone of Contribution: In Out_Acreage
'57 /f "' • Commercial: Residential: �--
Street: �/ C /
Village: (/j, 1` Floor Plan: ✓ #Bedrooms: 7------
Owner: Installer Arlerjr gJ £p
Address: Phone:
Phone:
Builder: Engineer:
./V7-''''. '
Cf-.,(..SAddress: Phone: �---M2- Z
Phone:
N/A YES NO _
1.Required#of copies received Ci.'
2.Date of soils exam and percolation test not older than 2 years (....----
3.4-5
.f3.4-5 ft of naturally occurringpervious materia)z above water table �,,-,
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: k --
5.Water line 10 ft from septic components Var.: L.-----
6.Benchmark indicated and shown-NGVD if near wetlands t�-----
7.Septic tank minimum 10 ft from foundation,deck Var.: L.-----
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t/
9.Leaching minimum 100 ft from wetlands Var.: ...----,-
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: `/
11.Tank/leaching minimum 10 ft from property line Var.: c.--..-
12.System meets all other setback requirements Var.: �-----
13.Uses adjustment for maximum high groundwater Var.: 1/4.-......-
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: _ k._..---:
15.System not in top or subsoil(A,B horizons)or 5'removal `---.-
16.Proposed contours are suitable ._-.
_ 17.System meets slope requirements-min. 1/8", %4"preferred
C
18. System meets breakout requirements PVC liner: Wall: l._1
19.Specified tee sizes are proper,gas baffle on outlet tee �-----.
20.Sewage is under 10,000 gpd for parcel l,
21.No garbage disposal (.i-
22.System adequately sized for its intended use L�
. 23.Minimum 6"stone or compacted below tank and dbox L1
24.Manhole covers within 6"of grade,pump chamber cover to grade `f
25.Inspection port on plastic chambers/leach field L.---,,.
26.Electrical permit for pump chamber/Separate meter for duplexes _ t..._..----'
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28.Septic tank/pump chamber to be factory waterproofed `/
29.Vent provided if leaching below 3 feet,under driveway/parking t.�-.""
30.Buoyancy calculations for tank/pump chamber �`,
31.Engineer to inspect and certify soils: wall: commercial: c......------
32.
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature %.„/
33.H-20 loading is subject to vehicular traffic,groundwater ✓'
34.Title V Application and permit fee,installer signature -
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max.flow: gpd 'r
37.Check area lots for groundwater/Label groundwater in Assessor's Map ..-"--_
Plan reviewed by: Utl6ro30